Job Recruitment Website - Property management - Decoration and design cooperation agreement
Decoration and design cooperation agreement
Party B:
Party A's responsibilities
1. Party A provides customer resources or design projects for Party B.
2. Party A shall pay the design fee on schedule. If Party A fails to pay the design fee on time during the design or construction period, Party B has the right not to follow up the project.
3. Party A shall put forward clear written opinions on the drawings submitted by Party B, and sign the phased drawings for confirmation.
4. Party A shall fully respect the work achievements of Party B and shall not arbitrarily change the signed design and construction drawings. If it is necessary to relocate due to special reasons, Party B shall be informed in advance, and the two parties shall formulate a modification plan after consultation. In case of any change, Party B shall be paid the design fee for this part of the project.
Party B's responsibilities:
1. Party B shall submit plans and drawings on time according to the progress of drawings. If the drawing schedule is delayed due to Party B's unilateral reasons, Party B shall pay 0. 1% of the total contract price for each day of delay. Pay liquidated damages to Party A. ..
2. Party B shall make design suggestions to Party A due diligence and try its best to do this design well.
3. During the construction, Party B shall closely cooperate with the construction, and be responsible for supervising the quality of work and providing technical guidance.
4. The construction scheme shall not be changed during the construction process, and the materials and construction level standards of the construction team shall be strictly selected to make the project achieve the design effect.
Cooperation mode 1:
After Party A provides design projects or customer resources, Party B will follow up and design with its own independent resources. The design fee is charged according to the basic price of the design project entrusted by Party A, which is about 60 yuan /m2 (charged to Party A), and the external customers are charged according to the actual project design fee (charged to customers). Party B and Party A share the profits in proportion (70% for Party B and 30% for Party A). During this period, Party A is obliged to provide certain company qualifications and other resources to assist Party B to complete the design project (mainly for external customers).
Cooperation mode 2:
Under the premise of cooperation mode 1, Party B is affiliated to work in Party A's company, and jointly established the company with * * *, which makes the company have greater external influence. Party A provides Party B with necessary office conditions, and Party B pays certain ancillary expenses to Party A.. Independent internal management and unified external management.
The following contents are supplements to this agreement:
Design scope and content:
1. Interior decoration scope: scheme design of main space renderings, design of main space facades and construction drawings, and design of drawings of civil engineering and hydropower systems.
2. It does not include professional design such as indoor fire protection system, air conditioning and ventilation system, kitchen equipment system, professional water circulation purification system, audio broadcasting and other weak current systems.
3. Reconstruction of civil engineering or metal structure design and illegal construction are not included.
Design, construction tracking and supervision stage:
The first stage: scheme design
Party B shall consult Party A, make clear the project parameters, Party A's objectives and other requirements, study the project style design concept, and preliminarily determine the plane preliminary scheme. The functional layout and the positioning content of the theme style of the project space need to be signed by the owner.
A. Draw preliminary floor plan, hand-drawn schematic diagram and design creative copy to express interior design concept.
B. According to the plan signed by Party A. ..
C, the time is about the effective working day.
The second stage: scheme deepening design stage, effect diagram design.
A, according to the design task book signed by Party A, carry out plane deepening design and renderings design.
B, the time is about a valid working day.
C, the main space renderings (_ _).
The final decision must be signed by the owner.
The third stage: the construction drawing stage
A. According to the scheme determined by both parties, carry out detailed design and make drawings.
B, the time is about _ _ effective working days.
C. Drawing contents: plan, ceiling, masonry, floor, switch socket positioning; The final decision must be signed and confirmed by the owner, and the drawings in the further design stage of the scheme shall be submitted on A3 paper.
D the final construction drawing shall be signed by the owner for confirmation.
The fourth stage: construction tracking and supervision stage:
A. Party B shall provide Party A with a complete set of construction drawings in triplicate; On the premise of meeting the project design standards, Party B has the obligation to assist Party A in reviewing the budget, construction progress and construction process of the construction unit and provide relevant suggestions to ensure the smooth progress of the project.
B, according to the actual construction situation, provide phased design guidance;
C. After the completion of the hard decoration project, sanitation and cleaning, and after all furniture ornaments enter the site, provide a soft-fitting on-site decoration guidance service, with the participation of the chief designer and the soft-fitting designer.
Design fee and payment method:
1, design cost:
1. Both parties negotiate to complete all the work within the scope of this design contract, with a total price of RMB 10000 yuan, equivalent to RMB/m2. If there is any increase or decrease in the design process, another agreement shall be signed.
2. The above fees do not include Stamp charge with design qualification, management fees and taxes.
3. The above design fee does not include any form of consumption delay deposit.
2. Payment method:
(1). After the contract is signed, Party A shall pay% of the total design fee to Party B, that is, _ _ _ ten thousand yuan;
(2) After Party B completes the second-stage design (renderings), Party A shall pay Party B% of the total design fee, namely _ _ ten thousand yuan;
(3) After completing the third design stage, Party B shall provide Party A with a complete set of construction drawings in triplicate, and Party A shall pay Party B% of the total design fee, that is, RMB _ _ _ _.
(4) Within 65,438+00 working days after the completion of the project, Party A shall pay _ _% of the total design fee to Party B, namely _ _ ten thousand yuan.
Party A: Party B:
Signature (seal) of legal representative: Signature (seal) of legal representative:
- Related articles
- Where is the seal address of Taizhou Jiulong Hexi?
- Living alone for a long time does have many disadvantages, and there is less communication with classmates. A lot of things will be your own subjective opinion, which will produce some things.
- Dai's property
- What is the address of Wang Ting's home in Jiaxing Carson Satellite City?
- Teaching plan for large classes in urban night kindergartens
- I am a flood shooter who goes out to work. I have nothing to do during the Spring Festival. I want to be a security guard at Carrefour Shehong Store for two months. Is it okay? How much is it a month?
- Where is Shangqing Bay in Tianjin Wuqing Mansion?
- How about changing jobs from a big chemical company for ten years to a small pharmaceutical company?
- What about Shanghai Jiaxiu Culture Communication Co., Ltd.?
- How about Guangnan Shanghai New Century Experimental Middle School?