Infrastructure of Xinhai New District in Lianyungang City

Huaguoshan Boulevard (Xueyuan Road-Cangwu Road)

Huaguoshan Avenue (Xueyuan Road-Cangwu Road) has a total length of1.277m and a red line width of 60m. The west side intersects with Xueyuan Road, and the north side intersects with Cangwu Road, showing a four-plate, two-way six-lane, with a middle bandwidth of 4 meters, a fast lane width of 12 meters, a side lane width of 3 meters, a slow lane width of 5 meters, a sidewalk width of 5 meters and a width of 3 meters in turn.

New construction project of Lingzhou Road (including crossing Ninglian Expressway Bridge-Yulin Road)

The total length of the newly-built road on Lingzhou Road (including Yulin Road crossing Ninglian Expressway) is1.760m, of which the bridge length is 559m, the road length is1.052m, the approach length is1.48.5m, the road width is 60m and the bridge width is 50.5m. The total investment of the project is 200 million yuan.

Keyuan North Road (Yulan Road-Zhenhua Road) Section Keyuan North Road (Yulan Road-Zhenhua Road) Section 1+340-3+780, the total length of the road is 2440 meters, the width of the red line is 60 meters, and the total project cost is about 47.68 million yuan.

Lin Xue Road (Qingfeng Road-Yulan Road) Section Lin Xue Road (Qingfeng Road-Yulan Road) Section 0+964.505-2+ 174.796, the total length of the road 12 10 m, the red line width is 30 m, and the total cost is about160 m.

Zhenhua Road Undercrossing (Xueyuan Road-Xingtan Road) The total length of Zhenhua Road Undercrossing (Xueyuan Road-Xingtan Road) is 417m, the red line width is 60m, and the project cost is more than 34 million yuan.

New Project of Zhenhua East Road (Huaguoshan Avenue-Xingtan Road) The new project of Zhenhua East Road (Huaguoshan Avenue-Xingtan Road) starts from Xingtan Road in the west and ends at Huaguoshan Avenue in the east, with a total length of 750m and a red line width of 60m. Project cost 1 1.84 million yuan.

Sakura Road (Huaguoshan Avenue-Xingtan Road) The construction cost of Sakura Road (Huaguoshan Avenue-Xingtan Road) is about 7.7 million yuan, with a total length of 936 meters and a red line width of 24 meters (including sidewalks and green belts of 4.5 meters, mixed lanes 15 meters and sidewalks and green belts of 4.5 meters).

Sewerage Pipeline Project of Keyuan North Road (Shenghu Road ~ Zhenhua Road)

The new sewage pipeline project of Keyuan North Road (Shenghu Road-Zhenhua Road) starts from Chunhui Road in the north and ends at Zhenhua Road in the south. With Shenghu Road sewage pumping station as the boundary, it will converge from both sides to the middle, and finally enter Shenghu Road sewage lifting pumping station. The total length of the pipeline is about 2598m, including 15 pipe jacking working well and 15 pipe jacking receiving well. The project started on March 20, 20 12 and is scheduled to be completed on March 4, 20 165438/kloc-0. The total construction period is 240 calendar days, and the project cost is about 8 million yuan.

Shenghu Road (Xingtan Road ~ Keyuan North Road) goes under the new construction project.

The newly-built Shenghu Road (Xingtan Road ~ Keyuan North Road) underpass project is located in the south of the scenic Huaguoshan Scenic Area, which is the main road of the city and the nearest road connecting the urban area with Huaguoshan Scenic Area. The commercial added value on both sides of the road is unlimited. The total cost of the project is about 26.8 million yuan, the total length of the road is 500 meters, the width of the red line is 55 meters, and the clear height of the underground passage is 4.5 meters. U-shaped groove structure is adopted, and the bottom plate of the U-shaped groove is mass reinforced concrete.

Dongyanhe landscape belt

Total investment100000 yuan, with a total area of 5.6 hectares.