Personal work summary of engineering department (six general remarks)

Do you know how to write the personal work summary of the engineering department? What achievements have been made in the work carried out by the engineering department in the past year, and what needs to be improved in the coming year? The following is a summary of my personal work in the engineering department. Welcome to reading.

Personal Work Summary of Engineering Department 1

In a blink of an eye, 20 years have passed in a hurry, and a new year is coming. This paper reviews the work course of the engineering department in the past year and summarizes the work experience and lessons in the past year. Under the correct guidance of the company's leaders, all employees of the engineering department always work hard to create profits for the company and successfully complete the work assigned by the company to the engineering department as scheduled. Looking back, we need to sum up and move on; Looking ahead, the work is still arduous and long, and the road is heavy. The following is a summary of the work of the engineering department this year.

First, the focus of the engineering department

_ _ Project is valued by leaders and concerned by society. But at present, everyone hopes to use natural gas as a new energy source as soon as possible, and get rid of the status quo of gas queuing. The entry of natural gas into _ _ is a timely rain, and the construction of _ _ project is solving the urgent needs of car owners. With the correct leadership of the company leaders and the efforts of employees, the _ _ project has been successfully completed and will be put into use soon!

Second, suggestions in the work

Every time a project is received, according to the characteristics and scale of the project, organize personnel to start with the organizational structure and do a good job within the scope of the project. In order to clarify the responsibilities and implement target management, the Engineering Department signed a target responsibility letter with the heads of all responsible units respectively. The target responsibility book has clear requirements on project quality, construction period, civilized construction, safe production and project cost, which effectively ensures the implementation of the reconstruction project.

Further find out the basic situation of the project and lay a good foundation for the project construction. Pay attention to the technical and professional knowledge of personnel, strengthen professional knowledge training and field work in spare time, and combine theory with practice. The overall self-awareness of the department has been updated, and the technical work has reached a new level. In the process of work, we do not rely on people to manage people, but rely on rules and regulations to restrain and regulate people's behavior, and rely on systems to urge everyone to take the initiative to work, so as to truly achieve "everything is managed, everything is supervised, everything is standardized, and everything is well documented".

Third, the direction of future work efforts

Coordinate with the company's production department, security department and other departments, as well as with the outside world. The engineering department is the department that communicates with the outside world more in the company. Both the construction party and the supervision party should mobilize their enthusiasm, give full play to their potential and cooperate with our work. Strive to ensure the forward-looking and advanced nature of the project, do a good job in each project in line with the principle of saving, and avoid unnecessary waste and redundant construction.

Under the correct guidance of company leaders, we have made greater progress in our continuous development, and the process is full of hardships. We have overcome the complicated construction environment, cold weather and other factors and achieved fruitful results, which is what we expected. Next, we will seek truth from facts and do our best for the project, by going up one flight of stairs!

Summary of personal work in the second engineering department

Time flies, the sun and the moon fly like a shuttle. One year is really short, and 20 years have passed quickly before you know it. The new year has come again. At the turn of the old and the new, we should sum up the past, think about the future, learn from the past, make up for the future, and summarize our work in order to better complete our work in the new year.

20__, entered the company's engineering department, mainly responsible for the technology, construction and cost management of HVAC and water supply and drainage. In the course of my work, I will abide by the company's rules and regulations, be strict with myself at ordinary times, and be honest and self-disciplined. I am conscientious and responsible in my work, able to integrate theory with practice, cooperate with colleagues in the engineering department and related departments, and better complete all the work assigned by the company leaders.

First of all, in terms of technical management

1, can patiently and meticulously do a good job of drawing review, cooperate with the competent leaders and relevant design units to implement the location and direction of water supply and drainage, heating, gas and other pipe networks in the community, find unreasonable schemes and designs as much as possible, put forward their own schemes and ideas, actively communicate with designers, and improve the design of schemes and construction drawings. For example, Zhongrong International Project has many underground structures, and the underground garage and underground civil air defense are connected with various buildings, which will lead to drainage pipes in the future. Therefore, it is proposed to the competent leaders that a passage should be set aside between buildings 2#, 3#, 4# and 5# and underground garage and underground civil air defense, otherwise the drainage pipe network in the community will not be laid. For another example, the design institute designed the heating and water supply and drainage pipes of the connector on the street of Hankou, but there was no place to lay so many pipes on the street of Hankou. After consulting the competent leader, raise an objection to the design unit in time, and change the design after being audited by the design unit.

