Job Recruitment Website - Property management - Village flood control notice

Village flood control notice

Village flood control notice (selected 13)

In a progressive society, there are more and more situations that need to be notified. Notice can be used to give instructions, arrange work, convey relevant matters, convey leadership opinions, appoint and remove cadres, and decide specific issues. In order to make it easier and more convenient for you to write the notice, the following is my carefully compiled village flood prevention notice (selected 13). Welcome everyone to learn from and refer to. I hope it helps you.

Village flood prevention notice 1 Dear residents and friends,

According to the forecast of the meteorological department, from 23rd to 25th, due to the joint influence of high-altitude trough, bottom shear and southwest jet, there will be continuous heavy rainfall in the whole city, and the accumulated rainfall in the process can reach 200mm, and the rainfall in some areas may exceed 250mm.

Notification according to document number. Jing Xun has issued 20xx25, and at present, the city has started flood control level III emergency response. In order to ensure that residents in this area can spend the flood season safely, please take the following flood control measures:

1, pay attention to typhoon and flood prevention, close doors and windows, try to reduce going out on weekends, check the flowerpots and sundries outside the window separately and put them in a safe place to avoid hurting people.

2. If there are residents living in dangerous houses within the jurisdiction, please move them to relatives' homes or higher places as soon as possible.

3. The community is in a state of full alert, all staff are normal on weekends, and community staff are on standby 24 hours a day. In case of emergency, please contact the grid operator or the community.

I hope that the majority of community residents will actively cooperate.

Notifier:

Date:

Village flood control notice Article 2 All units, cadres, workers and their families:

When the rainy season comes, in order to do a good job in flood control and prevention of geological disasters, and safeguard and guarantee the safety of people's lives and property, combined with the actual situation of our field, the experimental field has formulated the "20xx Flood Control Work Plan for Teaching Experimental Field of China Agricultural University", which is hereby issued, please follow it.

After receiving this notice, all units must conscientiously do a good job in the investigation and rectification of hidden dangers of flood control; Improve all kinds of flood prevention plans and work plans; Do a good job in the prevention and control of geological disasters in key areas; Do a good job in preventive measures for key parts such as family areas, especially the living areas of bungalows; Do a good job in emergency material reserves and emergency team building to further enhance flood control and emergency response capabilities; Once the disaster is found and reported in time, it is not allowed to report it late; All units should strengthen leadership, fully implement the flood control responsibility system, strictly implement the 24-hour duty and leadership shift system, be strict in discipline, and obey orders.

When the rainy season comes, it is suggested that all cadres, workers and their families minimize going out and actively take protective measures to ensure the safety of daily production, life and personal travel; Pay attention to the slippery road surface to ensure traffic safety; Family members of workers living in bungalows should do a good job in housing safety prevention; Pay attention to lightning protection when traveling in thunderstorm weather; Be sure to watch your step when you go out. If you find the rain spinning, please make a detour. Try not to get close to the lamppost to prevent electric leakage and electric shock.

Notifier:

Date:

Village flood control notice level 3 centers (departments):

In recent years, the climate change is very abnormal, the extreme weather in the country has increased obviously, and the climate situation in xx is also very severe. According to the forecast of the meteorological department, there will be floods in some areas of xxx in the flood season this year, with more precipitation in xx, and the flood control situation is not optimistic. In order to conscientiously implement the spirit of xxxx flood control work conference and effectively ensure the safety of logistics group in flood season, relevant matters are hereby notified as follows:

1, all centers (departments) should strengthen their leadership, strengthen their responsibilities, unify their thinking, raise their awareness, attach great importance to campus flood prevention and rescue work, and conscientiously implement the responsibility system for flood prevention and rescue. The person in charge of the department is the first person responsible for flood control work, and flood control work should be taken as an important task in the flood season. If problems are found and dealt with in time, it will affect property safety, and relevant personnel shall be investigated for responsibility as appropriate.

2 centers (departments) should pay close attention to the implementation of various flood control measures. Emergency materials and equipment are mainly reserved by each unit, and when necessary, the flood control office of the Group will make overall arrangements for dispatching. In an emergency, the flood control office has the right to mobilize materials, equipment, transportation and other tools and manpower within its jurisdiction for flood control and emergency rescue.

