Job Recruitment Website - Property management - Don't regret not reading the most detailed house decoration strategy in history.
Don't regret not reading the most detailed house decoration strategy in history.
Housing decoration strategy-decoration process
1. Pre-design -2. Demolition and transformation of the main body -3. Hydropower transformation -4. Woodworking -5. Tile -6. Paint the wall -7. Installation of water heater -8. Ceiling in kitchen and bathroom -9. Cabinet installation-10. Install the hood furnace. Switch socket installation-15. Installation of lamps and lanterns-16. Hardware and sanitary ware installation-17. Installation of curtain rod-18. Pioneer cleaning-19. Furniture entrance -20. Installation of household appliances -26438.
(1) Pre-design
The same is construction. The difference between people and bees is that the construction of bees is a reflection of instinct, and before construction, people will form ideas and frameworks in their minds. Therefore, if we compare home improvement to a battle, then the preliminary design of home improvement is the "battle plan" of this battle and the "soul bond" of home improvement.
In the preliminary design, one thing that must be done is to measure your room in detail, mainly including:
1. Define the areas involved in the renovation process. Especially tile area, wall paint area, wallpaper area and floor area;
2, clear the bearing wall size. Especially it is necessary to design the wall size of furniture in the future. By the way, don't forget to go to the property to go through the construction procedures and pay the decoration deposit before starting work.
(two) the main body is removed or changed.
When entering the construction stage, the main body demolition is the first project, which mainly includes wall demolition, wall building, wall skin, plastic steel window replacement and so on. To put it bluntly, the main body demolition is to put up the framework of the construction site first.
(3) Hydropower transformation
Before the water circuit reform, the main structure should be basically completed. Between hydropower transformation and main demolition, the first test of the cabinet should also be carried out. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. Mainly includes:
1, to see whether the position of the lampblack machine socket affects the installation of lampblack machine in the future;
2. See if the location of the water meter is appropriate;
3. See if the location of the water inlet is convenient for installing the sink in the future.
After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately. The kitchen generally doesn't need to be waterproof.
Some owners have always believed that some major ingredients should enter the market in advance before the renovation begins. What I want to say is that unless it is the main material needed for the demolition and reconstruction of the main body, the entry time of the main materials such as tiles and large core boards should be after the hydropower reconstruction. Because if the circuit transformation involves slotting on the ground, the tiles and core plates are not properly placed, and it is very troublesome for workers to move around.
(4) Woodworking
Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement, which I will mention later.
In fact, carpentry such as riser, decorative ceiling, plastering line, etc. can also be considered as a detailed link of the main body demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction, and sometimes needs some cooperation, such as what I mentioned before-"If you are going to make a fake wall at home, you should consider whether there are water and electricity lines on the fake wall. If there are, let the workers who transform water and electricity bury the pipes."
(5) Tiling
If the workers are busy, the foreman will usually ask the "second bricklayer" to stick bricks in the field before the "carpenter boss" finishes. This is normal, because the two do not conflict.
During the operation of "bricklayer's second child", the installation of the following three links is also involved:
1. Installation of lintels and marble windowsills. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.
2. Install the floor drain. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. Therefore, students should buy a floor drain as soon as possible when they start shopping for building materials.
When the "second bricklayer" left the scene, it was time to measure the cupboard for the second time. Accurately speaking, after the kitchen walls and tiles are pasted, it's time for the second measurement of cabinets.
(6) Paint the wall
The "Third Oil Worker" enters the site, mainly completing the basic treatment of the wall surface, painting the top coat and painting the furniture that the "carpenter" hits. Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting. When the "boss", "second child" and "third child" leave the scene one after another, many owners will think that their renovation is almost over, but in fact, according to the number of links, it is less than one third. Everyone has this feeling because it is generally understood that decoration is only the "construction link" of decoration, but in fact, the "installation link" of decoration is also the focus of decoration.
(7) Installation of water heater
After the wall and floor decoration is completed, you can inform the water heater to deliver and install. Water heaters are generally installed in front of the ceiling, and gas water heaters have become the current trend, generally installed in the kitchen or closed balcony. If it is an electric water heater, install it in the bathroom.
(8) Ceiling in kitchen and bathroom
After the water heater is installed, the next step is the ceiling. As an installation link, the kitchen and bathroom ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. Generally, the ceiling lamp and exhaust fan in kitchen and bathroom are installed at the same time.
(9) Installation of cabinet
After the ceiling is completed, you can make an appointment to install the cabinet at home. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.
(10) Install engine hood fittings.
It is best to arrange the installation of cooker and cabinet of range hood on the same day, which is convenient for the two masters to coordinate.
(1 1) wooden door installation
The second day after the cabinet was installed, as early as more than a month ago, after the wooden door was measured, it can be installed now. When installing the door, the hinge, door lock and floor suction should be installed at the same time. The production cycle of solid wood doors is generally one month. Therefore, in order to make the construction period closely connected, it is necessary to let the wooden door manufacturers go to the door to measure the size of the door opening as soon as possible after the main body is removed. Regarding the treatment of the doorway, it should be noted that if the height of the doorway at home is inconsistent, workers need to treat it at the same height-beautiful.
(12) Floor installation
The floor can be installed the day after the wooden door is installed. Attention should be paid to the following issues when installing the floor:
1. Before the floor is installed, it is best to let the manufacturer come to the door to investigate whether the ground needs leveling or partial leveling. Some decoration companies or teams will advise students to level the ground or partially level it, subject to the actual investigation of the floor manufacturer;
2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.
(13) Laying wallpaper
The day after the floor is installed, you can make an appointment to paste wallpaper when the home is cleaned up. If it goes well, it's also a day. If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to leave the wallpaper glue left on the floor to Pioneer for cleaning. Before pasting the wallpaper, try to make the wall "nothing".
