Job Recruitment Website - Property management - What is the address of HFC (HSBC Building) in Urumqi?

What is the address of HFC (HSBC Building) in Urumqi?

HFC (HSBC Building) is located at No.331,Exhibition Middle Street, Midong District, Urumqi, Xinjiang. The property right is a 40-year-old standard office building developed by Xinjiang Junfa Real Estate Development Co., Ltd.

Property type: commercial office building

Property fee: 1 yuan/flat/month.

Decoration: a part of public hardcover.

Building type: high-rise building

Parking space: 1

Basic information: The project covers an area of 5 174 1 m2, with a building area of 93 133.88 m2, a plot ratio of 0 1.8, a green space rate of 35% and a green space area of about 50,000 m2. The total building height is 15 1.5m, * * 36 floors, 34 floors above ground, 2 floors underground, 1-5 floors are podium buildings, 6-34 floors are office buildings, and two floors underground are parking lots. The landscaping area is 50,000 square meters, and there are many landscape groups, covering landscape leisure corridors, sunken lawns, landscape walls, wooden plank roads, terraces and trails. At the same time, we use the vegetation with different heights to create a variety of semi-private outdoor spaces, combining exquisiteness with nature, and unifying ritual life, ecological green and leisure communication. In addition, the park is directly connected with Hongguang Mountain, forming a mountain landscape, preserving the existing trees in the mountain as much as possible, and making better use of the terrain to integrate with the mountain park. You can also let busy office workers enjoy the ecological office of "watching the park upstairs and visiting the park downstairs". Hardware configuration: The elevator adopts German brand ThyssenKrupp elevator, which is one of the three largest elevator manufacturers in the world. The new generation (TCM) elevator control system is controlled by CAN bus serial communication, which ensures more stable and safe elevator operation. At the same time, the elevator speed in the high zone reaches 3.5m/S, the elevator speed in the VI zone reaches 2.5m/S, and the elevator speed in the low zone reaches 2.5m/S, which is fast and efficient. There are 12 elevators in the main building, including 4 elevators in the high area, 6 elevators in the low area, 2 fire elevators and VI elevators 1 department. The DSC destination layer selector is installed at the entrance of the entrance security checkpoint. First, the elevator is allocated according to the customer's demand, which saves the owner's time, reasonably arranges the elevator operation and reduces the internal friction of the elevator. The DSC floor selector automatically transfers the convenient elevator to the lobby for waiting, and the average waiting time is less than 30 seconds, which greatly reduces the waiting time. Second, foreign visitors can be restricted to registered floors to ensure the safety of other owners. The glass curtain wall is designed with clear frame, and the lines are neat and clear; In order to save energy, the skeleton of the glass curtain wall adopts 180 series high-quality broken bridge insulation aluminum profiles, and the glass adopts CSG original 6(low-e) double silver+12A+6mm hollow double tempered glass, and argon gas is filled inside, which further improves the heat insulation effect of the curtain wall. The project is a pure steel structure building with good seismic effect and high safety. From the design point of view, the clear height of floors should be increased as much as possible to increase the income of investors. In addition, it is very important that it can effectively reduce dust during construction and is an environmentally friendly building. HFC adopts the steel structure produced by Admiralty (Xi 'an) Heavy Steel Structure Co., Ltd. Admiralty (Xi 'an) Steel Structure is a domestic steel structure manufacturer, strictly controls the quality of steel structure, and ensures the independent temperature control of central air conditioning system and fresh air system. It adopts York, one of the three international brands, with independent temperature control, fresh air system and constant temperature design, which is extremely comfortable and the four seasons are as warm as new. In addition, the project has its own heating boiler. In the season of seasonal change, heating can be provided in advance, and heating and cooling can be switched freely, which is not limited by municipal heating time. At the same time, the project is equipped with international-level intelligent systems such as OA (Office Intelligence), BA (Building Automation), CA (Communication Transmission Intelligence), FA (Fire Protection Intelligence) and SA (Security Intelligence) to realize intelligent modern office. Project supporting: Commercial supporting is also a major feature of the project. 1-5 is a podium building, with a total area of about 25,000 square meters, a single floor area of 4,000-5,000 square meters and a height of 5 -6.5 meters (height of the main building: 1 6.5 meters, 5 meters on the second floor and 5.2 meters on the third and fourth floors). Skirt building: 1-4 floor is the same height as the main building, and 5 floors are 6 meters), with 5 elevators separately. The podium will create a boutique characteristic hotel, banquet hall and catering. Now it has entered the stage of decoration design. In addition, the park will also build a14,000-square-meter commercial street with independent characteristics, which will not only meet the business banquets of the owners, but also solve the problem of employees' meals at ordinary times. There are 446 underground parking lots and 202 above-ground parking lots. There is an independent underground parking lot in the commercial street, and the overall parking space of the project is sufficient.

Click to view: HFC (HSBC Building) details.