Job Recruitment Website - Property management - Shanghai Typhoon Shelter Street Guest Headquarters Address

Shanghai Typhoon Shelter Street Guest Headquarters Address

Introduction to joining

Tel: 02 1-67627826

Fax: 02 1-67627825

Jieke drinks shop

-Introduction to joining

★ Company profile

1998 Shanghai typhoon shelter teahouse opened its first typhoon shelter teahouse at No.99 Jiangning Road. Created a business model of "unlimited joy, unlimited drinking", and established a beverage delivery department in the same year. The service fully embodies the marketing positioning mode of "we provide you with the best products" and "insist on drinking fresh". Over the past six years, typhoon shelter teahouse has become a well-known brand of teahouse. At the same time, the performance of the take-away department of typhoon shelter also developed rapidly in the same period, and stood out from the fierce competition in the take-away market, and its performance improved steadily. Bubble tea, a typhoon shelter, has become a representative of fashionable and trendy drinks. At the beginning of 2003, Street Guest Catering Management Co., Ltd. under Typhoon Shelter Teahouse was established. With the unique overall design concept, strict management, marketing model and strong technical support, we started the construction of model stores and the transformation of the original take-away stores. After continuous discussion, repeated brewing and gradual improvement, it is now officially launched to the society-Street Guest Beverage Joining Project.

1. Current store development

Opening hours of regional store names and addresses

1. No.52 Changde Road, Jieke Changde Store, Jing 'an District1April 25, 2004

2. Shop 2004 at Wujiang Road 1 13, Shimen 1st Street, Jing 'an District-117

3. Jack Haiphong Store No.719 Jiangning Road, Jing 'an District 2005- 1-2 1

4. No.644 Yuyuan Road, Ningdian, Jack Town, Jing 'an District

5.No. Wujiang Road 168, Jack Wujiang Store, Jing 'an District 2005-3- 12

6. Xiangyang South Road 12 1 No.2004-8-12, Jack Xiangnan Store, Xuhui District

7. Jack Hu Aixiang Store at No.9965438 Huaihai Middle Road +0, Xuhui District C-1712004-12-18.

8.No. Nandan East Road 143, Jack Nandan Store, Xuhui District 2004- 12- 14

9. No.338 Damuqiao Road, Jack Damuqiao Store, Xuhui District 2004- 12- 18

10. No.2, Lane Pingjiang Road 145, Jack Fenglindian, Xuhui District

11.No.417 Huaihai Middle Road, Jack Dai Xiang Branch, Luwan District, April 29, 2004

12. A 2004- 159, Ruijin 1st Road, Jack Ruijin Store, Luwan District.

13. No.229, Ruijin 2nd Road, Dapudian Street, Luwan District 2005- 1-26

14.8.2004 Jieke New Store, No.576 Zhonghua New Road, Zhabei District

15. Jack Meiyuan Store, Huanlong Shopping Mall, No.360 Meiyuan Road, Zhabei District 2004- 1 1-28

16. Jack Lin Xin Store, No.964 Linfen Road, Zhabei District -2

17. No.902 Wenxi Road, Jiekewen Xidian, Zhabei District

18. No.664 Hutai Road, Jieke Huhuadian, Zhabei District 2005-3- 19

19.8.2004 Jack Sichuan South Road 17, Huangpu District

20.No. Yunnan South Road 15, Jack Laoshan Store, Huangpu District, August 7, 2004

2 1. No.433 Vu Thang Road, Jack Vu Thang Branch, Huangpu District, September 29, 2004

22. No.520, Tianjin Road, Jieke Tianjin Branch, Huangpu District 2004- 10- 12

23. No.246 Guangxi North Road, Jack Fuzhou Branch, Huangpu District 2004- 10- 19

24.No. Zhonghua Road 134 1, Jack Confucian Temple Store, Huangpu District, September 30, 2004.

