Party A's Speech at Completion Acceptance
In our daily life, speech plays an increasingly important role among us. The speech is a practical manuscript and a written material for the speech. There are many precautions in writing a speech. Are you sure you can write it? The following is the speech of Party A's completion acceptance that I collected for you. Welcome everyone to refer to it, I hope it will help you.
Party A's speech on completion acceptance 1 First of all, I sincerely thank the leaders of the Municipal Quality Supervision Station and all parties involved in the construction for taking time out of their busy schedules to participate in the completion acceptance of the Agricultural Reclamation Building. With the strong support and concern of the leaders of relevant departments, through the joint efforts of survey, design, supervision, construction, quality supervision and the owner unit, and through intense construction, the continuous construction of the agricultural reclamation building and the transformation of the podium have completed all the tasks agreed in the contract. Our company has paid the project payment according to the contract and signed the project quality warranty with the construction unit. Project approval materials and related procedures are complete. The related construction of this project is briefly reported as follows:
I. Basic information of the project
The project is located at No.2 Huatang Road, Jiangbei District, with a total area of 4,879 ㎡ and a total completed construction area of 42,922. 36㎡, adopting frame structure, with a total building height of 99. 5 meters, ***29 floors (27 floors above ground and 2 floors underground), the project started construction on xx1October 28th 10. This project is invested and constructed by Chongqing Agricultural Investment Group Co., Ltd., designed by MCC CCID Engineering Technology Co., Ltd., entrusted by China Southwest Survey and Design Institute Co., Ltd., supervised by Chongqing Academy of Building Science, and contracted by Chongqing Construction Engineering Second Construction Co., Ltd.
Second, the evaluation of contractors.
The personnel qualification, equipment and post of the project management organization of the survey, design, supervision and construction unit meet the requirements; All parties involved in the construction shall strictly follow the engineering technical standards and construction drawing documents; The signature of relevant construction materials is perfect and the filing meets the requirements; All units shall issue project quality inspection reports; According to the contract, the corresponding work content was completed and the performance was good.
Third, the completion acceptance conclusion
On February 28th, 65438, the supervisor organized the pre-acceptance of this project. The construction party has rectified the problems raised in the pre-acceptance, and we agree to complete the acceptance of the project.
thank you
Chongqing agriculture investment group co., ltd
Moderator: First of all, I would like to thank the leaders of the urban construction department and the comrades of all participating units for their busy schedules to participate in the second phase of our company's project, namely, 03#, 19#, 20 # buildings in Area A and 0 1#, 07#, 10#, 13# and 65438 in Area B.
Moderator: First of all, introduce the personnel who participated in the completion acceptance:
The leader and deputy leader of the completion acceptance team, the personnel of all participating units, the host and the introduction of the project;
The "Ecological Park" residential area developed and constructed by our company is located in the north of Huguang County, with Yanglu Lake in the east, Xu Le Canal in the south, Jiajing Road in the west and Hengzhou Square newly built by the government in the north. It is generally divided into two areas, A and B, and will be constructed in three phases. At present, the first phase of the project has been completed and accepted, and all the construction projects of the second phase have been completed, which is qualified for completion and acceptance.
Building A 03#, Building B0 1#, Building A 20# and Building B 19# are three-story commercial buildings, with one floor height and two or three floors height. Architectural design grade and fire resistance grade: the design grade of residential civil buildings belongs to Grade I, and the unit fire resistance grade is Grade II. Tall buildings; Total construction area of A 03# building1552m2, and B0 1# building's total construction area is 2392m2; The total construction area of 20# in Building A is ㎡; Total construction area of building B 19# ㎡; The main structural form is frame structure. The reasonable service life of the main structure is 50 years, the seismic fortification intensity is 8 degrees, the roof waterproof level is III, and the reasonable service life is 10 year.
Building A 19# is a two-story commercial building with one storey and two floors.
High rice; Architectural design grade and fire resistance grade: the design grade of residential civil buildings belongs to Grade I, and the unit fire resistance grade is Grade II.