2. External coordination: For a project, external coordination is very helpful for the smooth development of the project. My main job is to cooperate with various professional companies (tap water, heating, gas) to complete the supporting design of the pipe network of the project under the guidance of the competent leader. With the correct leadership and help of the leaders, we have maintained a good cooperative relationship with various professional companies, and the supporting design of various professional pipe networks is proceeding as scheduled. At present, the design of water supply and drainage pipe network has been completed, and the design of gas and heating pipe network is under way. In the process of work, I can actively cooperate with various professional designers to complete various tasks from the company's interests and perspectives.

Second, in terms of construction site management

When I entered the construction site in early April, I began to study the site water use scheme with the leaders, and assisted the leaders to complete the relevant procedures and design work after the scheme was implemented. In cooperation with the water supply company, the construction of temporary water and on-site construction water for Zhongbaiyi Reservoir was completed, ensuring that the project started as scheduled. Before foundation excavation, with the help of leaders and colleagues, the laying of drainage pipes in the construction site was completed according to the actual situation, which solved the drainage problem of foundation excavation in various construction units.

In the process of making the scheme, the plastic drainage pipe is adopted in combination with the actual project. After drainage, the pipeline can also be used for the hole of the range hood, saving some funds for the company. After the project entered the main construction stage, in view of the hidden parts that are prone to problems, the supervisor and the plumbing squad leaders of various construction units were organized to hold a meeting in time, which put forward clear requirements for waterproof casing's materials and production, and made technical disclosure on the problems that are prone to occur in the project. All construction units are required to do a good job in the sample room before the construction of each working procedure, and can continue the construction only after passing the inspection by Party A and the supervisor to ensure the engineering quality.

In the process of engineering construction, because the professionals of the supervision company sometimes can't be in place in time, it is necessary to regularly check whether the positions and specifications of various pipelines meet the design and specification requirements, and find and deal with the problems existing in the project as soon as possible, so as not to affect the construction of subsequent projects. For example, improve the elevation of the drainage pipe outside the house and solve the problem that the drainage pipe on one side of Hankou Street is too low. In the process of construction management, we can adhere to the design documents as the basis, in strict accordance with the requirements of construction specifications for inspection.

Third, in terms of project cost management.

Be able to strictly review the site construction visa, follow the principle of construction visa, effectively control various factors affecting the project cost, carefully review the list of materials proposed by the construction unit, and correct problems and mistakes in time when found.

The above is what we have done in the past year. In the past year, we have made some achievements, but also some shortcomings, summed up the past experience and tried to correct the shortcomings in our past work. We will be more strict in our future work. While doing our job well, we should constantly learn and accumulate, constantly ask questions, constantly solve problems, and constantly improve ourselves to ensure high efficiency and high quality. Dedicated to the development of the company.

Work summary of three people in engineering department

In _ _ _ _ years, according to the standard requirements of the hotel, all the staff of our engineering department, under the correct guidance of the hotel leaders and with the close cooperation of various departments, United as one. This year, the engineering department successfully completed all the tasks assigned by the hotel leaders, ensured the safe operation of all the hotel equipment, and achieved certain good results. This year (1—1), the engineering department * * issued maintenance orders 1832, and called for repairs 7899 times, totaling 65438.

1. From _ _ _ _ _, all the comrades in the engineering department can seriously convey, implement and understand the spirit of the meeting according to the spirit of each meeting held by hotel leaders, and implement the spirit of the meeting, and formulate a weekly departmental regular meeting system, which improves work efficiency and service quality. In daily work, every employee in the engineering department has done it: sniffing; Hearing and hand modeling. Find equipment defects, eliminate them in time, and never leave any future trouble.