25. No.9 Sanpailou Road, Jack Zhoujindian, Huangpu District 2004- 12-3 1

26. Jack Jinling Store, No.92 Fujian South Road, Huangpu District 2005- 1-22

27. Jack World Store, No.7 Tibet South Road, Huangpu District 2005- 1-22

28. 2005-2- 1

29. Jack Beihai Store, No.247 Beihai Road, Huangpu District 2005- 106+0-20

30. Street Guest 2004- 12-8, No.340 East Road, Shangwaidian Sports Club, Hongkou District

3 1. A 4, No.65438 Tianbao Road, Jack Tianbao Store, Hongkou District 2004-1-17

32. Jack Duolun Store, No.2089, Sichuan North Road, Hongkou District 2004- 12-25

33. Jack Garden Store, No.8 Garden Road, Hongkou District 2004- 12- 18

34. Street Guest Guangling Store, No.1 Guangling Road, Hongkou District 127, 2004- 12-7

35. Huoshandian 2004-109, Huoshan Road, Hongkou District-0/2-25

36. Jack Miyun Store, No.508 Miyun Road, Hongkou District 2004- 12-3 1

37. 2005-2- 1

38. Jack Quyang Store, No.800 Quyang Road, Hongkou District ED 2005-2- 1

39. Jack Helen Store, Sichuan North Road 1800, Hongkou District 2005-3- 12

40. Jack Jinxiu Store, No.3218 Jinxiu Road, Pudong New Area, July 25, 2004

4 1.No. Yongtai Road, Sanlindian Street, Pudong New Area11September 7, 2004

42. No.59 Jiekepu Circuit, Pudong New Area 2004-9- 18

43. No.3 Nanquan Road, Pudong New Area 1287 Jack Nanquan Store 2004-1-16

44. No.643 Laoshan East Road, Jack Xiaodian, Pudong New Area 2004- 12-3 1

45. Jack Minsheng Store, No.241Minsheng Road, Pudong New Area, 2005-2-2.

46. No.268 Qihe Road, Jack Shangnandian, Pudong New Area 2005- 1-20

On February 24th, 2005, No.8, Lane 595, Pudong South Road, Punandian Street, Pudong New Area.

