Classic renovation contract protocol sample 1
Employer (hereinafter referred to as Party A)
Contractor (hereinafter referred to as Party B) (person in charge of construction engineering team)
ID card: Contact information:
Home address:
Article 1 General situation of the project
1, decorate the construction site:
2. Building structure: brick-concrete structure; _ _ _ _ _ _ _ _ suite, with a construction area of about _ _ square meters.
3. Signing method:
4. Decoration construction content: all the items that should be included in other decoration projects, such as hydropower renovation project, wall renovation, wall demolition, wall and ground demolition, floor tile paving, ceiling installation, door and window demolition, water pipe wrapping, top and wall coating, kitchen utensils, sanitary ware, lamps installation, partition making and handling. (Supplementary Agreement on Procurement and Handling Works: Party B shall assist Party A in all procurement, and Party A shall do its best to ask the decoration materials supplier to deliver the decoration materials to Party A's house free of charge during the procurement process. However, if the material supplier insists on delivering the goods only to the downstairs of Party A's residence or refuses to deliver the goods, Party B shall be responsible for transporting the decoration materials to the house or the goods to the construction site).
5. Total price: RMB _ _ _ _ (including domestic garbage cleaning fee and material handling fee). Party B has taken away the refrigerator and radiator of Party A, with a value of RMB _ _ _ _ _ _ _ _ _. The above total price is determined according to Party B's on-the-spot investigation of Party A's house and preliminary understanding of the project to be completed. The total price includes all the labor involved in the renovation project undertaken by Party B. ..
6. Construction period: from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 2 Agreement on Party B's Responsibility
1. Party B (that is, Party B) shall assume the responsibility of the person in charge of the construction team during the renovation, and be responsible for the quality and time limit for the renovation project. Party B shall be fully responsible for contacting Party A, providing material requirements, and managing the quality of on-site decoration and construction personnel. In the process of construction, if there are quality problems and various losses of Party A that should be borne by the construction team, Party A will only compensate Party B (i.e.).
2. During the decoration process, Party B shall ensure that the whole construction and management are carried out on site (except for accompanying Party A to purchase materials). In case of special circumstances, it is necessary to negotiate with Party A and get approval)
3. The person in charge of Party B is responsible for organizing the decoration personnel to participate in the decoration projects stipulated in this contract. If Party A has doubts about the construction level of Party B's decoration personnel, it may require Party B to replace them unconditionally.
Article 3 Material Supply Agreement
1. All decoration materials for this project are provided by Party A, and the decoration construction equipment and tools are provided by Party B. ..
2. The materials that Party A is responsible for purchasing and supplying shall be qualified products that meet the design requirements, and shall be supplied to the site on time. Party B must assist Party A in handling the acceptance formalities. If there is any quality problem or specification difference in the materials and equipment supplied by Party A, Party B shall promptly raise it with Party A; if Party A still says that it will be used, Party A shall bear the responsibility for the engineering losses. After the materials supplied by Party A arrive at the site, they shall be accepted by both parties, and Party B shall be responsible for keeping them and organizing the construction. Party B will be responsible for compensating the material losses caused by improper storage or improper construction technology.
3. Party B must be responsible for carrying materials upstairs (except tiles).
4. In order to ensure the normal progress of the project, Party B must submit the list of materials to be purchased in the next process to Party A at least one week in advance, and assist Party A in purchasing materials so that Party A can purchase materials on weekends. Party A shall provide the materials required by Party B on time. Party A shall be responsible for the delay in the construction period caused by Party A's delay in providing materials .. Party B must also provide roughly accurate (+/-5- 10%) quantities of required materials. The transportation expenses of material re-purchase or return caused by excessive material estimation error of Party B shall be borne by Party B, or Party B shall be responsible for transportation and return to the supplier.
5. Decorative materials and equipment purchased and supplied by Party A shall be used for residential decoration agreed in this agreement, and Party B shall not use them for other purposes without Party A's consent ... If Party B violates this regulation, Party B shall compensate Party A at twice the price of the misappropriated materials and equipment.
Article 4 Agreement on Project Quality and Acceptance
1, this project implements local standards and quality evaluation acceptance standards such as Technical Specification for Residential Building Decoration Engineering and Acceptance Standard for Residential Decoration formulated by the municipal construction administrative department.
