Job Recruitment Website - Property management - The latest version of the property renovation agreement

The latest version of the property renovation agreement

Name of Party A: _ _ _ _ _ _ Name of Party B: _ _ _ _ _ _ _ _ _ _

Party A's ID card: _ _ _ _ _ _ _ Party B's ID card: _ _ _ _ _ _ _ _ _

Party A's telephone number: _ _ _ _ _ _ _ Party B's telephone number: _ _ _ _ _ _ _ _ _ Party B's telephone number: _

Address of Party A: _ _ _ _ _ _ _ _ Address of Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Party A's property management unit, and Party B is the unit or individual entrusted by the purchaser or user of the residential unit property in the residential area for decoration. Now, Party A and Party B have entered into this agreement through equal consultation.

The first decoration application and approval

1. Before renovation, Party B shall submit a written renovation application to Party A and fill in relevant materials; Party B shall provide Party A with the following materials:

(1) Copy of the business license and qualification certificate of the construction unit (with official seal). Entrust individuals, need to provide decoration power of attorney.

(2) Decoration design drawings (including floor plan, concealed engineering drawings and mechanical and electrical engineering construction drawings) with a scale not less than 1: 100 or copies of the above drawings.

(3) Party B shall provide Party A with a list of on-site construction personnel, a copy of ID card and two recent 1 inch photos.

(4) Certificates and photocopies of special jobs such as electricians and welders in the decoration team.

2. After receiving Party B's application, Party A shall review the materials provided by Party B, complete the review within 7 working days after receiving the materials, and notify Party B of the review results. After passing the examination, Party A will issue a construction permit to Party B. Party B shall start the renovation according to the permit time, and at the same time, post the permit in an obvious position on the renovation site for Party A's inspection.

3. When Party A deems it necessary to modify or resubmit the information provided by Party B, Party B shall modify or resubmit it and submit the modified information to Party A for final review.

4. Party B shall not change the materials audited by Party A without authorization. If it is necessary to modify or change, it shall notify Party A in writing in advance and submit the modified materials to Party A for review.

5. If Party B starts construction without submitting an application for renovation, or starts construction without Party A's permission, Party A has the right to order it to stop, and all consequences arising therefrom shall be borne by Party B. ..

The second pass

1. In order to ensure the smooth progress of Party B's renovation work, Party B needs to apply for site passes for the construction workers it employs. Party A has the right to prevent people from entering the community if they fail to apply for the pass, lose it or lend it to others, and all the consequences arising therefrom shall be borne by Party B. ..

2. If Party A finds that the construction workers employed by Party B have violated the law or do not conform to the regulations of the community management, Party A has the right to clear the construction workers out of the community, and all the consequences arising therefrom shall be borne by Party B. Article 3 After the renovation is completed, Party B shall return all the passes it has handled to Party A in time, and Party A will return the temporary pass deposit after verification.

Article 3 Decoration deposit

1. In order to ensure the interests of the owner and the safety of the building structure and supporting equipment, Party A charges Party B a deposit of 5,000 yuan per household.

2. Party B pays the garbage cleaning fee: 20 yuan/nature room; Management fee (including equipment use fee) is charged at 15 yuan/day, from the time when the construction permit is obtained after examination and approval to the time when the site is cleared after acceptance.

3. After the renovation is completed and accepted by Party A, the actual expenses will be deducted (the fees will be stopped on the day when Party A passes the acceptance), and the final payment will be returned according to the regulations for 3 months without quality problems. If the acceptance is unqualified, Party A will continue to charge Party B the relevant expenses during the rectification period.

Article 4 Preventive measures

1, building civil structure decoration:

(1) Doors and windows shall not be altered to keep the appearance of buildings and houses beautiful and unified.

(2) It is forbidden to dismantle and destroy the original structure, load-bearing wall, counterweight wall and floor slab. It is not allowed to pick slots and make holes in the main structure without authorization, and it is not allowed to cut through partition boards on the ground, roof and balcony.

