Job Recruitment Website - Property management - Cheung chau island, Guangzhou will build 16km Bidao, cheung chau island, Guangzhou.

Cheung chau island, Guangzhou will build 16km Bidao, cheung chau island, Guangzhou.

Recently, Guangzhou Public Resources Trading Center issued an announcement to invite tenders for the general contracting of survey, design and construction of cheung chau island Bidao (Greenway System) Phase I project. The total length of the proposed Bi Road is16260m, and the total area of landscape belt reconstruction is 32,729m2, with a total investment of 53.07 million yuan.

With the theme of "slow life, slow leisure and slow exercise", the project will create a "clean, tidy, safe and orderly" urban environment according to the regional characteristics of cheung chau island, create a garden road landscape where people live in harmony with nature, achieve refined quality improvement, and promote the high-standard construction of the Pearl River International Slow Island. This project mainly upgrades the existing road facilities, including road engineering construction, landscape node construction, greening upgrade, water supply and drainage engineering, lighting engineering, etc. According to the feasibility report in the tender announcement, the construction period can be ended within 240 days, and the completion of 202 1 and 1 is planned.

Bidaoli, which will be built soon, has a total length of16260m, a length of 7070m in Shenjing Community,1920m in Changzhou Community and 7270m in Dajisha!

Binfen shanshui Yixian Qian

The project will create a landmark landscape belt, starting from three aspects of ecology, history and humanity, with the design theme of "colorful waterfront and ecological green corridor", and five landscape belts, namely, urban leisure landscape belt, riverside landscape belt, ecological Metasequoia landscape belt, West Lake landscape belt and ecological pastoral landscape belt.

Urban leisure landscape belt

The total length is about 2075.30 meters, with a large flow of people and vehicles. Greening configuration adopts plant landscape with rich layers.

Riverside scenery belt

The total length is about 1920.00 meters. Increase the cultural landscape and cultural elements, adopt the reasonable collocation of arbor, shrub and ground cover in greening, and change the original slope of plain ground cover greening.

Ecological Metasequoia landscape belt

The total length is about 2554.57 meters, and Metasequoia glyptostroboides forest is taken as the landscape highlight to create an ecological landscape belt.

West Lake Scenic Belt

The total length is about 2440.00 meters, and the original wetland foundation is used to rationally allocate wetland plants to construct the ecological landscape belt of the West Lake wetland.

Ecological pastoral landscape belt

The total length is about 7270. 14 meters, with the surrounding pastoral landscape as the highlight, and grass flowers along the road to create an ecological pastoral landscape belt.

Half-horse racetrack built on the island.

Cheung chau island will be a good place for long-distance running in the future. With the theme of "history, ecology, humanity and wisdom", according to the track standard of A2 Marathon, the project has planned and designed a track path with a length of about 23km in cheung chau island, with a small terrain, which meets the requirements of the international standard semi-horse track.

At the same time, Bidao will be built in two phases. The first phase of the project emphasizes implementation and demonstration, and the construction scope is cheung chau island and Dajisha Ring Road. After the completion of the Bidao Line, it will serve as a demonstration of the long-term implementation effect of the project and a reference standard for the second phase of the project. The first phase of Bidao is mainly aimed at upgrading the implementable sections, which has strong practicability and quick results.

The second phase of the project aims to build a world-class track and a Bidao with the cultural spirit of Huangpu characteristics. In the second phase, Bidao will be built according to the international first-class marathon standards, and at the same time, cheung chau island's historical and cultural elements will be connected in series to fully activate and upgrade the island's cultural tourism format and influence.