2. If the quality of materials and equipment provided by Party A is not up to standard, which will affect the project quality, the cost of rework shall be borne by Party A, and the construction period shall be postponed.
3. If the quality accident is caused by Party B, Party B shall bear the rework fee and material loss.
4. In the process of construction, Party A shall contact Party B in advance, and put forward the design modification opinions and increase or decrease projects before the project construction.
5. If some processes are installed free of charge by Party A's material supplier or arranged by other units (such as windows, fire doors of cabinets, countertops, etc.). ), Party A shall arrange the time in advance and inform Party B, and Party B shall cooperate to avoid the delay of the overall construction period.
6. Project Acceptance-Party A and Party B shall handle the acceptance procedures for concealed works and intermediate works in time.
7. Project completion: Party B shall notify Party A of acceptance two days in advance, and Party A shall organize acceptance within three days after receiving the notice, and go through the written acceptance confirmation procedures. If Party A fails to organize the acceptance within the specified time, it shall notify Party B in time and set another acceptance date. If it passes the completion acceptance, Party A shall acknowledge the original completion date and bear Party B's storage expenses and other related expenses.
8. The warranty period of this project is one year, counting from the date of completion acceptance confirmation. During the warranty period, if there are quality problems caused by Party B's improper construction, Party B will unconditionally carry out maintenance and bear the corresponding material costs.
Article 5 Safety Production and Fire Prevention Agreement
1. According to the construction requirements provided by Party A (see Article 3 above) and through consultation with Party B, the construction site shall meet the requirements of fire prevention and accident prevention, mainly including unblocked and qualified electrical lines, gas pipelines, tap water and other pipelines. During the construction process, Party B shall take necessary safety protection and fire control measures to ensure the safety of operators and surrounding residents, abide by the decoration guidance of the property management department, and prevent accidents such as pipeline blockage, water leakage, power failure and damage to the houses and articles of surrounding residents. In case of the above situation, Party B shall be responsible for maintenance and compensation.
2. During the construction process, if there are changes in the building structure, changes in the removal of load-bearing walls, and increased floor load, Party A shall propose to negotiate with the property management department and carry out the construction after confirmation.
3. Party B shall pay attention to the safety of gas use, ensure the safety guarantee of climbing construction, and remind the construction personnel to pay attention to safety. Party B shall take full responsibility for any accident.
Article 6 Agreement on Project Price and Settlement
Payment method of project funds: Upon mutual agreement, the progress of project funds payment is as follows:
After the signing of this agreement, the completion of hydropower transformation and acceptance, Party A shall pay Party B RMB only.
After all tiles are laid and accepted, Party A shall pay RMB Yuan only to Party B..
After all projects are completed and accepted, Party A shall pay Party B RMB Yuan only.
The remaining _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ refers to
Total yuan only.
Article 7 Other matters
1, Party A's work:
(1) Party A shall carry out on-site kang bottom for Party B on the day of commencement. Provide Party B with necessary conditions such as construction water and electricity, and explain matters needing attention.
(2) Do a good job in the coordination of neighborhood relations affected by the temporary use of public parts during construction.
2. Party B's work:
(1) Participate in the on-site Kangdi convened by Party A. ..
(2) Be fully responsible for the performance of this Agreement. Organize the construction as required, and complete the construction task on time with good quality and quantity. Under the condition of ensuring the quality of the project, if there is any personnel change, Party B shall notify Party A in advance and obtain Party A's consent.
Party A (signature) and Party B (signature)
Address: Address:
Tel: Tel:
ID number: ID number:
Date of signature: year month day.
Classic renovation contract Protocol Sample 2
Owner (hereinafter referred to as Party A): _ _ _ _ Tel: _ _ _ _ _ _ _
Construction Team (hereinafter referred to as Party B): _ _ _ _ _ Tel: _ _ _ _ _ _ _ _
Project: bedroom decoration
After many friendly consultations between Party A and Party B, Party A decided to entrust the right to decorate the living room to Party B. In order to ensure the smooth progress of the project, this contract (including its annexes and all supplementary contracts) is specially signed in accordance with relevant national laws and regulations for * * * to abide by.