Tall buildings; Total construction area ㎡; The main structural form is frame structure. The reasonable service life of the main structure is 50 years, the seismic fortification intensity is 8 degrees, the roof waterproof level is III, and the reasonable service life is 10 year.
Building B07#, building B 10#, building B 13# and building B 16# are six-story frame houses with commercial service outlets, with a height of one meter and some meters; The height of the second floor is1000m; Five layers of local rice, the rest is rice; Architectural design grade and fire resistance grade: the design grade of residential civil buildings belongs to Grade I, and the unit fire resistance grade is Grade II.
Tall buildings; The main structures of building B07#, building B 10#, building B 13# and building B 16# are frame structures, with a reasonable service life of 50 years, a seismic fortification intensity of 8 degrees and a roof waterproof level of Grade III.
The total construction area of the second phase project of "Ecological Park" residential quarter is ㎡.
The main project, indoor water, electricity, heating and other sub-projects have all been completed according to the design requirements of drawings, the outdoor pipe network area A has been completed, and the construction of area B has not been completed. After the self-inspection of the construction unit is completed and reported to the supervision unit for pre-acceptance, the completion acceptance shall be organized.
Moderator: speeches by all participating units:
Moderator: Announce the completion and acceptance of the project.
Developed by XX company, supervised by xxx company, constructed by XXX company and managed by XXX company.
The XXX project surveyed by our company and designed by XXX company started on X, and was completed on X, and then all parties were organized to speak in the order of construction, survey, design, supervision, Party A and quality supervision station.
In the early stage of the project construction, we have obtained the land use certificate and planning permit, and handled the supervision and registration procedures at the quality supervision station. We signed a contract with the design, construction and supervision units, and all the construction parties fulfilled the contract well. Our owner appropriated the project payment according to the contract. In terms of technical data, the blue prints.the design before construction, approval and issuance of engineering changes and negotiation during construction; Quality management: The supervision unit worked hard to make the project pass the initial inspection in strict accordance with the engineering specifications, mandatory standards and related procedures. In the later acceptance stage, design, drawing review, energy conservation, survey and other units issue quality qualification documents. Meteorological lightning protection, atmospheric environment inspection, environmental monitoring, public security fire control, planning, debt settlement office, etc. This project has been accepted. The construction party has made the project quality warranty commitment. With the joint efforts of the construction unit, supervision unit, on-site representative of Party A, design unit and other units, and with the strong support of leaders, this project has been completed. My owner thinks that this project has the conditions for completion acceptance and agrees to the completion acceptance.
Speech on completion acceptance by leaders of Party A's 3 quality supervision station and representatives of all participating units:
Xxxxxx community xx project, which was developed by xx company, supervised by xx company and constructed by XX company, started on, and was completed on, and sincerely invites you to participate in today's' acceptance'. Let me welcome you on behalf of the company. In the early stage of the project construction, the company has obtained the land use certificate and planning permit, and has gone through the supervision and registration procedures at the quality supervision station. Signed contracts with design, construction, supervision and other units, and all parties in the construction performed well. The company allocated the project funds according to the contract. In terms of technical data, the blue prints.the design before construction, approval and issuance of engineering changes and negotiation during construction; Quality management: Control strictly in accordance with engineering specifications, mandatory standards and related procedures, so that the initial inspection of the project is qualified. In the later acceptance stage, design, drawing review, energy conservation, survey and other units issue quality qualification documents. Meteorological lightning protection, atmospheric environment inspection, environmental monitoring, public security fire control, planning, debt settlement office, etc. Residential projects have been accepted. The construction party has made the project quality warranty commitment. At present, several units have completed their projects, and their supporting water supply and drainage, gas, heat, roads and other projects have also been completed, so our unit believes that this project has reached the completion acceptance conditions.
