Pay attention to decoration

1. Don't finish the partition of the shoe cabinet, leave some space for the ash of the shoes to leak to the end, and install lights above the sink and gas stove. When determining the location of the bathroom floor drain, we must first think about it and measure the size. The floor drain is best located on one side of the brick. If it is in the middle of the brick, the floor drain will not be the lowest point no matter how inclined the brick is.

2. There is no switch in the bathroom and air conditioning socket. Especially for the electric water heater in the bathroom, it is advisable to adopt a plug two-level switch. If you want to turn off the electric heater, it is dangerous to unplug it.

3. In the final analysis, the external corner treatment of brick still depends on the level of workers. If the bricklayer is good and the tools for grinding ceramic tiles are better, you should not hesitate to choose the method of grinding 45 degrees. In terms of effect, as long as the grinding is good, grinding the outer angle of 45 degrees is the most beautiful! If the level of workers is really not good, then you still choose to use angle iron, because it is not as good as using angle iron to grind at a 45-degree angle.

It is also important to test the pressure after the water pipes are arranged. Everyone must be present during the test, and the test time should be at least 30 minutes, preferably 1 hour if conditions permit. 10 kg pressure, and finally passed the test without reducing energy.

5. When making a plastic door, be sure to calculate the size of the plastic door frame protruding from the wall surface and inform the installer, so that the final door frame and the tiled wall surface are flat, which is both beautiful and hygienic.

6. The carpenter's doorcase and the bricklayer's tiling should also be coordinated. When wrapping the door cover, you should consider whether the ground below (either side of the ground on both sides of the door) should be tiled or leveled with other cement mortar, because if the door cover is nailed before tiling, it will be wrapped all the way to the ground. When cement is used in the future, if the cement and the door cover are stained, it will lead to water absorption and mildew of the door cover wood.

7. The bottom of the mattress and the bedplate must be breathable. Generally, it is best to use fir boards as bed boards.

8. Try to use paper tape when drawing.

9. Pay attention when buying a lamp: generally try to use glass, stainless steel, copper or wood (shelf). Generally don't buy any iron with other coatings and paints on it, which is easy to fade.

10. The washbasin should use ceramic basin as far as possible, and the glass basin is difficult to clean.

1 1. Hydropower reconstruction should be planned by themselves, and they are required to drive in a straight line. I watched them draw their own lines, and they all followed them. You must personally check and accept every project.

12. Waterproofing must be done well, and water must be tested!

13. Many verbal agreements in construction have become a gap when checking out, so be sure to write them clearly in black and white. Be sure to ask clearly about the added or reduced items and write clearly the price!

14. If the floor is installed on the ground, the ground should be re-cemented and leveled.

15. For the kitchen door, it is best to use a carpenter who wants to decorate it into a wooden rail door.

16. Install as many power plugs as possible in the living room.

17. There is a partition outside the shower in the bathroom. You can't save yourself by pulling the shower curtain. Actually, it was very inconvenient, and the water spilled all over the floor.

18. Doors and doorframes shall be made of fine-grained materials.

19. Make sure that your waterway is OK before installing the cabinet.

20. Don't choose white for kitchen and bathroom floor tiles.

2 1. The ceiling should pay special attention to leveling putty before plastering Dulux.

22. Don't have too many lights in the living room, it's better to be concise, otherwise it will be like a lamp shop!

23. Buy things that need to be installed and try to install the goods. It really doesn't include installation. After installation, you must insist on paying the full amount!

24. When decorating, bring the business cards of the manufacturers and merchants you collected before.

25. It is best to remove the protective film of aluminum gusset plate before installation.

26. It is best to use shutter doors for shoe cabinets to prevent odor. A socket can be left next to the shoe cabinet for inserting and airing shoes.

27. A small lamp can be installed in the place where vegetables are cut.

28. Restaurants can also be equipped with exhaust fans, so that when eating hot pot or barbecue, the ceiling of the hall will not be dirty.

29. It's best to arrange a cabinet for sundries at the door, which can be placed on the shoe cabinet. It is convenient to put common things, such as umbrellas, bags, scissors, change, medicines that you often take, etc. There.

30. There is absolutely no need to use expensive smallpox. If you are not too worried about humidity and oil fume, it is recommended to brush waterproof paint with moisture-proof gypsum board. A guest guard of my family made this. It's very beautiful. If you must use aluminum gusset ceiling, I suggest 1, not too expensive. 2. Use solid colors, especially the kitchen ceiling. Pure white will do. Unless the color matches the decoration style, it is easy to be out of harmony. Make up your mind and don't trust the eyes that sell the ceiling. Their eyes are really corny. 4, staring at the scene, it is very important to close the edge, don't let them be sloppy, or leave a black seam, which is ugly.

3 1. Third, if you need to punch holes, continue to stick tiles, and the exhaust holes of range hoods and water heaters should be pre-punched. It's inconvenient to wait until the tile is pasted. Therefore, before the renovation, you must choose the range hood, cooker and water heater to determine the size of the hole.