I. Overview of the Project
1, project address:
2. Living room specifications: room floor (style), room, hall, kitchen and bathroom.
Total: square meters of construction area;
3. Construction content: For details, please refer to Annex (1) Detailed Drawing of Home Decoration Construction Project and House Type Construction Drawing.
4. Entrustment method:
Second, the project price
Package clearing fee: RMB, in words:
Three. terms of payment
1, the construction team enters the site, and the living expenses are prepaid: RMB,
2, plumber completed, salary yuan.
3. After carpentry is completed, the salary is RMB.
4. Pay RMB when the bricklayer finishes.
5, project completion, pay RMB,
6. In the process of project construction, if there is any increase or decrease of the project or need to be changed, the increase or decrease of the project price shall be settled after the completion of the increase or decrease of the project through consultation between Party A and Party B. ..
7. The project quality warranty is in Jin Yuan, which shall be paid after 1 year from the date of completion.
8. If all the acceptance items meet Party A's acceptance standards and are satisfactory when the project is completed, Party A will pay Party B an additional project award fund.
Fourth, design.
1. If Party A has drawings, it shall provide Party B with a set of drawings and be responsible for disclosure;
2. If Party A has no drawings, it shall clearly explain the requirements to Party B, and Party B shall draw a sketch for Party A's approval before construction.
Verb (abbreviation of verb) material
1. Party B shall provide Party A with a list of materials to be purchased three days in advance, and Party A shall timely purchase materials for use by the construction team within four days. Both parties shall bear their respective responsibilities for the delay in construction period and economic losses.
2. All building materials provided by Party A shall be kept by Party B after acceptance, and shall not be used for other purposes without Party A's consent; If Party B uses it for other purposes or keeps it improperly, it shall compensate Party A at twice the actual price of the materials.
3. Without the consent of Party A, Party B shall not purchase materials by itself; If it has been purchased, Party A has the right to refuse to use it unconditionally and refuse to pay for the materials.
4. If Party B needs to purchase some materials, Party B shall purchase them at the building materials supply point designated by Party A and issue an official invoice.
5. Party B shall check and accept the quality of building materials purchased by Party A, and raise quality problems with Party A in time, and have the right to refuse to use them. If Party A insists on using it, it shall request Party B in writing and bear the losses caused by the quality of the materials.
6. Party B shall assist Party A to receive the goods and check the accuracy of the quantity and accessories.
7. Party B shall properly keep the materials and prohibit other personnel from entering the site.
8. Without Party A's permission, Party B shall not take any building materials out of the house. If such a phenomenon is found, it will be deducted from the labor cost by doubling the material price.
Six, time limit for a project and project quality inspection and acceptance
1. The construction period is days, from month to month. If the construction period is delayed due to Party A's reasons, the construction period will be postponed; If the construction period is delayed due to Party B's factors, Party A may deduct Party B's labor cost of 50 yuan/day.
2. During the construction period, Party B's daily working hours are: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
3, engineering quality inspection and acceptance
A, the basis of engineering quality evaluation and acceptance criteria:
(1) Construction drawings, practices and design changes;
② Code for Construction of Residential Decoration Engineering
(3) Quality Acceptance Standard for Urban Family Room Decoration Project
B. Process acceptance items: foundation reconstruction project, water and electricity line reconstruction project (before closing), waterproof project (before tile laying), ceiling project (before plasterboard coating), door and window project, joinery project and wall coating project;
C. Acceptance items confirmed by both parties; Unqualified items should be rectified within a time limit and accepted separately until they are qualified.
Seven, material processing
Party A's materials are delivered to the downstairs where the project is located, and any construction personnel of Party B shall carry them unconditionally.
Eight, garbage removal
1, garbage bagging;
2. Garbage should be cleaned up every day;
3. The garbage shall be transported by Party B to the garbage dump designated by the property. 、
Nine. Labor force management
1. Before starting work, Party B shall provide Party A with copies of the identity cards of all construction personnel;
2. Without Party A's permission, off-site construction personnel shall not spend the night at the site;
3. Party B's temporary residence permit in Changsha is complete, and relevant losses caused by incomplete documents shall be borne by Party B;
4. Without the consent of Party A, Party B shall not change the construction personnel at will;
5. Without the consent of Party A, Party B shall not stop work or go slow under any circumstances.
X. Construction machinery and tools
Party B shall bring its own tools needed for construction, and ensure the safety and good usability of the tools, and the maintenance expenses of the tools shall be borne by Party B..