We should make rhetoric more rounded. For example, the construction unit worked hard and the supervision unit worked hard, and the leaders gave strong support to this project. I can see that you have put your heart into it. Will be rewarded)
First of all, I sincerely thank the leaders of the municipal quality supervision station and all parties involved in the construction for taking time out of their busy schedules to participate in the completion acceptance of the Agricultural Reclamation Building. With the strong support and concern of the leaders of relevant departments, through the joint efforts of survey, design, supervision, construction, quality supervision and the owner unit, and through intense construction, the continuous construction of the agricultural reclamation building and the transformation of the podium have completed all the tasks agreed in the contract. Our company has paid the project payment according to the contract and signed the project quality warranty with the construction unit. Project approval materials and related procedures are complete. The related construction of this project is briefly reported as follows:
I. Basic information of the project
The project is located at No.2 Huatang Road, Jiangbei District, with a total area of 4,879 ㎡ and a total completed construction area of ㎡. The frame structure is adopted, and the total height of the building is ***29 floors (27 floors above ground and 2 floors underground). The project started construction on xx1October 28th. This project is invested and constructed by Chongqing Agricultural Investment Group Co., Ltd., designed by MCC CCID Engineering Technology Co., Ltd., entrusted by China Southwest Survey and Design Institute Co., Ltd., supervised by Chongqing Academy of Building Science, and contracted by Chongqing Construction Engineering Second Construction Co., Ltd.
Second, the evaluation of contractors.
The personnel qualification, equipment and post of the project management organization of the survey, design, supervision and construction unit meet the requirements; All parties involved in the construction shall strictly follow the engineering technical standards and construction drawing documents; The signature of relevant construction materials is perfect and the filing meets the requirements; All units shall issue project quality inspection reports; According to the contract, the corresponding work content was completed and the performance was good.
Three. Conclusion of Completion Acceptance On February 28th, 65438, the supervisor organized the pre-acceptance of this project. The construction party has rectified the problems raised in the pre-acceptance, and we agree to complete the acceptance of the project.
thank you
Chongqing agriculture investment group co., ltd
March xx 1 day
Party A's speech on completion acceptance 5 First of all, I sincerely thank the leaders of the quality supervision station for taking time out of their busy schedules to participate in the completion acceptance. With the strong support, cooperation and concern of the leaders of relevant departments, through the joint efforts of all the staff of the survey, design, supervision, construction, quality supervision and construction units, and through intense construction, the xxxxxxxx project has completed all the tasks agreed in the contract. The construction unit shall submit the completion report, which shall be signed by the director; The supervision unit has organized and passed the pre-acceptance, and put forward the project quality evaluation report; Survey and design units put forward survey and design quality inspection reports respectively; Our company has paid the project payment according to the contract and signed the project quality warranty with the construction unit. All materials for approval of this project and related materials and procedures for project approval are complete. I will report the construction of this project to the leaders as follows:
I. Basic information of the project and management of construction procedures
1. The contract entrusts Jiangsu xx Architectural Design Co., Ltd. for survey, China Architectural xx Company for design, Xuzhou xx Co., Ltd. for supervision, and xxx Construction and Installation Engineering Co., Ltd. for construction. Architect: xxx.
2. The project has a building area of 6,750 square meters and a six-story frame. It starts in 20xx 10 and is completed in 20xx 12.
Second, the construction management organization
1. In order to ensure the smooth progress of the project, our company has defined the relevant provisions of project management based on the principles of quality first, safety first and frugality, including clean government, quality, safety, capital use and on-site construction management guarantee measures.
2, the construction unit to implement the project manager and main technical personnel responsibility system, all kinds of personnel responsibilities clear, sound rules and regulations, on-site management and orderly, good engineering order.
Three, the evaluation of engineering design, supervision and construction units
1, the design unit can seriously and responsibly participate in the foundation trench inspection; Participate in the quality acceptance of foundation and related important parts; Participate in the project completion acceptance; Notice of design modification and technical negotiation; Participate in the handling of related engineering quality problems; Engineering quality inspection report issued by the design unit; Complete other contents agreed in the contract and perform the duties of the design unit.
