Application report for completion acceptance

Application Report for Completion Acceptance (General 1 1)

In today's society, we use reports more and more, and there are different types of reports according to different purposes. Are you still at a loss about writing the report? The following is the application report for completion acceptance that I compiled for you (total 1 1). Welcome everyone to learn from it, I hope it will help you.

1 xx investment development co., ltd. application report for completion acceptance:

Subject: Application Report for Quality Inspection of Liuhe Section of the North Shore Connecting Line Project of xx Bridge.

Report content:

Line 6 of Hangzhou Bay Bridge North Connection starts from Buyun Hub of Shanghai-Hangzhou Expressway with the pile number k24+000 and ends at the north bridge head of xx Bridge with the pile number k48+785, with a total length of 24.785 kilometers. The total contract price of pavement is 272.237 million yuan, which was won by ASEAN Company on June 24th, XX. The contract period is from February 15 to 10/0/5, XX. After careful organization and reasonable planning by our department, all construction contents were completed according to the contract requirements.

Our unit carried out self-inspection on the project quality according to the Standard for Inspection and Evaluation of Highway Engineering jtgf80/ 1-XX formulated by the Ministry of Communications, and the Measures for Acceptance of Highway Engineering Completion (Handover) promulgated and implemented by the Ministry of Communications on March 3 1 and related regulations. All subdivisional and divisional works are qualified, and all subdivisional and divisional works are above 90 points, with excellent rate 100% and excellent self-rating grade, which meets the requirements of design and quality regulations.

Now our unit has organized personnel to compile the completion data, which is complete and has been compiled in strict accordance with the contents stipulated by the Ministry of Communications, meeting the specified requirements. My project management department and supervision engineer have finished the work summary of this contract.

At this point, our company has completed the work before handover quality inspection stipulated in the Measures for Acceptance of Highway Project Completion (Handover) promulgated and implemented by the Ministry of Communications on March 2 1 xx, and has the conditions for handover quality inspection. Now our company applies for quality inspection of Liuhe section of the connecting line project on the north bank of XX Bridge.

I hereby report it.

I am here to convey

Salute!

Applicant:

Date:

2 xxx Quality Supervision Station Completion Acceptance Application Report:

Project xxx started on xx, xx, xx. With the care and support of superior leaders and the active cooperation of relevant units, the contract and design contents were successfully completed. The quality of the project conforms to the relevant national norms and mandatory regulations, and the engineering technical data are complete and qualified. Therefore, we hereby apply for completion acceptance.

Construction unit:

Date:

3 xxx liability company completion acceptance application report:

The shantytown renovation project 10# building of Guanzhong Tool Company undertaken by our unit was inspected by the project department and verified by the company, and it was considered that it had the conditions for completion acceptance. Now you are applying for completion acceptance, please organize relevant units to check and verify.

Applicant:

Date:

Application Report for Completion Acceptance 4 I. Overview of the Project:

Xxxx Phase II townhouse 36# project is invested and developed by Tianjin Development Zone Taifu Real Estate Development Co., Ltd., undertaken by xxxx Construction Engineering Co., Ltd., supervised by Tian Jian Engineering Management Co., Ltd., designed by Tianjin Construction Engineering Group Architectural Design Co., Ltd. and surveyed by Beijing China Railway Engineering Design Institute. The construction area of this project is 458,43m2, with three floors and brick-concrete structure.

Second, the quality control of the construction process:

The factory certificates and certificates of the main building materials used in the construction process, such as steel bars, cement, bricks, sandstone and commercial concrete, are complete and effective; On-site sampling for second interview, put into use after passing the second interview, and the quality meets the design and specification requirements.

Foundation and foundation, main body, decoration and concealed works are qualified by self-inspection, and the inspection records of concealed works are made, and then submitted to the supervision for acceptance. After the acceptance, the next working procedure can be constructed. The concrete strength test report is qualified and complete. Standard test blocks are reserved for mortar, and the strength test report is qualified and complete.

Roof waterproof adopts Yuhong brand waterproof material produced by Tianjin Yuhong Building Waterproof Material Co., Ltd.; Polyurethane waterproof for toilet floor adopts Yuhong brand waterproof material produced by Tianjin Yuhong Building Waterproof Material Co., Ltd.; External wall insulation adopts a series of products produced by Hongshun Foam Board Factory in Baodi District, Tianjin. Broken bridge aluminum alloy window is produced by Tianjin Dagang Changjiang Aluminum Co., Ltd.