XI. On-site management
1. Use open flame on site;
2, paint materials must be placed separately from other materials.
Twelve. maintain
1. Party B shall repair the quality problems caused by Party B's construction for free within two years.
2. For general maintenance, Party B shall carry out maintenance within three days after Party A notifies Party B, and for special cases (water and electricity problems), Party B must arrive within 24 hours to carry out maintenance.
3. If Party B fails to complete the maintenance in time as agreed in the contract, Party A can arrange other construction teams to carry out the maintenance work, and the labor costs incurred will be deducted from the project warranty fund.
Thirteen. Annex to the contract
Details of construction contents, items and expenses.
Fourteen dispute over a contract
1. In case of any dispute, Party A and Party B shall settle it through negotiation first.
2. If negotiation fails, a lawsuit can be brought to the court where the dispute is located.
Fifteen. Other instructions and requirements:
1. The pipeline to be concealed shall be concealed after Party A's acceptance, and Party A shall be provided with the as-built drawings of indoor water and electricity pipelines before the completion acceptance.
2. In addition to the above decoration requirements, if there is any extra work, both parties shall negotiate separately, and the construction cost shall not be higher than the average level of the same kind.
3. This project is a package settlement, and Party A only provides materials. Construction tools and other equipment shall be provided by Party B's construction contractor.
4. Party B's construction unit must ensure the construction quality. Found that the construction quality problems, the construction unit shall promptly correct. If quality problems are found during the completion acceptance, the construction unit shall immediately rectify them, and Party A has the right to refuse to pay the labor costs before Party A's rectification requirements are met.
5. Party B appoints (name) as the on-site representative of Party B to be responsible for the performance of the contract, organize the construction according to the requirements of the contract, and complete the construction task on time with good quality and quantity.
6, the construction personnel to civilized construction, barbaric construction is prohibited. 、
7. The construction unit is responsible for cleaning up the construction waste to the designated place in time. After the construction, the construction personnel are responsible for clearing the construction waste at the site, and can leave the site immediately after the completion.
8. Party B shall strengthen the safety education on fire prevention and theft prevention for on-site construction personnel. Construction personnel are not allowed to violate the law and discipline at the construction site, and the consequences will be at their own risk if problems arise.
9. Supplementary provisions
① This contract is signed by Party A and Party B in duplicate, with each party holding one copy. This contract shall come into effect after being signed (sealed) by both parties.
(2) after the signing of this contract, the project shall not be subcontracted.
(3) After the project is completed, the contract will be automatically terminated.
(4) The annexes to this contract are an integral part of this contract and have the same legal effect as this contract.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Classic renovation contract Protocol Sample 3
Employer (Party A):
Contractor (Party B):
I. Contents of the agreement: Party A entrusts Party B to decorate the house.
2. Location of the house:.
Three. The total construction area is 128.24 square meters.
Four. Construction content: See the budget table of decoration project attached to this contract for details.
5. The total cost of the renovation project is RMB 265,438+09,537, say two hundred and nineteen thousand Wu Bai three hundred and seventy yuan only.
Installment payment of intransitive verbs:
Down payment: Party A pays down payment of 100000 yuan to Party B;
Phase II: Issue the acceptance report within 10 days after the project is completed. After passing the acceptance, Party A shall pay Party B RMB 1 19537.
Seven. Project completion period: 10 year 10 30, and the construction period of this project is 20__ _ years. If it is not completed within the time limit, Party A has the right to fine Party B at 0.5% of the total daily project price.
Eight. Party B shall carry out safe and civilized construction. If Party A is punished for violating the law, the responsibility shall be borne by Party B, and Party B's construction personnel must pay attention to safety. All industrial accidents during the construction period have nothing to do with Party A, and the responsibilities shall be borne by Party B..
Nine, careful construction, serious and responsible, strive for high-quality projects, and complete the task with good quality and quantity.
