How to place an order without the supervision of the passenger and freight elevator driver?

1, if the witness is inconsistent, a supervision notice can be issued to require the tower crane operator to hold relevant certificates.

2. If you don't reply or make rectification, you can issue a notice of shutdown according to the major production safety hazards (the notice of shutdown is usually issued by the director). Of course, you have to inform the construction unit of this notice.

3. The shutdown notice shall be reported to the relevant regulatory authorities and the Safety Production Supervision Bureau.

4. If the construction unit forcibly operates, in order to protect the interests of the supervisor, the supervisor may notify the construction unit to stop the supervision of this project and propose to withdraw from the site.