(14) switch socket installation
In the bathroom, all sockets and switches must be waterproof and the sockets should be covered. The light switch at the door is suggested to be inductive or fluorescent, so you can go home in the dark to avoid darkness.
Switch sockets should be more than less, and at least one socket should be reserved where sockets are arranged. It should be noted that there will be more and more household appliances. Once you have a new appliance without a socket, it is difficult to install it again.
(15) Installation of lamps and lanterns
Install the lights. There is nothing to say. After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration-it felt really good.
(16) Installation of Hardware Sanitary Ware
Before buying pipe fittings, bathroom fittings, toilets, clothes hangers, etc. , are all installed. After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive", really "alive". It is no exaggeration to say that it will be beautiful to open the dragon water for the first time and watch the water flow out. Convenient, the newly installed toilet at home for the first time will have a great sense of accomplishment.
(17) Installation of curtain rod
The installation of curtain rod marks the basic end of home improvement. You can breathe a sigh of relief, and the busy decoration day has finally come to the fore.
(18) development and cleaning
Don't install curtains before opening and cleaning. When starting a business and cleaning, don't have furniture and unnecessary household appliances at home. Leave as many "planes" as possible to make the pioneering and cleaning completely clean.
(nineteen) furniture comes into play
As for the purchase time of furniture, my suggestion is that it should be completed after the renovation of water circuit at the earliest, so as to get a general understanding of the basic size range of furniture. Therefore, some students have been eager to book all the furniture before the decoration, and personally feel that it is unnecessary.
(20) Home appliances come into play
At this time, it's time for home appliances to enter the market. It's time to install and prepare to move in!
(21) Home accessories
1. The mattress is too soft.
2. If the cooking frequency at home is high, try to give up the open kitchen, and there will be soot problems.
3. Toilets and kitchens are all small water treasures, and hot water comes quickly and is more convenient to use.
4. Many people say that the suction of Chinese range hoods is stronger than that of European range hoods, which is actually wrong. The suction mainly depends on the displacement.
5. the power socket can be decorated as much as possible, otherwise there are drag boards everywhere in the house.
6. The partition of the shoe cabinet should not be above, leaving some space for the ash of the shoes to leak to the end.
7. bath PK shower, if you choose one, it is still recommended to take a shower. Many people have never taken a bath.
8. If you have two bathrooms, you still need to install a bathtub. Soaking big clothes and bathing your baby are all good choices. A jacuzzi is not necessary. You can't soak it for several times, and it's extremely expensive.
9. I didn't consider the position of the dining table when I installed the lamp. Now the light is not in the middle of the table.
10. If you like surfing the Internet, at least two internet ports and two 1 1 should be reserved on each wall of each room. I'm sorry that the kitchen flue is not perforated. Now as long as someone is cooking in the building, my own range hood must be turned on at the same time, otherwise the room will smell of oil smoke.
12. The locations of various sockets in the room are different from the sizes of furniture bought later, which wastes a lot of sockets.
13. If you can't buy it in the mall, don't ask a carpenter to do it! Unless this woodworking skill is good.
14. The color of the floor should be a little lighter, so it is not easy to see ash, but the kitchen and bathroom floor tiles should be a little deeper, so it is not easy to find hair everywhere, which is the most resistant to dirt.
15. It is best to install ceiling fans in the restaurant, which is super comfortable.
16. As much storage space as possible, there will be more and more sundries to be stored after check-in.
17. It is better to use ceramic tiles for balcony walls, which are more waterproof than paint.
18. I regret buying so many lamps and installing so many lamps, but in fact I just used those lamps for fixed purposes.
19. The toilet dresser is glass, which is easy to get dirty.
20. It is best to control the ceiling lamp in the bedroom, one by the door and the other by the bed, so as to avoid lying in bed and turning off the lights in winter.
2 1. Bathroom hardware, faucets and the like must be paid for.
22. When decorating, try not to leave indelible places, and it is difficult to carry out dead corner hygiene.
23. Families who plan to have children in the future must calculate the size and reserve the position of the crib at the bedside.
24. It is suggested that all faucets should be equipped with hot and cold water pipes. It won't cost much to install more when decorating, and it's extremely difficult to remedy afterwards.
25. The layout of the room is as impractical as possible. If the renminbi is posted, it will not be torn off, and sooner or later it will become obsolete.
26. Pay attention to the size of the door inside the house when buying anything. You can't move in without buying it.
27. The solid wood floor feels good but needs maintenance, and the composite floor is easy to clean.
28. Invisible doors are useless, and it is also troublesome to open ventilation.
29. The walk-in wardrobe is good, but it is easy to accumulate dust. An open bookshelf, shelf, etc. It looks good, but it hurts to rub, especially books, which are covered with dust.
30. This lamp must not be washed. Just hang it until the dust accumulates.
Editor's summary: The above is the most detailed introduction of house decoration strategy in history, hoping to help friends in need! Please continue to pay attention to our website for more information. More exciting content will be presented later. You can also go to Rilong Decoration Mall to buy more products you like!
- Related articles
- Is Chuxiong Security Company a private enterprise?
- What about Henan inter electrical equipment co., ltd?
- How about Ryan Jiaxin Hua Ting Community?
- Working hours of Minhang District Post Office in Shanghai
- Where can I complain if the property safety production plan is not in place?
- The property has the right to prevent merchants from hanging banners at the door.
- Which community does the Customs Family Building in the new urban area belong to?
- When will Zengcheng Everbright ONE+ deliver the house?
- Cleaning service scheme of property company
- How about Shanxi Hengsheng Jiapin Real Estate Development Co., Ltd.?