3, conscientiously do a good job on duty, the key parts should have a daily patrol, report and handle the problems in time.

4. Each center (department) shall arrange the flood control work of the center (department) according to the flood control work arrangement of the Group, implement the rescue personnel, notify the specific personnel, define the work tasks and work places, and submit the list of rescue personnel to the General Management Department before June 22nd.

5. In order to implement the flood control work, each center (department) shall inspect the scope under its jurisdiction and the facilities and equipment used before June 25th, make records, and report the results and handling opinions to the General Management Department in written or e-mail form, e-mail address: (xxx).

6. Flood control work from now until September 1. During this period, the flood control leading group and rescue personnel will ensure smooth communication.

Notifier:

Date:

City, county (city, district) Education (Sports) Bureau Village Flood Control Notice:

Since June 22nd, there have been heavy rains in parts of western Hunan and northern Hunan, and the rainfall in 252 townships has exceeded 100 mm. Comrade Xu, secretary of the provincial party committee and governor of the provincial people's government, paid special attention to this and personally dispatched and directed the recent flood control and disaster relief work in the business room of the provincial capital on June 23rd, and made important instructions. Secretary Du Jiahao emphasized that people's life safety should be put in the first place, and special attention should be paid to students, children and the elderly. Schools are places where students are concentrated. If the rainfall is particularly concentrated, we must resolutely suspend classes! Schools that may have landslides and mudslides and schools with unstable buildings such as classrooms, dormitories and fences should be transferred in time. Governor Xu also emphasized the importance of students' personal safety and school safety.

According to the forecast of meteorological department, there will be heavy rain in our province in the coming week, even heavy rain, especially in the north of central Hunan, and the flood control situation is very severe. Education administrative departments at all levels should strengthen their duty work, pay attention to close contact with meteorological, water conservancy, land, safety supervision and other departments, and do a good job in flood control work in schools at all levels under the leadership of the local government and anti-finger prevention. Schools with serious hidden dangers should be closed to ensure the personal safety of teachers and students. When encountering disasters, we should take the initiative to deal with them and actively and properly handle them. At the same time, it is time to announce the scores of college entrance examination and candidates' scores, and to fill in the volunteers in the near future. All local schools should tell candidates to pay attention to road safety. If volunteers are blocked, measures such as remote reporting and flexible disposal can be taken.

All kinds of schools at all levels should, according to the requirements of the secretary and Governor Xu, arrange special personnel to be on duty 24 hours a day, strengthen the monitoring of school buildings, carefully check every school building and other places where there may be hidden dangers, transfer students in time when hidden dangers are found, and report to the education department and relevant departments at the same time. Those who suspend classes can suspend classes. In case of danger, evacuate as soon as possible and report.

Schools around the country, if there is an emergency, should promptly report to xxx, the general duty room of the Provincial Department of Education.

Notifier:

Date:

Flood control in villages in development zones Article 5 Notice of enterprises:

In order to further strengthen the flood control work of enterprises and ensure that the flood control responsibility system and various measures are put in place, the flood control work of enterprises is hereby notified as follows:

First, raise awareness and strengthen organizational leadership.

All enterprises should clearly understand the seriousness and urgency of the flood control situation this year, pay close attention to disastrous weather changes such as heavy rainfall, overcome careless thinking, proceed from the overall situation of employee life safety and maintaining social harmony and stability, earnestly strengthen organizational leadership, and fully implement responsibilities.

The second is to comprehensively investigate and eliminate potential safety hazards.

According to the actual situation, all enterprises seize the key and weak links and seriously organize flood control and drainage inspection. In particular, do a good job in the inspection of key areas and facilities and equipment, mainly including: houses (including fences and other ancillary facilities), flood control facilities, water accumulation points, construction sites, underground spaces, ancient and famous trees, power facilities and equipment, drainage pump houses, downpipes, pipelines, manholes, drainage facilities, lightning protection facilities and various flood control materials. Leading cadres of enterprises should take the lead in in-depth first-line inspection, carry out self-examination and rectification of flood control and drainage in a targeted and uninterrupted manner, deal with the problems found in the inspection in time, clarify the responsible persons, conscientiously implement rectification measures, and resolutely eliminate all kinds of potential safety hazards.

Third, strengthen prevention to prevent accidents.