48. No.359 Changli Road, Changqing Sub-branch, Pudong New Area, Jieke 2005-3- 16

49. Jieke Zaoyang Store 2004-11-13, Zaoyang Road, Putuo District

50. Jack Jinzao Store, No.414 Zaoyang Road, Putuo District, 2004- 12-4.

5 1. No.84, Gao Lan Road, Jack Gao Lan Sub-branch, Putuo District 2004-8- 17

52. Jieke China Normal University Store, No.3667 Zhongshan North Road, Putuo District 2004- 12-2

53. No.20 Wuning Road, Jack Ningfudian, Putuo District 2004-11-12

54. Jack Kaixuan Store, No.753 Kaixuan North Road, Putuo District 2004- 12- 13

55. Jieke Communications Store, No.4672 Communications Road, Putuo District 2005- 1- 13

56. Jack Tongchuan Store, No.85 Tongchuan Road, Putuo District 2004- 12-3 1

57.No. Lanxi Road 198, Jack Lanxi Branch, Putuo District 2004- 1- 1

58. Room 205, Huayin Road, Jack Huayin Store, Putuo District 103

59. The second floor of changshou road 155, Jack Century Lianhua Changshou Store, Putuo District.

60. No.4 Yingkou Road, Jack Yingkou Branch, Yangpu District 2004- 1 1-23

6 1. Jack Caida Store, No.602 Guoding Road, Yangpu District 2004- 10- 14

62. Room A, Fudan Quanguo Store, No.555 Quanguo Road, Yangpu District 2004- 12-3

63. No.533 Minxing Road, Jack Lake Dadian, Yangpu District 2004- 12-27

64. No.487 Guoding Road, Jack Guo Ding Store, Yangpu District 2005- 1-8

65. Jack Chifeng Store, No.53 Chifeng Road, Yangpu District 2005- 1- 16

66. Jack Liaoyuan Store, Xuchang Road 1477, Yangpu District 2005-3- 13

67. Room 4, Nanxi, Jack Jiangjiang Road 1736, Yangpu District, February 3, 2005

68. No.2736 Longming Road, Jack Jing 'an Xincheng Sub-branch, Minhang District 2004- 12- 18

69. Street Guest Huaqing Store (No.255 Meilong Road, Minhang District) 2005- 1- 18

70. Floor 2, Century Lianhua Xinzhuang Store, Songxin Road 195, Minhang District

7 1. No.33 Zunyi Road/kloc-0, Changning District, Jieke Zunyi Store 2005-2- 1

72. No.49, Lane 78, Jiangsu Road, Jack Wuding Store, Changning District

73. No.715 Wuyi Road, Jack Wuyi Store, Changning District

74. Jack Zhongshan Park Shop A47, Milan Fashion Plaza, No.820 Changning Road, Changning District 2004- 12-22

75. No.309 Renmin South Road, nanqiao town, Nanfeng Street, Nanfeng District

2. Site selection requirements

Geographical location requirements

The venue is located in the municipal business district, regional business district, business circle and university circle.

Storage area requirements

The usable area shall not be less than15m2, the width of the main entrance facade shall not be less than 2.2m, the width of the rear facade and side facade of the main entrance facade shall not be less than1.6m, and the ceiling height shall not be less than 2.4m.. Special room type and non-standard facade size can only be joined after approval by the company.

Facility attachment requirements

The power requirement is 12 kW for more than 40A (380W power).

Equipment electricity consumption list:

Product name, specification and capacity (KW)

Ice maker KD-700 1. 1

Ice planer SYI- 168 0. 18

Juicer (double cylinder) FD- 102 0.35

Juicer (four cylinders) FD-084 0.42

Popcorn machine CPM-6 1.5

Manual sealing machine et-D6 0. 18

Induction cooker 1.6

Electric water heater 3

Electric black tea bucket 3

Water purifier+sterilizer type 2004 0.04

Haier freezer 9 10*555*895 0. 18

Haier freezer 1055*555*895 0.24

Air conditioning 1.2

Refrigerated serving tray for street passengers1500 * 700 * 800/100 0.28

Refrigerated serving tray dining table for street passengers1800 * 700 * 800/100 0.34

Street guest freezer 1500*700*800 0.28

Street guest freezer 1800*700*800 0.34

Price list light box 0.5

Indoor lighting cloth 1

Total 15.5

Water supply requires 6 or more water inlet pipes.

Drainage requires independent drainage.

Have an independent advertising space

3. Before investing

Project amount

The initial cost is RMB 33,000.

The equipment cost is 45,000 yuan (according to the actual settlement).

The deposit is RMB 220,000.00 Yuan (returned after the termination of the three-year contract).

The decoration fee is 25,000 yuan (settled according to the actual decoration fee of the site area).

The initial investment estimate is 65,438 yuan+200,000 yuan.

Remarks: The above fees do not include rent, water and electricity expansion fees, etc.

4. Franchisees:

4. 1 personal data

4.2 Introduce the location, area, rent and ancillary facilities of the proposed store.

4.3 Intentional investment scale

4.4 Questioning the introduction of franchisors

1, consulting

1. The Franchisor shall conduct on-site inspection on the premises provided by the Franchisee.

2. Preliminary measurement of the basic dimensions of the house

3. Assist franchisees to make suggestions on house leasing.

4. Provide investment advice

5. Plan for providing investment return: It is estimated that the investment will be recovered in 1 year-1.5 years.

6. Determine the intention to join

2, sign a franchise contract 3,

1. Specify the progress and time of accession.

work schedule

negotiate

Determine the store (field trip within two working days after receiving the address,? Give the answer the next day )

Sign a franchise contract? Sign and confirm the decoration details and decoration material price list. If franchisees decorate themselves, they need to submit their own decoration application, which will be approved by the company.