X. During the project construction, if Party A changes the construction scheme, it shall negotiate with Party B in advance, and Party B may calculate the unit price separately.
XI。 Liability for breach of contract:
This agreement is signed by both parties through consultation and shall be abided by jointly. If Party A intends to breach the contract, it shall negotiate with Party B in advance. If Party B doesn't agree, Party A must compensate Party B, and 30% of the project cost price will be used as liquidated damages. In addition, Party A can pay Party B the completed qualified quantities according to the renovation budget unit price.
If Party B terminates the contract without Party A's consent, Party B must compensate Party A for 30% of the total project cost as liquidated damages.
12. warranty period: the warranty period is one year from the date of acceptance by party a. ..
Thirteen. When this Agreement expires, if Party A intends to renew it, it shall negotiate with Party B within the planned time. This agreement and its annexes are made in quadruplicate, one for each party. During the validity of the contract, if there is any dispute between the two parties, it should be settled through peaceful negotiation in principle. If negotiation fails, a lawsuit may be brought to the local people's court.
Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Classic renovation contract Protocol Sample 4
Party A: _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)
In accordance with the Economic Contract Law and the relevant regulations of the Ministry of Construction and the provincial and municipal construction committees on architectural decoration projects, this contract is hereby signed by both parties through consultation:
I. Project Overview and Contracting Method
1. Project name: _ _ _ _ _ _ _ _ _ _ _
2. Project location: _ _ _ _ _ _ _ _ _ _ _
3. Project contracting method: _ _ _ _ _ _ _ _ _ _ _ _
4. Project Profile: _ _ _ _ _ _ _ _ _ _ _ Project Profile: _
Second, the engineering decoration content
Indoor shed surface, wall surface, ground, electrical and other decoration works of the comprehensive building.
Third, the project cost
The project cost is based on the construction drawings, Party A's use requirements and design requirements;
The project cost is RMB _ _ _ _ _ _. (subject to the unit price determined by Party A, subject to the audit after the completion of the engineering quantity)
Fourth, the project cycle
Project commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Project Completion Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Verb (abbreviation of verb) quality requirements
According to the industry standard JGJ 73-9 1 Code for Acceptance of Building Decoration Engineering of the Ministry of Construction and the standards stipulated by provincial and municipal construction committees and fire departments, the project quality has reached the top level. If there are any quality problems after the completion of the project (except those caused by human factors, which will be used by Party A after the completion), Party B shall guarantee them free of charge for one year and maintain them for life. Office decoration model contract
Terms of payment for intransitive verbs
1. After the contract is signed, Party A shall pay the total project cost to Party B..
2. In the middle of the project progress, Party A shall pay the total project cost to Party B..
3. After the project is completed and accepted, Party A shall pay the total project cost to Party B..
4. Party B's remaining project funds shall be paid as quality deposit.
Seven. Responsibility of both parties
1. Party A is responsible for providing the use and design requirements of the whole project; Provide the location of water and electricity on site; Provide material transportation channels, necessary material storage sites and design drawings of original buildings; Responsible for indicating the location of power distribution system, piping system and water supply and drainage master valve involved in the decoration project; The construction site should be flat.
2. Party B: Provide Party A with engineering decoration construction design drawings and engineering quotation.
Eight. any other business
Party A and Party B agree to reach the following agreement:
1. If the construction cannot be carried out due to special circumstances or force majeure, the construction period can be postponed; All losses caused by breach of contract shall be borne by the breaching party.
2. When the materials and technology of the project or project other than the quotation of this project are changed, after Party A confirms the comprehensive unit price, the "on-site visa form" shall prevail and be included in the addendum to the final accounts of completion. (If the project beyond the quotation of this project or the project materials and processes have changed, Party A has recognized it, but Party A does not have a visa, and the expenses incurred will also take effect. )
3. When the engineering quantity changes, the engineering quantity calculation of the project audit after completion shall prevail.
4. If Party A or Party B breaches the contract and fails to implement the contract, they may appeal to the superior competent department or arbitration institution.
5. Other matters not covered shall be settled by both parties through consultation.
6. This contract is made in duplicate, which shall come into effect after being signed by both parties, and each party holds two copies, with the same legal effect.