Second, at work, the employees of the engineering department shoulder the maintenance of all the hotel equipment and the normal operation of water supply and power supply equipment. With the normal operation of the attached building rental, dormitory rental and hotel star rating, the workload of the engineering department has increased a lot. The engineering department has overcome the problems of insufficient personnel and large amount of maintenance, and achieved the principle that all repairs should be made. The regularly maintained equipment must be well maintained. Every device has its owner every day. High-voltage power distribution facilities have been used for many years, resulting in loud noise of transformers, low oil level of high-voltage oil circuit breakers, aging of cable joints and insulation. If it continues to be used, it is easy to cause short circuit explosion between phases, which will cause great damage to the equipment and the consequences will be unimaginable. In order to solve this major hidden danger.

The employees in our engineering department report to the manager in time. After discussion, the safety scheme of maintenance and construction is formulated: the cable joints are treated, high-voltage insulation is added, and all switch joints and bus joints are fastened, so that the high-voltage distribution is completely clean and hygienic. The aging of equipment has attracted the attention of the department, and other equipment has been comprehensively inspected. It is found that some equipment is aging, and the butt joint of the seven-layer cable and the butt joint of the 1 layer cable are hot. If it continues to be used at full load, it will cause short circuit between phases and cause great damage to the equipment. After a meeting, it was decided to repair it. Employees should carry out maintenance in narrow ceilings and low-voltage power distribution places. In this process, employees are not afraid of being dirty and tired, overcoming all difficulties and exerting their skills to ensure the normal operation of hotel electrical equipment.

Third, all employees in the engineering department are very active in business learning, communicating with each other, learning from each other's strengths and constantly improving their business knowledge. Take advantage of the meeting time, invite the top ten hotels to answer the phone, as well as the basic knowledge of smart lock maintenance and elevator safe operation training, pay special attention to the maintenance of facilities! Planned training has achieved quite good results, while new employees have planned to strengthen business technology learning and training, which has achieved quite good results, making them familiar with all kinds of hotel equipment as soon as possible and doing a good job of training to independently troubleshoot common equipment failures.

Fourth, project managers often use regular meetings to emphasize safety and work precautions. In order to ensure the safe and normal operation of hotel equipment, it is necessary to improve the professional and technical level of employees and their ability to deal with unexpected accidents. Accurately judge and quickly eliminate all kinds of equipment failures to ensure the normal operation of hotel equipment.

Five, in terms of energy saving and consumption reduction. According to the new requirements of the hotel for the engineering department, the engineering department should be transformed into a profit-making department. With the support of the general manager and various departments, our engineering department first analyzes and investigates the hotel's water, electricity, air conditioning and other equipment and facilities, finds out what can be improved immediately and can't be improved, and makes energy-saving plans and measures in the future transformation.

1. The management, inspection and maintenance of air conditioners have been strengthened. This summer, the intensity of cleaning air conditioners through cleaning nets was increased to improve the refrigeration effect. At the same time, our department also flexibly controls the switching time of the air conditioner according to the temperature and customer conditions, and sets the air conditioner temperature above 26 degrees.

2. For high-power mechanical and electrical equipment, strengthen inspection, ensure that the motor and water pump are in good working condition, and put an end to running, leakage and leakage.

3. The lighting switch of downlight in dining room and lobby is changed to slice control. Change the ones that don't need to be lit during the day to separate control.

4. The solar heat absorption plate is cleaned twice a month to strengthen heat absorption and reduce the number of times when hot water is insufficient to boil water. In May this year, the engineering department reformed the solar water return pipeline to reduce the loss of hot water in the pipeline and make full use of solar hot water. Compared with the same period last year, the fuel cost decreased by 30 thousand yuan.

5. In this year's star rating, the hotel was required to rectify and repair several projects, and the engineering department undertook this project, saving tens of thousands of yuan for the hotel.

The hotel has implemented the daily report system of the operating equipment of the engineering department, combining the monitoring statistics of water, electricity and other equipment with the occupancy rate of rooms every day, and finding out the reasons immediately if there is any abnormality, so as to strengthen the awareness of energy saving.

