Job Recruitment Website - Property management - Property safety officer confirmation work summary 300 words

Property safety officer confirmation work summary 300 words

Trial summary model for new security employees

Time flies, it's been two months since I came to the company. Looking back at my hard work and sweat, I feel deeply. The achievement is inseparable from the wise choice and correct guidance of the company leaders, and from the sincere unity and full cooperation of comrades. Sum up experience for better work in the future, absorb the best and accept the best, so that we can further adapt to the development of the new situation.

First, be careful and work in place.

The work of security department plays a very important role in the development of a company. Since I took over this job, I first warned myself that responsibility comes first, and only care can do the job well. After familiarizing myself with all kinds of computer rooms and checking all the fire fighting and security equipment and facilities, I carefully recorded the problems existing in each link, site, construction site and warehouse, and found out the loopholes and deficiencies according to the construction drawings and reality. Arrange one by one, adhere to daily inspections, inspections and records, and make some work plans and work arrangements through several days of field work.

First, take over and accept the fire and safety system. This job requires both professional knowledge and certain skills. I study the relevant knowledge seriously. According to some work experience, I pay special attention to key parts and error-prone parts. The specific rules are as follows.

1. The fire control center and fire pump room shall be clean and tidy, and there shall be no sundries piled up. The appearance of the automatic alarm system is neat, the function keys of the operation control panel are sensitive and effective, and the system has no ups and downs. The pressure lines of each connection interface are firm and firm, and the fire pumps are clearly marked.

2, fire pool, fire water tank has been reserved, meet the requirements of fire protection design, the system power supply is normal, the wet spray fire extinguishing system pipe network is full of water, the system valve is not leaking, and it is in normal working condition.

3. Check the control function test and linkage function test of the automatic fire alarm system, start the manual fire alarm button, and the alarm place should have an indicator light to confirm the alarm signal and output the fire alarm signal. After the fire alarm controller receives the alarm signal, it gives an alarm by sound or light. When the main engine is in the automatic state, all fire fighting equipment will be linked.

Second, in the acceptance of security and fire-fighting equipment and facilities, check the problems found with the manufacturers one by one to urge rectification. These questions are as follows:

1. More than 50 fire doors were replaced with 10 broken glass doors; Maintain, adjust and repair the blunt plug of the lock core of the fire door switch lock that can not be opened normally.

2. When checking the No.6 rolling gate, the rolling gate cannot be opened normally. If the signal receiver is found to be out of order, supervise the on-site maintenance of factory personnel.

3. Because the pipes of the security infrared system are exposed pipes, in order to prevent potential safety hazards, I am responsible for supervising and inspecting the security manufacturers to change all the exposed pipes of the infrared system into concealed pipes according to the instructions of the leaders.

Third, according to the situation on the spot, make the recruitment of security personnel, set posts and personnel, make job responsibilities of each position, and solve and improve the accommodation problem of foreign security personnel. The staffing establishment is as follows:

1, safety supervisor 1

2. Internal security personnel: 4 supervisors and 4 supervisors.

3. External security personnel: 1 Monitoring, 4 at the gate post, 2 at the periphery and 4 at the central post.

Fourthly, for the shortage of security system, according to the site situation, it is suggested that the company install cameras inside and outside the reservoir area, which greatly improves the monitoring and anti-theft inside and outside the reservoir area and is very conducive to real-time monitoring of suspicious trends.

Fifth, the 49 fire doors and 14 glass doors in the reservoir area are numbered uniformly, and temporary numbers are pasted. The water bags and gun heads in 72 fire hydrants in the reservoir area were counted, and after verification, the fire hydrant seals were affixed, and the no-smoking icons were affixed in obvious positions throughout the reservoir area to warn all personnel that smoking was prohibited in important areas of the reservoir area.

Sixth, after receiving the existing 155 keys in the reservoir area and checking them one by one at the scene, paste the position identification on each key, and then temporarily seal it in the filing cabinet to ensure the normal use in the future work, and formulate key management regulations.

Seventh, check the experiments of making epoxy floor paint samples by three manufacturers, protect the production area from man-made damage during the production process, take photos on the spot and record the daily production process, and compare the samples made by three manufacturers.

Eighth, the installation and debugging of equipment.

1, cooperate with security vendors to install mode access control system.

2. Supervise and inspect the installation of gate and three-roller gate.

3. Cooperate with elevator manufacturers to install five-way intercom, and personally go to the installation site to test whether the call quality is clear one by one.

Second, make further progress.

After sorting out the security work comprehensively and systematically, I began to supervise and inspect the personnel management.

First, arrange the contents and requirements of the cleaning staff's daily work, with the responsibility to the people, and check the quality of work at any time.

Second, I carefully check whether all the equipment and facilities in the reservoir area are in good condition every day, record the problems and report to the superior leaders in time.

Third, supervise and inspect waterproof manufacturers to make roofing waterproof again. After the completion, do the roof waterproof test and start the fire hydrant pump to supply water. After 24 hours, test the waterproof quality of the roof. I recorded the whole production and inspection process one by one and took photos on the spot.

Fourth, make security personnel file cards, register the existing security personnel, and understand the specific situation of security personnel, so that the company can better manage security personnel.

Fifth, check the existing security guards irregularly every day, correct mistakes in time, and work out the workflow of past posts.

The above work is part of my daily management in the past two months, and there are many urgent tasks arranged by the leaders at any time, which I have worked hard to complete. Cooperate with the company to recruit security personnel, accompany the company leaders to inspect the site of the reservoir area and answer the questions raised by the leaders one by one. I am well aware that there is still a certain gap between the needs of work and the expectations of leaders, but I believe that with the care and help of leaders, I will certainly accomplish all the tasks better, and at the same time cooperate with various departments to contribute all my strength to the development of the company.