Determine the start-up time (is the initial capital signed into a franchise contract? Transfer to the company account within three days. The project can be officially launched)

Designer's design plan (plan and elevation should be provided within three working days after the project starts)

Construction team comes into the site (arranged by the engineering department, with complete design scheme). If a store exceeds the standard? Due to the influence of quasi-area, special room type or external factors, the construction period can be adjusted appropriately)

The decoration is finished (the engineering department has passed the acceptance test,? Before entering the equipment? And materials)

Equipment? Enter the site (the distribution center can only distribute the equipment after receiving the concealed engineering qualification certificate from the engineering department? Arrive at the scene)

Equipment? Commissioning test/debugging

Material delivery (the distribution center will arrive within two working days after receiving the decoration certificate from the engineering department)

Trial operation (store appearance repair)

2. Sign the franchise contract

3. Pay upfront expenses (initial fee, deposit, equipment fee, decoration fee).

4, opening preparation 5,

1. Guidelines for handling business license procedures

The franchisor shall provide relevant materials and go through licensing procedures. If the Franchisor is required to handle it on its behalf, the Franchisee is authorized to entrust the personnel designated by the Franchisor to handle it, and the agency fee is 3,000 yuan, and the license issuing fee shall be borne by the Franchisor.

Step 2 recruit employees

2. 1. The standard store has 4-6 employees (according to the actual store demand).

2.2 Employee Salary Reference Table

Post salary meal sticker

Head waiter 1050 yuan/month

Employee A (including food, accommodation) 900 yuan/month 100 yuan/month.

Employee b (including food and accommodation) 750 yuan/month 100 yuan/month.

Internship in 20 yuan.

2.3 Employee Schedule Reference Table

Shop:

A 9:00—— 19:00

B 10:00——20:00

c 1 1:00——2 1:00

D 12:00——22:00

One two three four five six

Ah, ah, ah, ah, Hugh.

stop

Hugh C C D C C B

Hugh, Hugh, Hugh, Hugh.

Large shop

A, B 8: 00-2 1: 00, have a rest.

C 8: 00- 18: 00, have a rest.

D11:00 —— 21:00 do six breaks and one rest.

One two three four five six

A xiu a xiu a xiu a xiu a xiu

Hugh b Hugh b Hugh b Hugh b Hugh b Hugh

Hugh, Hugh, Hugh, Hugh, Hugh.

Hugh, Hugh, Hugh, Hugh, Hugh.

2.4 Staff positions, trained in store management.

Employees are recruited by franchisees themselves, and the employee data sheet is filled in and handed over to the person in charge of Street Guest Project Team. The training period is 10 day.

If the Franchisor is required to send designated personnel to work in the franchise store, it is required to pay the Franchisor a one-time fee of 65,438 yuan+0,000 yuan/person to support the franchisee to start business, unless the Franchisor agrees to the accident.

2.5 If the franchisee needs to decorate itself, it shall submit an application for self-decoration, and the franchisee shall provide the plan and elevation, and the franchisee shall pay the project management fee to the franchisee. After the decoration is completed, it will be accepted by the engineering department. After the acceptance, the equipment and materials can enter the site and start business.

Step 3 buy raw materials

3. 1 every week, franchisees fax to the distribution center to order materials for next week according to the company's standard purchase requisition, and the distribution center will uniformly distribute them to all stores the next day. The delivery cycle is once a week, and the date and time when the materials arrive at the store are determined by the routing table of the distribution center.

4. Provide opening promotion design scheme.

5. The preliminary design fee includes plan and elevation. If the franchisee needs an effect plan, the franchisee will charge a certain fee.

Step 6 start business

1. Provide advertising supplies

2. Peer supervision and guidance

3. Manage and implement promotion measures.

4. Standardize management and services.

7. Management and Service 8. Service

1. The franchisor shall assign personnel to pay a return visit to the store every week, provide management and promotion guidance, and check product quality, service quality, accounting books statistics and inventory.

2. The Franchisor provides equipment maintenance consulting services on a regular basis.

3. The franchisor shall provide training on new product production.

4. The franchisee shall feed back the business information on 25th of each month and provide the monthly turnover statistics to the company.

5. The franchisee shall pay the management fee to the company at the rate of 3% of the monthly operating income.

6. The franchisor shall make settlement on 25th of each month. The franchisee shall check the amount of materials with the company's finance before the end of each month and pay the materials fee to the franchisor. If the goods are not distributed within the time limit, the center will stop distributing materials until the account is paid. (6769 1855*8009 Guo Lan)

7. Daily business report should be faxed to the company every day (67627825).

8. Fax the monthly material inventory table and financial statements to the company.

Street guest decoration by-laws

1. Requirements for room type:

A./kloc-more than 0/5 square meters. B it's 2.4 meters above sea level. C facade width not less than 2.2 meters d special room type approval.

