Job Recruitment Website - Property management - How much is the labor cost per square meter for water and electricity installation in high-rise buildings?

How much is the labor cost per square meter for water and electricity installation in high-rise buildings?

By July of 20021year, the price is150-one square meter in 300 yuan.

The hydropower installation project of high-rise buildings is different from other projects. This kind of hydropower projects often require certain correlation and interconnection between components, and the requirements for the quality of construction equipment are higher than other projects.

Because the quality of hydropower engineering materials in high-rise buildings directly affects the daily life of future audiences and even involves safety issues, and the technical requirements for construction workers are relatively high, construction workers often have to strictly purchase all kinds of materials needed in the project and strictly control the quality of materials.

Matters needing attention in hydropower installation

When the bottom reinforcement has been tied and the gluten has not been tied, the electrical embedment is completed. The upturned part of PVC embedded pipe of power socket should be embedded in beam or shear wall as far as possible, so it is not easy to block the pipe because of being stepped on. The pipes in the shear wall can be embedded to the height of the socket at one time, which can save a joint.

When the socket in the shear wall is embedded, the leveling layer height of 3~5cm should be considered. After the formwork installation is completed, when the bottom steel bar is not tied, the position of socket and light box can be released in advance, and the direction can be drawn, which can improve the embedding speed and know the embedding direction after pouring.

Refer to the above? Baidu encyclopedia-hydropower installation