Over the past year, all the comrades in our engineering department have done a lot of work for the hotel wholeheartedly, both internally and externally, and they can take the initiative to do it, but some work still can't meet the requirements of the leaders. We are determined to sum up the gap in our work in the past year, further improve the ideological quality and personal skills of every employee, and make contributions to our hotel and third-rate hotels.

Work summary of four people in engineering department

In a blink of an eye, it will be the end of the year and the New Year will be ushered in immediately. In this year-end season, I make a detailed summary of my work in the past year.

At the beginning of this year, a detailed inspection and maintenance of the whole fire protection system of this building was carried out. The fire fan, fire pump, fire broadcast, gas fire extinguishing and the whole automatic fire alarm system were inspected in detail. Among them, control, alarm and information feedback tests are carried out for each system unit one by one. In this test, some fans, smoke detectors, water pumps and fire dampers were found to be faulty. Then, immediately summarize the existing problems and arrange maintenance. In this maintenance, some faults are historical problems that have not been solved for many years. The professional actively consulted the information and immediately repaired the root cause of the failure. If some faults cannot be repaired by this professional, contact the manufacturer immediately after confirming the faults and ask the manufacturer to send someone to repair or replace them. During the inspection, testing and maintenance of the fire protection system, the workload is still the maintenance of the fire dampers of the whole building. Fire dampers are generally installed at the inlet and outlet of the air duct, and there are a large number of valve bodies in the closed roof. Whenever the valve body is repaired, the maintenance personnel always have to carry a high ladder, either on a high ladder or in person. The seemingly simple work is actually difficult to maintain, and sometimes even the whole fire damper has to be disassembled and repaired before it can be put back in place. At this time, the system alarm test should be carried out for the faulty valve. After confirming that the fault has been eliminated, the maintenance should be analyzed and summarized, and the maintenance records should be made. According to statistics, more than 20 fire dampers in this building were overhauled during this maintenance.

With the increasing popularity of the building, some well-known large enterprises have begun to live in the building, such as Cabrio, TravelSky and Hitachi in China. In order to generate income for our company, this professional actively undertook the comprehensive wiring work of his company, which also paved the way for the overall wiring level of the building and the rapid inspection and maintenance in the future. During the wiring construction of these companies, my professionals took the initiative to work overtime to ensure that the construction period was completed on time. In the construction process, some trunking is in the ceiling, and the wiring personnel must drill into the sultry roof and walk down the cable with thick wrists layer by layer along the bridge.

The room leads to the equipment room of the user's computer room, and may cross the area rented by the user halfway. It can be seen that the construction is very difficult, and the construction quality is guaranteed with few professionals. In the construction of right integrated wiring, due to the special customers, the wiring requirements are very strict, and it needs to be led to the user's computer room through four long-distance optical fibers. In actual construction, the primary problem is to protect the optical fiber, and it is very difficult to penetrate a meter-long optical fiber into sheath line. Through the efforts of all the staff in this major, the pipeline was finally connected skillfully and intact, and the project was finally submitted on time and recognized by customers.

In the daily maintenance, in order to quickly and conveniently eliminate all kinds of equipment failures, this professional first carried out a detailed inventory of the fire protection system in the building, printed out the address labels of all modules, and checked and labeled them one by one. This job is actually very exhausting. First, confirm the actual installation address of the module from the fire engine, and then bring the ladder to the site. Usually, the fire protection module is installed at the top of the room. This major has to climb the sultry roof and look for modules on the roof. After finding it, he can confirm that it is consistent with the logo of the host, and then label it before leaving. After nearly a month's efforts, more than 800 tiny points in the building were finally checked and marked one by one.

At the same time of these works, the security system has a puzzling failure. There will always be multiple loops disconnected irregularly. After this failure, the security monitoring system failed and the patrol system could not work normally. The professional immediately repaired the whole security system. After many efforts and manufacturers' assistance, the fault was finally confirmed and the system equipment was replaced. In this difficult fault confirmation work, it took us more than a month professionally to finally restore the security system to normal.