2, supervision unit project management personnel qualification, equipment and in place to meet the requirements; Supervision planning, supervision implementation rules in accordance with the provisions of the preparation, approval; Review materials, components and equipment before they are put into use or installed; Implement witness sampling system; On-site supervision of key parts and key processes.
Manage and ensure quality; Issue quality problem notice and review the rectification results of quality problems; Organize the quality acceptance of working procedures and parts, and participate in the quality acceptance of unit projects; Collect and sort out supervision data, review and supervise the construction unit's data for inspection; Issue the project quality evaluation report of the supervision unit; Complete other contents agreed in the contract and perform them well.
3. The qualification and equipment of the management personnel of the project management department of the construction unit are in place, and the qualification, equipment and equipment of the main professional posts meet the requirements; The construction organization design or construction scheme has been approved and implemented; The construction site shall have technical regulations for construction operation and relevant national codes and standards; According to engineering technical standards and construction drawing documents; Inspection and evaluation of working procedures, parts and unit engineering quality meet the requirements; Timely rectification of quality problems and quality accidents; Collect and sort out complete quality assurance information; Project quality self-evaluation report issued by the construction unit; Complete other contents agreed in the contract and better fulfill your responsibilities and obligations.
Fourth, the project cost management
The contract price of this project is 5.094 million yuan, plus the increase or decrease of design changes. After the completion and acceptance, the warranty money will be deducted and settled by the construction unit and the construction unit. At present, the project settlement work is under review.
Verb (abbreviation of verb) quality management
1, this project is supervised by xx Construction Engineering Quality Supervision Station.
2. The main building materials, all kinds of components and equipment used in the project have certificates, and all kinds of tests are carried out according to the requirements of the specification, and the test report results are all qualified. Among them, concrete specimens and mortar specimens used for load-bearing structures are tested by witness sampling, and the number of tests meets the requirements.
3. There are no quality accidents and other accidents in this project. The construction quality of foundation, main body and roof conforms to the specifications and design requirements, and the roof and floor with waterproof requirements have no leakage.
Six, safe and civilized construction and time limit for a project management
1. Safe and civilized construction management of this project: this project is located in the city center, in order not to affect the office and life of surrounding units and avoid the occurrence of unsafe hidden dangers. The construction unit shall hang safety and civilized construction regulations and construction warning signs at the site, and designate a special person to be responsible for civilized construction management.
Seven. Engineering archives management
In the process of construction, the construction unit shall designate a special person to record, collect and sort out all the information in the process of construction according to the regulations on the management of construction engineering data, and the construction unit shall cooperate closely. As the project progresses, both parties will check, check and confirm the data. At present, the construction materials are complete, and the completion materials have passed the inspection by the quality supervision department and have been handed over.
Eight, the completion acceptance conclusion
On February 28th, 20xx, 12, the project owner was organized for household acceptance, which was well received by the owner. After pre-acceptance by relevant personnel of supervision, construction, construction unit and property unit, it is preliminarily considered that the project construction basically meets the design and specification requirements. Please correct me with xxx and the leaders. Thank you. I wish this acceptance a complete success.
Party A's speech on completion acceptance 6 was developed by XX Company (led by xxx Bureau), supervised by XXX Company, constructed by XXX Company, surveyed by XXX Company and designed by XXX Company. The XXX project started on X, X, and was completed in XX days. Today, we sincerely invite all parties to participate in today's completion acceptance. Let me welcome you on behalf of the company (XXX Bureau). (Introduction) Then organize all parties to speak and put forward acceptance opinions in the order of construction, survey, design, supervision, Party A and quality supervision station.
