Job Recruitment Website - Property management - When did Changchun cancel the closed-loop management of construction sites?
When did Changchun cancel the closed-loop management of construction sites?
At present, the epidemic prevention and control situation in our city is grim. In order to further improve the prevention and control of epidemic situation in construction sites and strengthen closed-loop management, this scheme is formulated according to the requirements of national epidemic prevention guidelines and the work deployment of the Municipal Construction Committee, combined with the actual work and the results of preliminary work.
Further clarify the closed-loop management requirements of epidemic prevention and control in construction sites, consolidate the responsibility of epidemic prevention and control in construction sites, strengthen the access control of construction site personnel through strict closed-loop management, and implement various prevention and control measures to effectively reduce the risk of epidemic spread in construction sites.
Closed management, prohibit personnel from entering and leaving at will. All construction sites should be shut down and closed management should be implemented. Post should be set up separately, and a special person should be on duty 24 hours a day. Existing personnel should be controlled according to the roster. On-site insiders are not allowed to enter or leave at will. If it is really necessary to go in and out, it shall report the situation to the regulatory authorities, check the auspicious code, boarding code, temperature measurement and register the identity information. All projects are prohibited from starting or resuming work, and the time for starting or resuming work will be notified separately.
Minimum unit separation, the implementation of minimum unit separation living, each room 1-2 people living, not allowed to walk around and gather at will. N95 masks should be worn in public living areas.
Unified catering, provide all necessary living and material security for the site interior, and the personnel's diet shall be uniformly distributed by the general construction contractor.
Disinfect public areas and strengthen the cleaning and disinfection of key parts such as offices, canteens, dormitories, elevators and bathrooms, such as access control buttons, elevator buttons, door handles and faucets. , and disinfected twice every 2 hours. Go to the toilet at the same time, wash and bathe in batches at different times, and disinfect each batch at intervals.
Establish health account, and establish on-site health account, including personnel's name, ID number, home address, contact information, vaccination, nucleic acid detection, trip (action track) within 14 days, transportation, health status, temperature measurement results, etc.
To set up an isolation zone, it is necessary to set up an isolation zone in a relatively independent and well-ventilated area, equipped with basic facilities for the normal life of isolated personnel, and arrange special personnel to be on duty 24 hours a day. Independent toilets should be set indoors, equipped with shower facilities, and the wastes generated in the isolation area should be placed in a unified way. After comprehensive disinfection, it should be cleaned up and transported centrally. Disinfectors and food delivery personnel in the isolation area must wear protective equipment in an all-round way.
To formulate an emergency plan, it is necessary to establish and improve the epidemic emergency mechanism, connect with local communities and epidemic prevention and control departments, improve the disposal plan, clarify the disposal process, and ensure that the responsibility is implemented to people.
If there are suspicious symptoms such as fever, cough, dyspnea and close communication, you should report to the local epidemic prevention and control department and supervision department at the first time, start the emergency plan at the first time, and seek medical treatment in time.
Pay close attention to the ideological trends, pay close attention to the ideological status and emotional trends of field personnel, do a good job of persuasion and appeasement accurately, solve the difficulties and problems encountered in time, and avoid extreme events.
- Previous article:What about the facilities around Xi 'an Lijing Haoting Community?
- Next article:Di Feng Real Estate has several properties in Chenghai.
- Related articles
- Where is Vanke Property Services?
- Korla-Ruoqiang-Lhasa Cycling Route
- Where is the Sena Haoting in Qiqihar?
- How about Hebei Deguang Real Estate Development Co., Ltd.?
- Which bar in Zunyi recruits male singers? What are the requirements? Why did I ask all the bars on Macau Road, but I couldn't find a recruit?
- How much does it cost to open a new energy vehicle 4s shop?
- Who is the developer of Jinan Sanjian Academy?
- How to get from Jingtai Square to Wangcheng Hongtian Kangyi?
- How about the decoration of Zhengzhou Yaxing Shi Shengyun Water House?
- What is the telephone number of Anyang Evergrande Emerald Hua Ting Marketing Center?