Practical materials, quality certificates and certificates of water supply and drainage, heating and electrical engineering are complete and effective.

Third, the engineering construction control data:

The quality control data of this project are synchronized with the construction and basically complete; Where * * * occurrence control data is 21; Safety function data 10, visual quality data 10. Among them, roof spraying, toilet water test, aluminum alloy window, water supply and drainage and heating air tightness test, electrical lighting power-on trial operation and other three safety use functions passed the performance test. All the above materials have passed the acceptance of the supervisor and meet the requirements of construction specifications.

conclusion

During the construction of this project, the management system, quality assurance system and safety assurance system have been established and improved, the building regulations and construction quality acceptance specifications have been strictly implemented, and the process control has been adhered to, so that the problems arising in the construction have been rectified in time, the occurrence of major quality accidents has been eliminated, and the project quality has been ensured.

At present, through the joint inspection of the technical quality department of our company, the project has been completely completed. After self-inspection, the project quality meets the design requirements and construction quality acceptance specifications, and the project quality is qualified and meets the completion requirements. We hereby apply for inspection.

5 xx Municipal Water Affairs Bureau applies for completion acceptance report:

Jintang county solved the rural drinking water project for people and livestock in 20xx. According to "Reply on the Implementation Plan of the Second Batch of Special Funds (National Debt) in Chengdu" issued by Chuanshuihan [20xx] 130 of the Provincial Water Resources Department, the project started on May 26th, 20xx, and was completed on October 30th, 20xx, completing Qixian Township of Wufeng Town. The main contents of the project include: drilling 3 wells, building 4 pumping stations, building 5 water supply pools ***7 13 cubic meters, building 4 management rooms of 46 1.22 square meters, building 4 pump houses of 30.45 square meters, laying 0.95 kilometers of transmission lines and laying 77.0252 kilometers of pe pipes and pvc-u pipes. The total investment is 2,750,500 yuan, including 2140,000 yuan from the central budget, 485,000 yuan from the municipal matching fund and 654,380+025,500 yuan from the local government. Complete the rural drinking water project construction tasks assigned by the provinces and municipalities, and complete the completion data as required. It is now applied for the leaders of relevant business departments of provinces and cities to complete the acceptance of rural drinking water project in our county, and deliver it to the engineering units for normal use, so as to bring the project into full play.

No, please instruct!

Applicant:

Date of application:

Application Report for Completion Acceptance 6 I. Overview of the Project:

1. Project name: XXX Central Kindergarten in Zunyi County.

2. Project location: next to XXX Shawan Primary School in Zunyi County.

3. Building area and floors: The building area is about 1928m/- 1+3 floors.

4. Quality objective: achieve the qualified objective stipulated in the contract.

5. Employer: XXX Shawan Primary School, Zunyi County.

6. Supervision unit: Guizhou XXX Supervision Co., Ltd.

7. Designer: Guizhou XXX Architectural Design Co., Ltd.

8. Geological exploration unit: Shenzhou XXX Research Institute Co., Ltd.

9. Construction unit: Zunyi XXX Construction Engineering Co., Ltd.

10, engineering features: the number of floors in this project is-1+3, the structural form is frame structure, the foundation form is excavated pile and independent column foundation, the foundation design level is Grade C, the structural safety level is Grade II, and the structural design service life is 50 years. The fortification intensity in this area is less than 6 degrees. Because this project is a teaching building, seismic design is carried out according to the key fortification categories, and seismic Class C treatment is carried out. The concrete strength grade of this project: hole pile C30, ground beam C30, column C30 of one to three floors, beams, slabs and stairs C30 of each floor. The project started on July 20th, 20xx, and was submitted for acceptance on May 25th, 20xx.

Second, the project completion profile:

According to the contents of the contract agreed by all parties involved in the construction, the project design and construction will complete the task according to the required project and meet the quality grade requirements stipulated in the contract. During the design and construction of this project, all laws and regulations, quality assurance materials, construction management and ex-factory inspection reports of building materials, components and equipment will be strictly implemented and kept complete and effective. According to the contents agreed in the construction drawing, the completion review is as follows:

1. Completion of design project: foundation, main body, indoor and outdoor decoration works; Water supply and drainage engineering, fire fighting engineering; Building electrical installation project; Roofing engineering; After inspection, the foundation project is qualified, the main project is qualified, the indoor and outdoor decoration project is qualified, and the roof project is qualified; Water supply and drainage works are qualified; Building electrical engineering is qualified; Fire engineering is qualified.