Because the building has been built for more than two years this year, the fire probes in the building should be cleaned according to the fire protection system specifications. Before cleaning, there are indeed a few smoke alarms that cannot be reset and eliminated immediately, which has a certain impact on the fire protection system. So this major immediately cooperated with the manufacturer to clean up the smoke and temperature in the building. The workload of smoke removal is huge. Because there are nearly two thousand smoke and temperature senses in the building, everyone has to climb ladders or push elevators instead. This major has overcome the difficulties of few personnel and heavy workload. After more than a month of disdainful efforts, he finally dismantled the smoke temperature sensors in the public * * * area and a small number of rental areas in the building, sent them to be cleaned, and labeled them one by one to make records. According to statistics, there are more than 100 cigarette smoke after cleaning. Then, in the automatic fire alarm system, they are closely observed and tested one by one. In the following two or three months, the small smoke temperature fault returned after cleaning was immediately repaired, ensuring that there was no fault in the fire fighting system.

Looking back on these past events, it is still like yesterday. After more than a year of hard work, the contribution of my professionals to the whole company or the whole building is obvious to all. But for now, although the labor paid in the past is hard and arduous, new problems will always appear and new mistakes will always appear. My professionals will continue to stick to their posts, create a safer, more comfortable and more ideal office environment for our company and customers, and erect the banner of "peace and harmony first" in the property circle.

Personal work summary of engineering department 5

Time flies, and the year of 202 1 is fleeting. Under the correct guidance of the project manager and company leaders, with the active cooperation and strong support of colleagues and departments, I successfully completed all the work of the company and other work assigned by the leaders. Recycle the past and look forward to the future, in order to reach a new level in the new year and better complete the company's various work indicators, which are summarized as follows:

I. Summary of work

1, I am mainly responsible for the procedures for the project to declare the commencement of the project to the quality supervision station, the structural cup project in the construction stage of the project, the declaration of the completion acceptance of the main body of the project, the on-site construction management of the project department, and the application for the night construction permit. Deal with the problems left over by the project, arrange maintenance and customer return visit in time for the existing housing quality problems; Assist the construction department of the construction company to handle the declaration of _ _ building, _ _ building and _ _; On-site management, visa collection and processing, and coordination with district law enforcement bureau.

2. According to the national policy on energy saving returns, all materials related to energy saving were prepared and reported to the district energy saving office, and the energy saving subsidy was successfully applied for more than 10,000 yuan.

3, the project completion formalities.

(_ _ building all civil engineering, water and electricity data handed over to the archives room, coordinate with the budget department to handle the completion settlement of Yaju Garden Project, report to the government hall window and handle the completion record form, which requires more than _ _ million yuan and has been reported to the leadership;

(2) All civil engineering and water and electricity information of the building shall be handed over to the archives, and the budget department shall handle the completion settlement of the construction project, report it to the government affairs hall window, and handle the completion record form. This work is being coordinated, because the thermal insulation material failed in the fire inspection.

4. Construction site management: mainly in strict accordance with the relevant national laws, regulations, standards and norms to supervise the construction of urban projects, implement quality supervision and technical management of the project, and be responsible for the site safety and civilized construction management of the project to ensure that no major casualties and other safety accidents occur. Coordinate technical changes and organize the visa work on the project site, and do a good job in the acceptance of the main body and partial items of the project.

5. Project progress: The engineering department is responsible for the production progress, which directly affects the nerves of every employee in the engineering department. Whether it is the project schedule index signed by the project department and the company at the beginning of the year or the house sales contract signed by the company and customers, the engineering department is invisibly urged to speed up the construction progress. To this end, in order to promote the rapid construction of the project, the engineering department makes every effort to do every job well. The management function of the engineering department on the construction progress is mainly reflected in the preparation, adjustment, implementation, rectification and guarantee measures of the production plan. The construction process of the project is a very complicated production activity. It not only includes organizing thousands of professional construction workers and a large number of construction machinery and equipment to be put into engineering construction in an orderly manner, but also includes organizing the production, transportation, storage and supply of tens of thousands or even hundreds of thousands of tons of building materials, products and components, organizing the supply, repair and maintenance of construction machines and tools, and arranging all kinds of temporary buildings needed for production and life on the construction site. The organization and coordination of these works is of great significance to the rapid, good and economical construction of the project.