(Party A speaks) In the early stage of the project construction, we have obtained the land use certificate and planning permit, and gone through the supervision and registration formalities at the quality supervision station. We signed a contract with the design, construction and supervision units, and all the construction parties fulfilled the contract well. Our owner appropriated the project payment according to the contract. In terms of technical data, the blue prints.the design before construction, approval and issuance of engineering changes and negotiation during construction; Quality management: The supervision unit worked hard to make the project pass the initial inspection in strict accordance with the engineering specifications, mandatory standards and related procedures. In the later acceptance stage, design, drawing review, energy conservation, survey and other units issue quality qualification documents. Meteorological lightning protection, atmospheric environmental inspection, environmental monitoring, public security fire control, planning, debt settlement office, etc. This project has been accepted. The construction party has made the project quality warranty commitment. With the joint efforts of the construction unit, supervision unit, on-site representative of Party A, design unit and other units, and with the strong support of leaders, this project has been completed. My owner thinks that this project has the conditions for completion acceptance and agrees to the completion acceptance.
Related reading: Speech by the construction unit on project completion acceptance.
First of all, I sincerely thank the leaders of the quality supervision station for taking time out of their busy schedules to participate in the completion acceptance. * * * * With the strong support, cooperation and concern of the leaders of relevant departments, the project has completed all the tasks agreed in the contract through the joint efforts of all the staff of the survey, design, supervision, construction, quality supervision and construction units and through intense construction. The construction unit shall submit the completion report, which shall be signed by the director; The supervision unit has organized and passed the pre-acceptance, and put forward the project quality evaluation report; Survey and design units put forward survey and design quality inspection reports respectively; Our company has paid the project payment according to the contract and signed the project quality warranty with the construction unit. All materials for approval of this project and related materials and procedures for project approval are complete. I will report the construction of this project to the leaders as follows:
I. Basic information of the project and management of construction procedures
1. The contract is entrusted to Jiangsu * * Architectural Design Co., Ltd. for investigation, designed by China Architectural Company, supervised by Xuzhou * * Co., Ltd. and constructed by * * * Construction and Installation Engineering Co., Ltd. Architect: * *.
2. The project has a building area of * * * square meters and a frame layer of * *, which was started in * * month of 20xx and completed in * * month of 20xx.
Second, the construction management organization
1. In order to ensure the smooth progress of the project, our company has defined the relevant provisions of project management based on the principles of quality first, safety first and frugality, including clean government, quality, safety, capital use and on-site construction management guarantee measures.
2, the construction unit to implement the project manager and main technical personnel responsibility system, all kinds of personnel responsibilities clear, sound rules and regulations, on-site management and orderly, good engineering order.
Three, the evaluation of engineering design, supervision and construction units
1, the design unit can seriously and responsibly participate in the foundation trench inspection; Participate in the quality acceptance of foundation and related important parts; Participate in the project completion acceptance; Notice of design modification and technical negotiation; Participate in the handling of related engineering quality problems; Engineering quality inspection report issued by the design unit; Complete other contents agreed in the contract and perform the duties of the design unit.
2, supervision unit project management personnel qualification, equipment and in place to meet the requirements; Supervision planning, supervision implementation rules in accordance with the provisions of the preparation, approval; Review materials, components and equipment before they are put into use or installed; Implement witness sampling system; On-site supervision of key parts and key processes.
Manage and ensure quality; Issue quality problem notice and review the rectification results of quality problems; Organize the quality acceptance of working procedures and parts, and participate in the quality acceptance of unit projects; Collect and sort out supervision data, review and supervise the construction unit's data for inspection; Issue the project quality evaluation report of the supervision unit; Complete other contents agreed in the contract and perform them well.
3. The qualification and equipment of the management personnel of the project management department of the construction unit are in place, and the qualification, equipment and equipment of the main professional posts meet the requirements; The construction organization design or construction scheme has been approved and implemented; The construction site shall have technical regulations for construction operation and relevant national codes and standards; According to engineering technical standards and construction drawing documents; Inspection and evaluation of working procedures, parts and unit engineering quality meet the requirements; Timely rectification of quality problems and quality accidents; Collect and sort out complete quality assurance information; Project quality self-evaluation report issued by the construction unit; Complete other contents agreed in the contract and better fulfill your responsibilities and obligations.