2. Technical files and construction management materials: technical files such as pre-construction and construction drawing design review are complete after review; Supervision technical files and management information are complete; Construction technical files and management information are complete.

3. Test report: the test report of main building materials (steel, cement, brick, sand, stone, waterproof materials, electrical materials, etc.) after examination. ) is complete and meets the requirements.

4. Project quality guarantee: the project quality guarantee has been signed, and the quality guarantee and the house use manual have been compiled.

Three. Supervision and rectification:

In the process of each division and sub-project, the construction, design, supervision, construction and other units cooperated closely, and the inspection of each project was well completed, and the quality was strictly controlled during the inspection. For places that need rectification, as soon as the construction is convenient, it is necessary to seriously rectify. After the rectification is completed, the supervisor will conduct re-inspection and acceptance, and the next working procedure can only be entered after reaching the standard requirements.

In the process of construction, the supervision unit carried out the construction in strict accordance with the requirements of national engineering quality standards, and cooperated with the contractors to complete the construction supervision task of this project. Every working procedure in the process of engineering construction is carried out in strict accordance with the supervision outline and procedures, which ensures the engineering quality.

Four, the acceptance unit:

According to the requirements of the Ministry of Construction's Interim Provisions on Completion and Acceptance of Housing Construction Projects and Municipal Infrastructure Projects, the construction unit organized the project on May 20th, 20xx.

Organize the preliminary inspection, and organize the formal acceptance of the completed project on May 25th, 20xx. The personnel composition of the construction, design, survey, supervision, construction unit and supervision station participating in the completion acceptance meets the requirements.

Verb (abbreviation of verb) acceptance and rectification:

When the project is accepted, the construction, supervision, construction, design and other units put forward acceptance opinions. In view of the problems raised in the acceptance, the construction unit has completed the rectification, and the relevant units have passed the re-inspection. The project also carries out safety tests such as indoor environment test and equipotential test. The test report is provided by the quality supervision department, and the test result is qualified.

VI. Overall evaluation of the project:

With the close cooperation of construction, design, supervision, construction and supervision units, the XXX central kindergarten project in Zunyi County was successfully completed. Meet the completion acceptance conditions, and now formally organize the completion acceptance.

Applicant:

Date of application:

Application Report for Completion Acceptance 7 The application report for project completion acceptance is a series of descriptions of the project construction after the completion of the project, such as the application category of funds, the nature of the project, the comprehensive evaluation of the availability of funds, the use and management of funds, the completion of the project construction content, the engineering quality of the construction project, the operation of technical equipment, and the preparation for production.

1, basis for completion acceptance

(1) Project approval (filing) documents, project fund application report and project investment plan.

(2) environmental impact assessment report and reply, energy-saving assessment report and its review opinions, as well as the reply of land, planning, safety production and other matters.

(three) national and provincial standards, specifications and product technical standards related to engineering construction, environmental protection, energy saving and safety production.

(4) Engineering supervision, bidding and procurement contracts for important equipment and raw materials.

2. Acceptance conditions

(1) The project has been completed according to the requirements of the fund application report and the project investment plan, and the production, economic and technical indicators have reached and can meet the production and use requirements. Production preparation can meet the needs of production.

(2) The main process equipment and supporting facilities have passed the combined load trial operation, which can produce qualified products that meet the requirements of capital application report, form production capacity, and achieve the expected economic and social benefits.

(3) The project quality meets the relevant national standards, and the products meet the technical standards.

(4) Environmental protection, energy saving, production safety, fire fighting and other facilities have been completed and used simultaneously with the main project according to the design requirements, reaching the requirements stipulated by the state.

(5) The final financial report of the project completion shall be compiled and audited by an accounting firm with corresponding qualifications.

(6) The technical documents and data of the project shall be filed as required, which can meet the needs of production, use and maintenance.

If the project basically meets the conditions listed in the preceding paragraph, sporadic civil works are not completed or a few non-main equipment are not in place, but it does not affect the normal production and use of the main project, and the proportion of unfinished investment in the total investment budget is less than 10%, with the consent of the competent department of industry and information technology and the financial department, it may also apply for completion acceptance.

3, the completion acceptance content

(1) Investment completed. Including the availability of project funds, the use and management of special funds for technical transformation, the audit of final financial accounts and the bidding.

