Job Recruitment Website - Property management - How to apply for a canopy on the first floor of the community?

How to apply for a canopy on the first floor of the community?

The legal application for the sun room on the first floor is approved as follows:

The application needs to submit the design scheme and design parameters (wind resistance coefficient), which will inevitably destroy the existing architectural level and the original waterproof structure of the terrace. If you really want to do it, you must go to the urban management department for the record (to prevent it from being regarded as illegal construction).

1, the construction of this damaged structure can only be carried out through declaration and fire protection design. ).

2, drawings, then you must first go to the building department where the house is located to declare the building, after approval by the construction supervisor.

3. Then go to the property to go through the construction procedures, and the steel structure needs to be fixed on the floor.

4. Whether you build a steel structure or a brick-concrete structure, it is illegal to build a sun room without permission, which will inevitably destroy the existing architectural level of the terrace. Moreover, it is necessary to make a fixed connection on the floor to make a steel structure, which will inevitably destroy the original waterproof structure. The construction of this damaged structure can only be carried out through declaration.

You should consult the urban management department, fill in an application form first, and then you can start building your own sun room after getting the approval. When making a sun room, it will inevitably destroy the original waterproof structure of the building, so you must pay attention to another important point, that is, the sun room is waterproof.