32. Considering that the customized cabinets are beautiful, but not durable, after synthesizing the opinions and experiences of some students on the Internet, the floor cabinets are made of cement, with ceramic tiles inside and outside, marble countertops, hanging cabinets and cabinet doors made of wood. The cabinets made by this method are durable and moisture-proof. And it doesn't cost much Many neighbors read it and said yes, I didn't blow it.

33. After making the door cover, the plasterer began to install plaster lines and paint the walls. The wall of my house was originally flat, and 2-3 roads could be approved. When approving the ash, it is to polish it once, then brush the primer, polish it again after brushing, and finally brush the top coat twice with ICI. The whole wall looks smooth and flat, which is really good. After the wall smallpox project was completed, the carpenter began to make wardrobes. The wardrobe is made of 18cm Ye Wei brand core board with decorative board outside. Although it is not as beautiful as the furniture store, it is durable and the quality should be better than the one bought. I'm not afraid to stand on the board of the cabinet. I'm afraid not. The backboard is also thick, and I bought it very thin.

34. Other students must pay attention to the following points when pasting tiles: ① It is best to be on site; ② Some imperfect tiles can be pasted by workers in some invisible places in the future, such as cabinets, sinks and mirrors. Be careful not to let workers paste them in the above positions, otherwise nothing will be seen in the future and money will be wasted. (3) Before the wall brick and floor tile are pasted, the soaking time must be enough. (4) Be sure to block the floor drain with something to prevent the cement from falling and blocking. The floor drain in my house is blocked by falling cement. Looking for the management office to clear 30 doors and bring a lot of small clods. ⑤ Workers will not waste too many tiles when people are on site. My family wasn't there when I put up the tiles. Later, when I went to see them, a lot of bricks were wasted, which was very painful. All sweat and rice.

35. Length and height of the wall. If a bathroom has four walls, the length and height of each wall should be measured. Then deduct the area of a window and door. Finally, calculate the area of the ground. After you have measured your size, you can also take it to the shop selling tiles, and they will help you satisfy it again. Just add a 5% loss.

36. It is best to double-control the ceiling light in the bedroom, so that you won't get up and turn off the lights when you lie in bed in winter.

37. The location, height and spacing of sockets must be calculated. Occasionally, the position of the card holder was hit by steel bars first, and then the card holder was found to be blocked by TV cabinets, microwave ovens and desks, so we had to move the position of the first two pieces of furniture higher. Finally, it is found that not only the height is not ergonomic, but also the stainless steel cabinet feet can't be bought properly, so we can only order aluminum feet.

38. Just install a light at the corner of the aisle, which is bright and effective.

39. I didn't consider the position of the dining table when I installed the lamp. Now the light is not in the middle of the table.

40. Don't use bathroom tiles in Tai Su. First, it is easy to get dirty, and second, it is too dull after a long time!

4 1. More sockets should be installed, furniture should be bought outside, the floor should be dirt-resistant and safe, the model rooms should be seen more, and the principle should be adhered to.

42. There is no need to buy high-priced aluminum gusset plates, and no matter how much money you spend, you won't see significant results. Pay special attention to the keel rather than the aluminum gusset itself when buying aluminum gusset plates (the goal of aluminum gusset plates is too big to be easily tampered with), and ghosts often end up on the keel.

43. It was difficult to find a floor tile with a satisfactory color, so I didn't find it. However, two unsatisfactory colors can be staggered and then turned at a 45-degree angle to achieve satisfactory results. This is a good suggestion put forward by the bricklayer himself.

44. If you hit the cabinet on the top of the balcony, add a layer of foam plastic board behind the cabinet, which has a very good heat insulation and waterproof effect. It is best to use fire-proof boards for balcony doors. The environment of the balcony is relatively poor.

45. If there is no suitable wood thread, it may be customized. The customized quality seems to be better than the sample. And customization is more personalized.

46. Stainless steel feet used in bathroom cabinets are profiteering, and it is very cheap to find some places on the back of the store.

47. When installing the door lock, you should pay attention to some wax on the lock tongue. If it is damaged, it will be too late to wax it. If there is no door suction, pay attention to prevent the handle from hitting the wall and being damaged.

48.Paco floor is very good. I like it. The only thing to remind is that it may be better to talk about the price directly with the boss than with the salesperson.

49. matte paint is just more beautiful than highlights.

Decoration design of unit building;

1, make a preliminary design first, mainly to make a detailed measurement of your room according to your living habits. Don't be lazy, you'd better measure yourself. It is also necessary to clarify the areas involved in the decoration process, especially the tile area, wall paint area, wallpaper area and floor area. Identify the main wall dimensions, especially the wall dimensions that need to be designed for furniture in the future.

2. Then, tear down the main body and change it. In the construction stage, the main body demolition is the first project, which mainly includes wall demolition, wall building, wall covering, heating removal, plastic steel window replacement and so on. To put it bluntly, the main body demolition is to put up the framework of the construction site first.