(2) the completion of the project construction content. Including land requisition, civil engineering, equipment purchase and installation, public auxiliary facilities construction, etc.

(3) the quality of construction projects and the operation of technical equipment. Including environmental protection, safe production, energy-saving facilities, fire-fighting facilities and so on.

(4) After the project is completed and put into production, the level of technology and equipment, product technology, quality, production capacity, economic and social benefits, energy conservation and environmental protection, safety in production, etc.

(5) production preparation. Including production liquidity, raw material supply, energy supply, personnel training, etc.

(6) Archiving of technical documents and data of the project. Including approval, design, supervision, bidding and other documents, as well as the filing of technical documents and drawings such as construction and installation projects, process equipment and public auxiliary facilities.

(7) The elimination of backward production capacity requires the elimination of backward production capacity projects.

Applicant:

Date of application:

8 City Housing and Urban-Rural Development Bureau completion acceptance application report:

The project undertaken by our company started on March 20th, 20xx 10, with a total construction area of ㎡. 1# building: frame shear wall 1 floor, 2-5 # building: brick-concrete 6+ 1 floor, and 6# building: frame shear wall1floor. The construction has been completed in strict accordance with the requirements of the drawings. This project has passed the acceptance of planning, safety, energy saving, lightning protection and fire fighting, with complete information and qualified self-inspection.

Now I apply to your bureau for organizing the completion acceptance.

Applicant:

Date of application:

Application for completion acceptance report 9 I. General situation and completion of the project:

Xxxx field overseas Chinese workers' fund-raising housing project is located in the compound of No.26, Wuxu Section, Youyi Road, Jiangnan District, Nanning. The project cost is 3188,000 yuan, with a total construction area of 3,009,552 square meters. The structural form is concrete frame structure/6 floors above ground, with total building height of 17 and 15 meters, indoor and outdoor height difference of 300 mm, three types of building structure, seismic fortification intensity of 6 degrees, reasonable service life of the building of 50 years, waterproof grade of 3 and safety grade of the building structure of 2.

According to the requirements of design drawings and related design documents, our company has completed the construction tasks of foundation and foundation sub-projects, main structure sub-projects, building decoration sub-projects, building roof sub-projects, building water supply and drainage and heating sub-projects, building electrical sub-projects and building energy-saving projects.

Second, the acceptance conditions inspection results:

According to the relevant provisions of the Unified Standard for Construction Quality Acceptance of Building Engineering, the project has completed the construction task according to the design requirements, the safety and use function of the project structure meet the requirements, and the preliminary inspection conditions for the project completion acceptance have been met. Application report for completion acceptance. After the preliminary inspection of the remaining individual details, the construction and supervision unit will put forward the rectification requirements, and our company will submit it to the construction and supervision unit in the form of a written report after completing the rectification as required.

Three. Preparations for acceptance organization:

Our company has compiled the Project Quality Assessment Report (Draft) of the Construction Unit of Overseas Chinese Funded Housing Project in xxxx Oilfield. The initial acceptance of the project completion is organized by the construction unit, with the participation of the construction unit, supervision unit, design unit and survey unit, and an acceptance team is formed to conduct the acceptance work. After the completion acceptance, each contractor shall prepare the corresponding project quality evaluation report as the necessary data for the final completion acceptance.

Four. Suggested acceptance time and place:

According to the completion of the project and the relevant requirements of provinces and cities, it is suggested that the initial inspection time for the completion and acceptance of the fund-raising building for overseas Chinese workers in xxxx field is 3: 00 pm on March 20, 20xx, and the acceptance place is the general factory area of xxxx field.

To sum up, the fund-raising building project of xxxx field, which belongs to overseas Chinese workers, has met the preliminary inspection conditions for completion acceptance, so please arrange acceptance.

Application for completion acceptance report 10 I. Project completion:

The reinforcement project of XXX Reservoir has been approved by provinces and cities, with a total investment of10.006 million yuan, including 7 million yuan of national debt funds and 3.06 million yuan of local matching funds. The main contents of reservoir reinforcement are:

(1) The elevation in front of the dam slope/above kloc-0/563 is changed to mortar block stone to reinforce the upstream dam slope, and a concrete cutoff wall is added behind the toothed wall at the junction of the left abutment core wall of the dam and the right side wall of the spillway;

(2) Strengthen the regulation of spillway and downstream river;

(3) Replace the arc working door and the flat panel access door, and replace the arc door hoist;

(4) Reinforce and transform the roads leading to dams and reservoirs;

⑤ Increase dam observation facilities and automatic control system.