2. Power supply, water supply and drainage requirements;

A is not less than 12kW, 40A Table B has a water outlet with a water diameter of 20mm C..

3. The location requirements of the facade billboard;

In order to establish the overall image of street customers' drinking water station, street customers should have independent advertising space, and the specific spatial position of advertising space should be signed by franchisees and companies before design, so as to avoid looking around repeatedly and wasting time in design and construction.

4. Drawing design:

Company A is responsible for the drawing design of the store, and the plan, elevation and elevation renderings will be completed in three working days.

B Special rooms and oversized and complicated rooms need to be appropriately expanded.

5. The engineering department shall go to the site (not less than four times) from the date of receiving the project book.

(65438+

(2) Construction handover drawings and materials shall be qualitative at one time.

(3) the middle time.

(4) The last project acceptance.

For example, the site supervisor in the suburbs will go to the site (not less than three times).

6. Construction Zhandao and surrounding coordination

Before construction, the investor shall go through the relevant environmental protection procedures, and if necessary, handle the road occupation permit and coordinate with the owner. Investors should be responsible for expenses and related losses, such as delays in construction period.

7. Construction period and cost

A after the construction drawing is completed, it needs to be confirmed and signed by the constructor and the franchisor. If there is no special reason, the decoration period of the model room within 15 square meters shall not exceed ten days. If it is overdue, the company will impose a fine of 600 yuan/day on the constructor. For the decoration period with extra large area, it can be extended appropriately, and the construction can be started only after it is approved and signed by the three parties.

B. supplementary rules for construction fees.

C street customers who want to decorate themselves must submit an application form, and construction can only be started after it is approved by the engineering department and company leaders. The company collects project management fees.

Verification of project management fee: 65,438 yuan +0 will be charged if the construction area is less than 20 square meters, 250 yuan.

If the construction area is 2 1~40 square meters, 2000 yuan will be charged.

The construction area is 41~ 80m2, and the charge is 3,000 yuan.

The engineering department will add another subsidy of 100 yuan/time to suburban projects.

8. Construction acceptance:

The street lamp decoration should be carried out according to the relevant national standards and the characteristics of our company. The use of decorative materials shall conform to the brand specifications and color numbers specified by the company (attached with the list of specified materials). If the above requirements are not met, the company director can order it to make rectification, and will punish it or even cancel the decoration qualification.

9. Material allocation:

In order to cooperate with the decoration, the center distributes the designated distribution materials, and the construction party must place an order one day in advance. After the arrival of the goods, the construction party must cooperate with the receipt and order, and the franchisee will sign for it after confirmation. In the overall renovation process, the center will distribute the materials to your store in three times, as follows: once for building materials, once for equipment, and once for materials. For example, the secondary distribution is carried out on the construction site in the suburbs. The specific operations are: A building materials once, and B equipment materials once. The final delivery (that is, materials) must be carried out after acceptance by the engineering department.

10. Warranty liability

For the decoration project designated by the company, the company designates the constructor to undertake the one-year warranty responsibility. The warranty period of the following items is three months: a all light sources and b faucets. For the man-made damage and maintenance caused by the use of the Chinese and African construction parties, the corresponding fees will be charged in the maintenance, and the maintenance overdue for one year can be insured for maintenance with the company's maintenance department.

JK_ decoration rules

1. Operating area of interior decoration lobby and bar 1250 yuan /m2, actually calculated non-operating area. (Non-operating areas refer to warehouses, etc. )

2. Bar decoration 1 100 Yuan/m

3. Facade decoration 280 yuan /m2 (facade toughened door 380 yuan/m2)

4. Sign light box 380 yuan /m2 (excluding freight)

5. Price light box 280 yuan/only

6. Labor cost for decoration 15㎡ is less than 5,000 yuan/room, and 250 yuan is added for every square meter beyond this area.

7. Exterior product light box modeling 800 yuan /m2

8. Typhoon shelter advertising words 1500 yuan/meter

9. Management fee of urban management department 600 yuan