Emergency plan for wind-proof and rainstorm of property

Emergency plan for wind-proof and rainstorm of property

Accidents will inevitably occur in daily study, work and life. In order to reduce the consequences of accidents, it is usually necessary to prepare a complete emergency plan in advance. What are the format and requirements of the emergency plan? The following is my emergency plan for property storm prevention, hoping to help everyone.

Emergency plan for property storm 1 1. purpose

In order to effectively and orderly carry out typhoon and rainstorm prevention work and minimize the losses caused by disasters, this plan is formulated.

Step 2 organize

The company set up a leading group for typhoon and rainstorm prevention, with the manager and deputy manager as the team leader and deputy team leader, and the members of the group are composed of the heads of various departments of the company.

3. Emergency response

3. 1 The typhoon and rainstorm prevention team should pay close attention to the weather forecast. When the meteorological department issues a yellow and above typhoon warning signal or a yellow and above rainstorm warning signal, start the company's typhoon and rainstorm prevention plan.

3.2 After the plan is started, the leader or deputy leader of the typhoon and rainstorm prevention leading group will go to the scene to command. If it is impossible to go to the site for some reason, a special person shall be appointed for on-site coordination and command. Company employees will not go out unless there are special circumstances, and they are always on standby to participate in emergency rescue and disaster relief.

3.3 After the plan is launched, the main tasks that all relevant departments should do are:

First, the property department:

Post the warning notice of typhoon and rainstorm, and inform the manufacturers and households in the area to cooperate with safety precautions.

B, engineering department:

(1) Check whether all drainage pipes, drains and drains are in normal use. If there is any blockage, immediately arrange dredging to ensure the smooth drainage pipeline.

(2) Check whether the window glass, signs and billboards on each floor of the factory building are firm and reinforce the weak ones.

(3) Cut off the dangerous outdoor power supply, check whether the lines and electrical equipment are damaged and ensure safety before resuming power supply.

(4) In case of power failure, the main electrical equipment shall be shut down immediately to prevent it from being damaged by strong pulse when power supply is restored.

(5) When the power supply and distribution room is flooded, the main power supply must be cut off immediately, and the power supply office should ask for help if necessary. After flooding, the equipment and facilities must be dried and overhauled, and the insulation measurement meets the requirements before they can be put into use.

(6) During storms and rainstorms, cargo elevators and passenger elevators stop running without special circumstances, so as to avoid people being trapped due to sudden power failure.

(7) During the rainstorm, strengthen the patrol of the water supply system, check whether sewage enters the overflow port, and immediately stop all production and domestic water supply pumps (including self-prepared wells) if found.

(8) If typhoon accompanied by rainstorm causes flood, we will cooperate with other departments for dredging and drainage according to the arrangement.

C. Security sector

(1) Check whether there are falling hazards in the factory building, the rooftop of the complex building and the balconies of all households, and move the exposed flowerpots on the balcony and other items that may be blown away by the wind indoors; Used for guardrails, awnings, clothes poles, doors and windows, boards, scaffolding, temporary buildings, etc. Found loose and easily blown down by the wind; Immediately notify the manufacturer, shopping mall or engineering department for treatment and reinforcement.

(2) According to the customs and rain conditions, increase the security guards on duty as appropriate, and strengthen indoor patrol when the storm comes to prevent the occurrence of crimes associated with disasters; Do a good job in traffic guidance.

(3) When there is a flood in the industrial area, set up relevant warning signs in the deep water area to guide the waders to go from the shallow water area.

3.2 Requirements and Precautions

Typhoon prevention work should be people-oriented, safety first, prevention first, and full rescue.

The windproof plan is started, and the heads of all departments make windproof work arrangements according to the division of labor. Immediately report the danger to the on-site commanding and dispatching personnel, and strictly obey the command of the on-site commanding and dispatching personnel.

If it is found that the temporary buildings on the open space are unstable, dangerous and unable to be reinforced, the residents should be evacuated and resettled.

If the storm causes the shops and open space manufacturers in front of the industrial zone to be flooded, the engineering department should immediately cut off their power supply.

In case of flood, it is not allowed to open the manhole cover for drainage without safety measures, so as to absolutely ensure the safety of personnel.

The company will increase the number of personnel on duty according to the weather forecast, and the personnel on duty in all departments should stick to their posts.

After the typhoon and rainstorm, it is necessary to clean up the disaster site, count and record the losses and learn lessons. In case of tube explosion, power failure, personal injury and other accidents, contact relevant functional departments immediately.

Emergency plan for property storm prevention 2 (1) Division of responsibilities of each post

L, the security department to do a good job of rainstorm emergency information transmission, resource allocation and related logistics.

2, engineering maintenance department is responsible for water supply and drainage, power supply, air conditioning, elevators and other mechanical and electrical equipment failure and emergency treatment.

3. The public security fire department of the property service company is responsible for the "three defenses" emergency treatment, security and voluntary fire fighting, and is also responsible for emergency rescue and disaster relief.

4. The cleaning and greening department is responsible for greening, environmental disaster protection and post-disaster recovery.

(2) Typhoon prevention, flood control and emergency treatment

1. After receiving the typhoon or rainstorm warning signal, the property service company should immediately mobilize urgently, and all departments are in a state of war. At the same time, a command team manager should be set up as the chief commander, and the heads of various departments should be members of the temporary headquarters of the three defenses. Relevant personnel should implement a 24-hour duty system and prepare for flood control and disaster relief.

2. Before the typhoon or rainstorm comes, measures should be taken to prevent wind and prevent water immersion, such as: do emergency work for wind and prevent water immersion, close doors and windows, and check and clean up flood drainage equipment, facilities, advertising signs, flower pots, etc.

(1) Check whether all doors and windows, especially double-door glass doors, are adequately protected and stable.

(2) Fix all items that are easy to loosen, especially those located on the roof and balcony. Some items that are easily blown down by the wind, such as flower pots, should be moved indoors or tied tightly.

(3) Check all drainage pipes, manholes, rainwater pipes, etc. , and remove the garbage, silt and sundries that may cause siltation.

(4) Ensure that all emergency appliances are available at any time, such as sandbags, raincoats, helmets, water boots, ropes, standby lighting, square timber (for fixing glass doors), etc.

(5) Check whether the drainage pump system is normal and unobstructed.

(6) Check whether the power generation system and its oil supply device are normal, and try to develop the motor set according to regulations.

(7) Turn off the neon power.

(8) Whether the intelligent system equipment runs normally.

(9) After the inspection, solve the problems found in time, and report to the leader immediately if there are any problems that cannot be handled.

3. In case of typhoon and rainstorm, the security officer on duty will strengthen the patrol of key areas and parts such as windproof and waterproof immersion, and check the condition of doors and windows. If there is broken window glass, they will rush to the scene as quickly as possible and temporarily cover it with plates. Maintenance personnel of the engineering department are on standby, and management service personnel at all levels stick to their posts. If there are complaints about equipment failure and potential accidents are found, emergency measures should be taken to solve them in time.

4, personnel at all levels to assist maintenance technicians to do a good job of flood drainage and water drainage.

5, in the typhoon, flood and other natural disasters and accidents, to prevent the occurrence of criminal cases.

(3) Post-disaster treatment

After the typhoon and thunderstorm, the engineering department organized maintenance personnel to inspect the equipment and facilities under its jurisdiction, and repaired them in time if any damage was found. The cleaning department inspected and restored the damaged trees in an attempt to minimize the impact of the disaster. The property manager reports the disaster and losses to the general manager of the company in time.

;