Second, the next year's work plan

202 1 this year is an extraordinary year. Through the concerted efforts of all the staff in Qi Xin, the company has achieved a comprehensive victory in all its work, which can be said to be rapid and fruitful, and all its business indicators have reached record highs. In the new year, I will continue to accumulate experience, work hard with all my colleagues, work hard, study hard, strive to improve my cultural quality and various work skills, and contribute to tomorrow.

Personal Work Summary of Engineering Department 6

_ _ year is coming, and the new year is coming. Standing at the end of the year and beginning of the year, looking back on the work of this year, I feel a lot. I report my work summary and the work plan of 202 1 to the company leaders and colleagues.

I. Review the work of _ _ _

(1) Main work contents:

1. Coordinate the work contact of various functional departments of the company in construction management, such as the related work between design, bidding, business, scheme, materials, property and administration departments;

2. Organize and coordinate the contractor's construction tasks and management processes, such as the contractor's management process, work content and technical disclosure;

3. Coordinate the construction management relationship between disciplines, such as organizing and coordinating professional construction process disclosure, site working face handover, technical disclosure, etc.

4. Assist in solving the mediation work of industry requirements and interference with engineering construction, such as contacting the government industry authorities, dealing with villagers' interference with engineering construction, and dealing with construction personnel's troubles.

5. Implement the work responsibilities and working relationships of professional engineers in the engineering department and supervision unit, such as: defining the work content of each department, defining the work responsibilities of professional engineers, organizing the task and process disclosure of professional engineers, establishing the working relationship between professional engineers, and coordinating the construction relationship between professional engineers.

6. Be responsible for arranging and implementing all municipal and house construction electromechanical projects, such as electromechanical installation of contractors such as water supply and drainage, electricity, heating and ventilation, gas, etc.

7. Be responsible for arranging and implementing all civil and hydropower projects in the villa area, such as masonry, waterproofing, water and electricity, doors and windows, etc.

8. Responsible for the arrangement and implementation of fine decoration of model houses and public houses, such as the early decoration of high-rise model houses, villa model houses, sales departments, corporate clubs and golf clubs;

9. Assist in the implementation of various construction links of municipal roads and water systems, greening, fences and other projects, such as water and electricity consumption, site and related water and electricity construction;

10, to assist the daily maintenance and rectification of buildings in use;

1 1, responsible for the use and charge management of hydropower;

12. Participate in making progress plan, quality control, safety management, technical scheme review, bidding cooperation, contract review, project payment review, etc.

(II) Summary of the above work.

In the past year, in the management of project progress, quality, cost control, coordination and cooperation, Gigi responded to the instructions of the company's leaders, earnestly implemented all the work, diligently and conscientiously devoted himself to the work.

But at the same time, it also changed the conventional management mode, greatly improved the emergency work ability and accumulated some experience in dealing with construction measures.

Second, experience

(a) Impact of design and construction on the project

Tianlong 3,000 Sea Project has high positioning and quick start. Its purpose is to build real estate at home and abroad and seize the first place in the market. In this case, the Three Thousand Seas Project entered the construction stage too quickly. The planning stage, preliminary design stage, design stage, construction stage and completion acceptance stage of the actual construction industry are all very important, especially the engineering design is the most important engineering document to guide the implementation of the project. The Three Thousand Seas Project was hastily started under the condition that the design review was not rigorous enough. The phenomenon of design and construction is also produced. For example, from the early stage of piling, changes began to appear. Later, there were many versions of design drawings such as curtain wall, water and electricity, water system, garden, decoration, etc. Many projects were deepened again and again, and even many of them were constructed according to the disclosure on the imaginary site. The important guiding role of engineering drawings has been greatly lost. There are many sporadic projects, which often leads to the disconnection between design and construction. Many construction tasks are carried out in a hurry, but there are also many mistakes.

(B) the impact of insufficient budget forms on construction management (quota labor)

(3) Planning objectives

(4) Materials

Three. Constructive opinions

(1) Establishment of management framework system

(2) Management personnel configuration, tasks and responsibilities

(3) Enterprise Management Measures (Manual)

(4) Management of supervision unit

(5) Management of the construction unit