3. Before the hydropower renovation project and water circuit renovation, the main structure should be basically completed. Some students may know that it is the first time to measure the cabinet between hydropower transformation and main body demolition. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. It mainly includes whether the position of the lampblack machine socket affects the installation of the lampblack machine in the future, whether the position of the water meter is appropriate, and whether the position of the water inlet is convenient for installing the sink in the future.

4. Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement, which I will mention later. In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.

5, ceramic tile:

During the operation of "bricklayer's second child", the installation of the following three links is also involved:

Installation of lintel and marble window sill. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue.

Install the floor drain. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. Therefore, students should buy a floor drain as soon as possible when they start shopping for building materials.

Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood.

When the "second bricklayer" left the scene, it was time to measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, it is time to measure the cabinet for the second time.

whitewash a wall

The "Third Oil Worker" enters the site, mainly completing the basic treatment of the wall surface, painting the top coat and brushing the furniture made by the "carpenter". Students who are ready to paste wallpaper only need to let the "third oil worker" do basic treatment on the wall surface where wallpaper is planned. As for whether I left my coat for the last time, I personally don't think it is necessary to take this question too seriously. From my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting.

6, kitchen and bathroom ceiling

As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best for students to install ceiling lamps and exhaust fans (Yuba) in the kitchen and bathroom at the same time, otherwise thread ends and holes will be left.

7. After the ceiling is finished, you can install cabinets at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

8. The second day after the cabinet was installed, after the wooden door measurement was completed more than a month ago, it can probably be installed now. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed. Students should prepare related hardware in advance.

If you want the wooden door manufacturer to install the window cover and pass it, you should also measure it when the wooden door manufacturer measures it, and install it at the same time on the day when the wooden door is installed. At the same time, you should consider putting the installation time of marble windowsill backward after the window cover is installed.

Remarks: The production cycle of wooden doors is generally one month. Therefore, in order to make the construction period closely connected, wooden door manufacturers should go to the door to measure the size of the door opening as soon as possible after the main body is demolished and rebuilt. Regarding the treatment of the doorway, it should be noted that if the height of the doorway at home is inconsistent, workers need to treat it at the same height-beautiful.

9. The floor can be installed the next day after the wooden door is installed. If all goes well, it will take a day. The floor installation needs to pay attention to the following issues:

1), before the floor installation, it is best to let the manufacturer visit to inspect whether the ground needs leveling or local leveling. Some decoration companies or teams will advise students to level the ground or partially level it, subject to the actual survey of the floor manufacturer;

2) Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process.

3) When installing the floor, if possible, the floor must be cut in the corridor. The forum also discussed this issue before, and some students thought it was immoral to cut the floor pollution area in the corridor. My idea is to clean up after completion, which doesn't matter. Cutting the floor indoors has serious pollution to the wall surface, and there is also the cutting of artificial stone countertops in cabinets. I believe all the students who have been decorated have some experience.

10. On the second day of floor installation, when the house is ready, you can make an appointment to lay wallpaper. If it goes well, it will take a day. If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to leave the wallpaper glue left on the floor to Pioneer for cleaning. Before pasting the wallpaper, try to make the wall "nothing".

1 1. The day after the wallpaper is laid, students who have replaced or removed the radiator can hang the radiator on the wall in a down-to-earth manner. It's also a day.

12, students should have a detailed understanding or record of the number and location of switches and sockets in various natural rooms at home, especially those who paste wallpaper. Sometimes the wallpaper worker is irresponsible, and the wallpaper is laid at once, and there is no need for wallpaper knife to mark the position of your switch socket. So students still need to know for themselves.

13, install the lights, there is nothing to say. After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration-it felt really good.

14, all pipe fittings, bathroom fittings, toilets, clothes hangers, etc. Everything I bought before was fake. After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive", really "alive". It is no exaggeration to say that it will be beautiful to open the dragon water for the first time and watch the water flow out. Convenient, it's the first time I installed a new toilet at home, and I always feel a sense of accomplishment. By the way, I gave it a good name-"Virgo".

15, curtain rod installation marks the basic end of home improvement. Don't install curtains before the start-up cleaning, remember to remind everyone in the post of "explaining curtains" When cleaning, don't have furniture and unnecessary household appliances at home, leave as many "planes" as possible, so that the cleaning can be thorough.

16. As for the purchase time of furniture, my suggestion is that it should be after the water circuit decoration is completed at the earliest, so as to get a general idea of the basic size range of furniture. Therefore, some students have been eager to book all the furniture before the decoration, and personally feel that it is unnecessary. At this time, it's time for home appliances to enter the market. It's time to install and prepare to move in!

17, home decoration, the last step of home improvement, and it has changed from decoration to decoration, including the installation of curtains. As for buying curtains, it is best to book furniture first to avoid style conflict. Home accessories also include buying some green plants, hanging murals, decorative handicrafts and so on ... in short, you can play freely after staying.