(3) The thickness of indoor ground decoration stone shall not exceed 1.2cm, and the total thickness of ground decoration shall not exceed 3cm. Before laying floor tiles according to the construction progress, it should be reported to the engineering department of the property management company for inspection and approval.

(4) Don't destroy the waterproof layer of the original bathroom and laundry room without authorization. If there is any damage, waterproof treatment must be redone, and 24-hour closed water test should be conducted. The property engineering department can continue the construction only after passing the inspection.

(5) The wooden materials used for Party B's decoration shall be treated with fire prevention, flame retardant and anti-corrosion.

(6) Rooms without waterproof requirements shall not be set as bathrooms and kitchens.

(7) The kitchen should have a door and should not be made into an open kitchen.

2, water, heating, gas pipeline facilities decoration:

(1) It is forbidden to change indoor heating pipeline facilities, install radiators or dismantle them. When installing the heating cover, be sure to leave a manhole with a length and width of not less than 400mm to facilitate future maintenance, otherwise the consequences will be at your own risk.

(2) It is forbidden to dismantle and change the indoor water meter, and the original design pipeline shall not be dismantled and changed without authorization.

(3) It is forbidden to change or block gas pipelines and instrument facilities.

(4) A distance of more than 100mm should be left around all indoor pipe joints and interfaces, and inspection ports with a length and width of not less than 400mm must be left in accordance with regulations for future maintenance and inspection.

(5) The gas pipeline shall not be closed without authorization.

(6) The gas water heater must be installed with forced exhaust, and its exhaust pipe shall not exceed the outer wall 10cm, and shall not be discharged into the flue or tube well.

(7) If there are any changes to the bathroom and kitchen walls, the construction plan should be made according to the waterproof standard, and waterproof should be done again.

3. Decoration of power distribution and weak current signal facilities:

(1) The distribution system layout must be constructed according to the approved scheme and drawings, and the construction personnel responsible for this work must have the electrician operation certificate issued by the Labor Bureau (a copy of the certificate of special type of work is filed in the property management company).

(2) It is forbidden to destroy the original indoor wiring circuit, and it is forbidden to directly bury high-voltage and low-voltage lines. It must be laid in accordance with the construction specifications. In case of violation, Party B shall be responsible for all the consequences.

(3) The original design of distribution control and metering instruments shall not be added or modified without authorization. The concealed construction parts: lighting, sockets and air conditioning sockets must be controlled in one direction according to the original design load.

(4) It is forbidden to dismantle and change the original design of TV, intercom and communication network wiring. If you change it without authorization, you will be at your own risk.

(5) The bathroom installation of Yuba must be rewired from the socket, and the original reserved lamp line cannot be used. Electrical appliances exceeding the original design load shall not be used indoors.

4, building exterior wall decoration:

(1) It is forbidden to tear down and change external windows, fire windows and balconies, and guardrail shall not be installed without authorization.

(2) It is strictly prohibited to illegally build or hang other items on the platform outside the door. The offender's property company has the right to demand its unconditional demolition at its own risk.

(3) The outdoor unit of the air conditioner must be installed at the designated position, and the condensate drain pipe must be connected with the air conditioner condensate pipe or fixed on the wall at one side of the outer window.

5. Decorate the construction site

(1) Handling of decoration materials: Party B shall apply for elevator service time in advance, and arrange the handling time as planned, so as not to damage public facilities and equipment such as elevators, public area walls and stairwell walls. When handling building materials, it must be sealed and leak-free, and the handling route must be cleaned up in time after handling.

(2) Cleaning and removal of decoration garbage: Party B must abide by Party A's regulations, transport sealed bagged garbage to the designated place at the designated time, and clean up the sundries in front of the door at any time. It is forbidden to pile up building materials and decoration garbage in public areas, and it is forbidden to dump debris and paint into sewer pipes.

(3) Construction personnel: Party B's construction personnel shall wear neat clothes and traffic signs, and enter through the designated passage; It is forbidden to wander in the non-working area of this community, and it is not allowed to damage the public facilities and equipment of the community and the finances of others; Strictly abide by the management regulations and keep the walls of public areas and corridors clean and tidy.

(4) Decoration construction time:

① Working hours: 8