The project started on May 3rd, 20061day, and was fully completed at the end of June, 2002, lasting 13 months. The main part of the reinforcement project has been completed according to the scheme approved by the design, that is, the dam slope reinforcement project in front of the dam has been completed; Spillway reinforcement and downstream river regulation project; Complete the reinforcement project of Shangba Highway, including highway slope protection 1 .27km, asphalt pavement laying of 3.2km, highway bridge1seat, and 6 flood discharge culverts; Complete the safety project of emergency gate, working gate and opening and closing equipment of water conveyance and flood discharge tunnel; Complete the installation of dam automatic monitoring equipment and other projects. At present, due to the influence of local matching funds, the dam concrete cutoff wall project has not been completed, the dam seepage water level measuring instrument has not been installed, and the rest of the main projects have been completed according to the design requirements. * * * The investment of this project has been completed at 90152,400 yuan (excluding the cost of 200,000 yuan to be inspected), and the main quantities completed are: 83,900 m3 of earthwork excavation, 20,200 m3 of earthwork backfilling, 0/./kloc-0,600 m3 of masonry and 0./kloc-concrete.

Second, the acceptance conditions inspection results:

According to the relevant provisions of the Code for Acceptance of Water Conservancy and Hydropower Construction Projects issued by the Ministry of Water Resources, the main construction tasks of the project have been completed according to the design requirements. Although some unfinished projects were not completed due to the influence of local matching funds, it did not affect the normal and safe operation of the project. The project investment is reasonable, and the final accounts for completion have been compiled and passed the completion audit. The completion data has been compiled, and the construction quality of the project has passed the quality inspection of xx Water Conservancy Capital Construction Supervision Station, and the project quality inspection and evaluation report has been issued, and the project quality is qualified. In the trial operation of the project, the project can run normally, with remarkable economic and social benefits, and has reached the formal acceptance conditions.

Three. Preparations for acceptance organization:

At present, the legal person of the reinforcement project of xxx Reservoir has compiled the Work Report of Project Construction Management and the Appraisal of Project Completion Acceptance (Draft), and the engineering design, construction, supervision, operation management and other units have also compiled corresponding work reports. According to the relevant provisions of the Code for Acceptance of Water Conservancy and Hydropower Construction Projects, the project legal person requests the higher authorities to set up a "Completion Acceptance Committee" to be responsible for the completion acceptance of the reinforcement project of xxx Reservoir.

Four. Suggested acceptance time, place and participating units:

According to the completion of the project and the requirements of relevant departments of provinces and cities, the reinforcement project of xxx reservoir is planned to be completed and accepted in 20xx, and the acceptance place is in. Participating units include Provincial Water Resources Department, xx Water and Electricity Bureau, Finance Bureau, Planning Bureau, xx Basin Water Resources Administration, project legal person, design, supervision, construction, quality supervision, operation management and other related units.

To sum up, the reinforcement project of xxx Reservoir has met the completion acceptance conditions, so please arrange formal acceptance by the higher authorities.

Applicant:

Date:

Application report for completion acceptance 1 1 1. Project completion:

Building xx Home 1 2# in xx County was started by the 11th Project Department of xx County Housing and Construction Company on xx, and was fully completed by the end of xx, which lasted for xx months. The main project has been completed according to the approved design scheme, namely: civil decoration and decoration project; Water supply and drainage works; Electrical equipment installation project.

Second, the acceptance conditions inspection results:

According to the relevant national regulations, the project has completed the main construction tasks according to the design requirements. Application report for completion acceptance. The project investment is reasonable, the completion data is fully prepared, the construction quality of the project passes the quality inspection of the quality supervision station, and the project quality inspection and evaluation report is issued. The project quality is qualified and has formal acceptance conditions.

Three. Suggested acceptance time, place and participating units:

According to the completion of the project and the requirements of relevant departments of provinces and cities, it is suggested that the project completion acceptance of building xx 1 and 2# in xx county should be carried out on xx, xx, with the participation of the project legal person, design, supervision, construction, quality supervision and other relevant units.

To sum up, the project of xx Home 1 and 2# Building in xx County has met the completion acceptance conditions, so please arrange formal acceptance by the superior department.

Applicant:

Date of application:

;