Fourth, the project cost management
The contract price of this project is * * * * ten thousand yuan, plus the increase or decrease of design changes. After the completion and acceptance, the warranty money will be deducted and settled by the construction unit and the construction unit. At present, the project settlement work is under review.
Verb (abbreviation of verb) quality management
1, this project is supervised by * * city construction engineering quality supervision station.
2. The main building materials, all kinds of components and equipment used in the project have certificates, and all kinds of tests are carried out according to the requirements of the specification, and the test report results are all qualified. Among them, concrete specimens and mortar specimens used for load-bearing structures are tested by witness sampling, and the number of tests meets the requirements.
3. There are no quality accidents and other accidents in this project. The construction quality of foundation, main body and roof conforms to the specifications and design requirements, and the roof and floor with waterproof requirements have no leakage.
Six, safe and civilized construction and time limit for a project management
1. Safe and civilized construction management of this project: this project is located in the city center, in order not to affect the office and life of surrounding units and avoid the occurrence of unsafe hidden dangers. The construction unit shall hang safety and civilized construction regulations and construction warning signs at the site, and designate a special person to be responsible for civilized construction management.
Seven. Engineering archives management
In the process of construction, the construction unit shall designate a special person to record, collect and sort out all the information in the process of construction according to the regulations on the management of construction engineering data, and the construction unit shall cooperate closely. As the project progresses, both parties will check, check and confirm the data. At present, the construction materials are complete, and the completion materials have passed the inspection by the quality supervision department and have been handed over.
Eight, the completion acceptance conclusion
This project has been accepted by the owner on * * month * * of 20xx. The owner's evaluation is good, and the relevant personnel of supervision, construction, construction unit and property unit have been pre-accepted. It is preliminarily believed that the project construction basically meets the design and specification requirements, so please * * * and the leaders to correct it. Thank you. I wish this acceptance a complete success.
* * * * * Limited
20xx * * month * * day
Party A's Acceptance Completion Speech 7 Dear Leader:
Thank you for coming to participate in the energy-saving pre-acceptance of the self-use office building project of Shangye Machinery Factory in Beibei District of Chongqing.
In May of 20xx, the project completed all construction procedures and started construction. During the construction, all parties have fulfilled the contract well.
Organize the blue prints.the design when the project starts, approve and issue the engineering changes and negotiations proposed by the construction unit during the construction period; Quality management: Quality management is based on the principle of "quality first". In terms of safety work, we should conscientiously study the laws, regulations and rules on safety production issued by government departments at all levels, and implement the responsibility system for safety production and safety supervision and management. In terms of construction funds, our unit raises funds through various channels to ensure that the project funds are in place.
We insist on strengthening the comprehensive supervision and management of construction units. Friendly neighborhood, harmonious public security. Here, on behalf of the construction unit, I would like to congratulate the construction unit on its safety and smoothness in the whole project construction, meeting the design requirements and completion acceptance specifications.
We would like to express our heartfelt thanks to the quality supervision, design, geological prospecting, supervision, construction and other units that gave us strong support during the construction process! Everyone has worked hard! !
Thank you!
;
- Previous article:Business hours of Songyuan Golden Diamond Department Store
- Next article:What about Xiamen Jindehui Trading Co., Ltd.?
- Related articles
- What is the greening rate of Xi An Jingwei International Center?
- How about the installation of Hengyuan Studio?
- Which is the most luxurious shopping mall in Tangshan?
- I bought my own parking space, but there has been no car idle. Is it reasonable for property management to let me pay the parking space management fee?
- Where is the address of Lanting on the left bank of Guangzhou Zhonghai?
- Why did the 39-year-old security guard who stabbed the owner of Mercedes-Benz in Guangzhou do this?
- Did Zou Ping seal it?
- I don't know anyone in Cuiping International City, and there is no real estate there, but the real estate there always calls me to explain how to protect rights.
- When the computer is used at home, it always crashes (online and offline), and it will be fine when it is taken to the computer repair shop. I don't know why. Ask the master for advice,
- Is Dalian Tahewan Villa Worth Buying?