Please memorize the 20 steps of the new house decoration process and steps!

For the owners who are in contact with the renovation for the first time, the renovation of the new house is definitely a big test. The process of decoration is so complicated that many small details that need attention will make many novice decorators panic. In fact, whatever you do, the most important thing is to grasp the backbone and key points first. Today, Bunny will give you a detailed introduction to the whole renovation process and steps of the new house, so that the owners can rest assured.

Part 1: preliminary design and demolition? Woodworking tile for hydropower transformation

& lt& lt& lt& lt& gt Click here to apply for renovation insurance for free to avoid the renovation trap >>& gt Owners should be excited to start building new houses! Excited, I don't know how to start. Never mind, Bian Xiao will tell you step by step.

1, preliminary design

The design of a new house should be based on one's living habits, and one's room should be measured in detail. This step must not be lazy, it is best to measure it yourself. The measurement mainly includes: defining the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area, and define the main wall size. Especially it is necessary to design the wall size of furniture in the future.

2. Demolition and transformation of the main body

When entering the construction stage, the main body removal is the first project, which mainly includes wall removal, wall building, wall skin removal, heating removal, plastic steel window replacement and so on.

3. Hydropower transformation

At this time, the demolition and reconstruction of the main structure should be basically completed, and hydropower reconstruction can be carried out. Between the hydropower transformation and the main body demolition, the first test of the cabinet should also be carried out. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers. It mainly includes: whether the position of the lampblack machine socket affects the installation of the lampblack machine in the future; See if the location of the water meter is appropriate; See if the location of the water inlet is convenient for installing the sink in the future. For the first measurement of cabinets, slightly experienced owners can do it themselves. After the waterway reconstruction is completed, it is best to waterproof the bathroom immediately, and the kitchen generally does not need waterproofing.

4. Woodworking

Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: wood-tile-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement.

5. Gaiwa

In the process of "bricklayer's second child" operation, it also involves three links of installation: the installation of threshold stone and marble windowsill. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. Therefore, you should buy a floor drain as soon as possible. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood. After the kitchen wall and floor tiles are pasted and the range hood is installed, the second measurement of the cabinet can be carried out.

Part II: Paint the kitchen and bathroom ceilings? Installation work has priority.

After the early demolition, carpentry and other work, large-scale construction work will be carried out. For example, painting the walls and installing the ceiling of cabinets. , need to be carefully handled to avoid rework in the future,

1, paint the wall

The "Third Oil Worker" enters the site, mainly completing the basic treatment of the wall surface, painting the top coat and painting the furniture that the "carpenter" hits. If you are going to paste wallpaper, just let the "third oil worker" do the basic treatment on the wall where you intend to paste wallpaper.

2, kitchen and bathroom ceiling

As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best to install the kitchen ceiling lamp and exhaust fan (Yuba) at the same time, or leave thread ends and holes.

3, cabinet installation

After the ceiling is completed, you can make an appointment to install the cabinet at home. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

4, wooden door installation

The second day after the cabinet was installed, as early as more than a month ago, after the wooden door was measured, it can be installed now. When installing the door, the hinge, door lock and floor suction should be installed at the same time. Related hardware should be prepared in advance. If you want the wooden door manufacturer to install the window cover and pass it, you should also measure it when the wooden door manufacturer measures it, and install it at the same time on the day when the wooden door is installed. At the same time, you should consider putting the installation time of marble windowsill backward after the window cover is installed.

5. Floor installation

The floor can be installed the day after the wooden door is installed. Pay attention to the following problems when installing the floor: 1. Before installing the floor, it is best to let the manufacturer come to investigate whether the ground needs leveling or partial leveling. At the same time, the floor paved at home should also be cleaned to ensure the dryness of the floor, so do not use water during the cleaning process. 2. When the floor is installed, if possible, the floor must be cut in the corridor. Cutting the floor indoors has serious pollution to the wall.

Part III: Installation of wallpaper paving socket? Hardware and sanitary ware are indispensable

After the basic work of the wall and the ground is finished, it is necessary to spread wallpaper and install household appliances and hardware. This part is more complicated and needs a lot of patience. The owner should always tell the decoration workers to be careful.

1, wallpaper paving

The day after the floor is installed, you can make an appointment to paste wallpaper when the home is cleaned up. If possible, the floor should be protected on the day of wallpaper pasting. Before pasting the wallpaper, try to make the wall "nothing".

2. Installation of radiator

The day after the wallpaper is laid, you can hang the radiator on the wall in a down-to-earth manner. Wooden door-floor-wallpaper-radiator, which is recognized as the correct installation sequence. Install the wooden door first to ensure that the skirting line of the floor can be closely connected with the door cover of the wooden door; After the wallpaper was installed, it was mainly because the floor was dirty and dusty, which seriously polluted the wallpaper. Here I use the principle of "whoever is dirty first" again. Finally, install the radiator, because the radiator can only be installed after the wallpaper is laid on the wall.

3, switch socket installation

Owners should have a detailed understanding or record of the number and location of switch sockets in various natural rooms at home, especially wallpaper pasting. Sometimes the wallpaper worker is irresponsible, and the wallpaper is laid at once, and there is no need for wallpaper knife to mark the position of your switch socket. Therefore, it is still necessary for the owners to understand themselves.

4, lamps and lanterns installation

Install the lights. There is nothing to say. After the lights were installed, the house lit up, saying goodbye to the dazzling light of 100 watt incandescent bulbs during decoration-it felt really good.

5, hardware sanitary ware installation

Before buying pipe fittings, bathroom fittings, toilets, clothes hangers, etc. , are all installed. After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive", really "alive".

Part IV: Does the furniture enter the site after installation? Thoroughly clean the accessories and go on stage.

Most of the installation work is coming to an end, so it's time for cleaning and home decoration. In order to be clean, it is suggested that the owner pay more attention to the corner area and try not to leave any dead ends.

1, curtain rod installation

The installation of curtain rod marks the basic end of home improvement.

2, development and cleaning

Don't install curtains before cleaning. When cleaning, don't have furniture and unnecessary household appliances at home, leave as many "planes" as possible, so that the cleaning can be thorough.

3, furniture comes into play

As for the purchase time of furniture, my suggestion is that it should be completed after the renovation of water circuit at the earliest, so as to get a general understanding of the basic size range of furniture.

4. Installation of household appliances

At this time, it's time for home appliances to enter the market. It's time to install and prepare to move in!

5, home accessories

Home decoration, the last step of home improvement, has changed from decoration to decoration, including the installation of curtains. As for buying curtains, it is best to book furniture first to avoid style conflict. Home accessories also include buying some green plants, hanging murals and decorating handicrafts ... in short, you can play freely after staying.

The above is the whole process of decoration, please read it carefully for the first time. Although the decoration is cumbersome, step by step, or according to the actual situation of your home? With a little adjustment, there won't be too many mistakes and delays. With this article, has the owner of the first decoration been reassured? In order to make our decoration more secure, in addition to learning some necessary decoration knowledge, we can also apply for Tuba rabbit decoration insurance, which provides comprehensive decoration quality inspection services and can realize one-on-one decoration consultants to help owners prevent decoration from being tricky. Come and click to learn!