Party A (signature): _ _ _ _ _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Classic renovation contract Protocol Sample 5
Party A: _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)
Party B: _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)
Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, this contract (including its annexes and all supplementary contracts) is hereby signed for * * * to abide by.
Article 1: Project Overview
1. Project address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. Room specifications:
Total: the construction area is _ _ _ _ _ _ _ _ square meters.
3. Construction content: See Annex (1) List of Home Decoration Construction Contents and Construction Drawings for details.
4. Project Commencement Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5 Project completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Total days of the project: _ _ _ _ _ _
Article 2: Project Price
The project price (in words) is _ _ _ _ _ _ _ _ Yuan (in words).
Article 3: Quality Requirements
1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties. See Annex (III) List of Final Accounts of Home Decoration Engineering Materials for details.
2. Regarding the acceptance standard of this project, both parties agree to refer to Zhejiang local standard "Acceptance Standard for Residential Decoration".
3. During the construction, if Party A has special construction projects or special quality requirements, both parties shall confirm and sign a supplementary contract for the increased costs.
Article 4: Method of Payment
1. Once the contract is signed, Party A shall pay USD _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. (Note: Construction costs include labor costs)
Party A pays off the project price, and Party B issues a unified invoice, handles the handover to Party A, and issues a decoration project warranty card.
Party A's failure to pay on time is a breach of contract, and Party B has the right to stop the construction. If the project price is not settled after acceptance, it shall not be delivered for use.
2. If there is any increase or decrease in the project or need to be changed during the project construction, both parties shall sign a supplementary contract, and Party B shall be responsible for issuing the construction change form and notifying the person in charge of the construction site. Increase or decrease the project price and settle on the spot.
3. If Party A fails to prepay the project price within the time limit stipulated in this contract, Party A shall pay _ _ _ _% of the unpaid project price to Party B for each day overdue.
4. If Party A mortgages the house decoration to the bank, it shall hand over the mortgage certificate and relevant documents (copies) to Party B. ..
Article 5: Liability for breach of contract
After the contract comes into effect, during the performance of the contract, the party that terminates the contract without authorization shall pay _ _ _% of the total contract amount to the other party as liquidated damages. If the actual loss caused to the other party by the unauthorized termination of the contract exceeds the liquidated damages, it shall be compensated.
Article 6: Modification and Termination of the Contract
1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in writing, pay liquidated damages at% of the total contract price, and go through the termination procedures.
2. In the process of construction, if either party proposes to terminate the contract, it shall submit it to the other party in written form. After both parties agree to go through liquidation procedures and conclude an agreement to terminate the contract, the contract shall be deemed to be terminated.
Article 7: Entry into force of the contract
1. This contract shall be sealed by both parties and come into force after being signed.
2. This contract was signed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party A (signature): _ _ _ _ _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Five Related Clauses of the Classic renovation contract Agreement:
★ Five written contracts for personal decoration.
★ The most comprehensive standard houses are 5 in renovation contract.
★ Five classic templates of renovation contract in 2022
★ Formal Personal renovation contract Agreement in 5 copies.
★ 2022 renovation contract General Edition Five Articles
★ 5 Formal contract template for decoration.
★ There are 5 templates in renovation contract in 2022.
★ 5 copies of personal renovation contract model.
★ Five samples of renovation contract 202 1.
★ five standard samples of 2021renovation contract protocol.
- Previous article:Does the property change in the community need the consent of the community?
- Next article:Why are noble families so cheap?
- Related articles
- Where is the address of Jinqiao County, Wei Xing, Taizhou?
- What's the telephone number of Jiuquan Fuze Hua Ting Sales Department?
- When will Bazhou Hongfeng Big Neighborhood deliver the house?
- Xi An Chunlin community specific address
- What is the sales service hotline of Changyang Changlong Shangshuyuan?
- The Golden Years of Fu Jiayan's Junior High School
- How about Binzhou Bincheng Yeung Yi Hospital Co., Ltd.
- What is the telephone number of the sales department of Renhe First Hospital in Guilin?
- Customer service manager resume self-evaluation template
- What about Yichang Jiacheng Property Management Co., Ltd.?