(1) Pre-design of sequence flow chart of home decoration

Similarly, the difference between people and bees is that the structure of bees is an instinctive reflection. Before structure, people first form ideas and frameworks in their minds. Therefore, if home improvement is compared to a battle, then the flow chart of home improvement design in the early stage is the "battle plan" of this battle and the "soul bond" of home improvement. In the preliminary design of the flow chart of home decoration design, another thing that must be done is to measure the room in detail, which mainly includes:

1。 The flow chart of home improvement design defines the fields involved in the decoration process. Especially in the fields of ceramic tiles, wall coatings, wallpaper and floors.

2。 The sequence flow chart of home improvement defines the size of the main wall. Especially in the future, it is necessary to design the wall size of furniture. In addition, be careful not to forget to go to the property to go through the opening formalities and pay the decoration deposit.

(2) The sequence flow chart of the demolition and reconstruction of the main body of home improvement.

The flow chart of home improvement design has entered the construction stage, and the main body demolition and transformation is the first project. The sequence flow chart of home improvement mainly includes wall demolition, wall construction, wall erection, heat dissipation, plastic steel windows and so on. Simply put, the main body is to build the framework of the construction site first.

(3) Hydropower transformation

Before the reconstruction of hydropower lines, the main structure was basically completed. In the sequence flow chart of family decoration, the first measurement of cabinets should be carried out between the reconstruction of hydropower station and the demolition of the main body. The so-called first trial cabinet actually has no actual content, because the wall and floor have not been treated, so the cabinet designer can't give the specific design size, but only put forward some relevant suggestions on the location of the water outlet reserved by the developer and the socket of the range hood. Zhuang Jie sequence flow chart mainly includes:

1。 Check whether the position of lampblack machine socket will affect the installation of lampblack machine in the future.

2。 See if the water meter is in the right position.

3。 Check whether the position of the upper nozzle is convenient for installing the sink in the future. For the first measurement of cabinets, I can do it myself with a little experience. After the waterway reconstruction is completed, it is best to waterproof the toilet immediately. The kitchen generally doesn't need to be waterproof.

Unless the sequence flow chart of home improvement is the main material needed for main demolition, the entry time of main materials such as tiles and large core boards should be carried out after hydropower transformation. Because if the circuit transformation involves cutting grooves on the ground, the positions of tiles and large core plates are not suitable, and it is very troublesome for workers to walk around.

(4) Woodworking

Woodworking, bricklayer and oiler are the "three brothers" in the construction process. The basic sequence of appearance is: banded oil. The basic principle of appearance is who gets dirty first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement. In fact, in the process of demolition and transformation of the main body, carpentry work can also be considered, such as winding riser, decoration ceiling and gypsum line in the sequence flow chart of home improvement as detailed links. There is no conflict with the waterway reconstruction itself, and sometimes some cooperation is needed. If the family wants a fake wall, they should consider whether there are water and electricity lines on the fake wall. If so, the hydropower transformation personnel should be allowed to bury the pipe in advance.

(5) Tiles

If the workers are busy, the foreman will usually let the "bricklayer" in and stick the bricks before the "carpenter boss" ends. This is normal, because the two do not conflict. In the operation process of "two-year bricklayer", the installation also involves three links:

1。 The sequence flow chart of home improvement is to install doorstones and marble windowsills. The installation of the doorsill can be completed together with the floor tile, or after the floor tile is paved, the installation of the marble windowsill is generally completed behind the window cover, and the marble installation union prepares glass glue to seal the marble and the window cover with glass glue.

2。 Floor drain installation. Floor drain is the first floor drain in furniture hardware, because it should be installed with floor tiles. So when we start shopping for building materials, we should buy a floor drain as soon as possible.

3。 Installation of range hood. The range hood is the first household appliance. After the kitchen wall brick is paved, consider installing a range hood. The second bricklayer "left the scene, and the cabinet can be measured for the second time." Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, the cabinets can be re-measured.

(6) Wall coating

"Old Oil" comes into play, which mainly completes the basic treatment, painting and furniture painting of the wall. As the "woodworking boss". Students who are ready to paste wallpaper only need to let the "Third Stone Oil Worker" basically handle the planned wallpaper wall. As for whether to leave the last coat, I don't think it is necessary to be too real. Judging from the sequence flow chart of home improvement, it is of little significance to leave the last coat, because the operation behind is not dirtier than painting.