All enterprises should conscientiously follow the relevant requirements, take the prevention of all kinds of flood control accidents and secondary disasters as the goal, and actively make basic preparations for flood control, emergency rescue and disaster relief on the basis of comprehensive and meticulous inspection. Focus on the following work:

1, do a good job of inspection and maintenance of drainage facilities and equipment and drainage pipe network. All enterprises clean up the roof platform to ensure that the gutter and downpipe are unobstructed; Timely dredge and maintain the drainage pipe network, clean the drainage well, ensure smooth road drainage, clean up road garbage in time, and prevent the water inlet of the drainage pipe from being blocked in rainy days; Enterprises in low-lying and waterlogged areas should be prepared to prevent rainwater from flowing backwards and drainage, and necessary facilities such as water storage wells, drainage pumps and water baffles should be set up if conditions permit.

2, a comprehensive survey of enterprise housing situation. All enterprises should conduct a comprehensive safety inspection of houses (including leased houses). Check old houses, simple houses and ceilings, timely repair and reinforce hidden dangers, and implement safety and flood control measures.

3. Strengthen safety inspection. All enterprises should check power sockets to avoid leakage and electric shock accidents caused by water seepage; Do a good job of pruning branches that are easily touched by wires to prevent electric shock and large-scale power outages.

Fourth, make plans to improve flood control capacity.

All enterprises should carefully analyze and find out the weak links in flood control work. In view of the fact that natural disasters such as thunderstorms may endanger the property and personal safety of enterprises, we should promptly formulate and implement various emergency measures, grasp the initiative of disaster prevention, control the possible losses to a minimum, and avoid casualties of enterprise property and personnel.

Five, strengthen the duty to ensure the smooth flow of information.

All enterprises should strictly implement the system of 24-hour duty and shift-taking in flood season, conscientiously perform their duty of duty in flood season, keep abreast of weather changes, master information such as severe weather, give early warning, take effective preventive measures in time, and keep mobile phones on for 24 hours to ensure smooth information. Major floods, dangers and disasters should be dealt with in time and reported in time according to relevant regulations.

Notifier:

Date:

Village Flood Control Notice 6 Dear Owner/Tenant,

The rainstorm weather is coming again! The Central Meteorological Observatory issued a yellow warning for typhoon. From 20: 00 on June 2 to 20: 00 on June 3, 65438, there will be strong winds of magnitude 7-8, and there will be heavy rain in central and eastern Guangdong. The service center reminds you to take the following safety precautions:

1. Please close the doors and windows in time before going out or having a rest, so as to prevent rain from drifting indoors; When going out, please remove or turn over the deodorizing cover of the balcony floor drain to avoid poor drainage of the balcony during heavy rain;

On rainy days, the floors in the lobby and overhead floor are slippery. Please be careful when going out, and pay attention to non-slip;

3. When driving a vehicle, please drive slowly and carefully to prevent accidents caused by road slippage;

4. Try not to use indoor water heaters, televisions, computers and other electrical appliances in thunderstorm weather, and unplug the power supply.

5 When going out, you should also avoid standing under dangerous buildings or scaffolding, pay attention to lightning protection, avoid water accumulation and pay attention to traffic safety.

Thank you for your cooperation and support to the service center. If you have any questions, please contact the front desk of the duty service center.

Notifier:

Date:

Notice of flood control in villages Article 7 Dear owners:

Hello! According to the latest weather forecast, there was heavy rainfall in most parts of our city on June 9 and June 10. The property service center reminds the owners to take safety protection measures while doing the relevant flood control work.

1, advise the elderly and children at home to minimize outdoor activities;

2. Try to park the vehicle in a higher terrain area;

3. Please close the indoor windows before going out to prevent rainwater from entering the room;

4. Please check the floor drain on the balcony or terrace to ensure smooth water flow. If the floor drain is blocked, it should be cleaned in time.

5. Movable items such as flowers, plants and bonsai placed outdoors, balconies and terraces should be removed as soon as possible to avoid accidents caused by falling objects.

If you need urgent help, please contact the property service center in time: xxx.

Notifier:

Date:

Village flood control notice 8 city (state) agriculture bureau (committee) (agriculture, animal husbandry, aquatic animal husbandry):

Since the flood season, there have been different degrees of floods in many places in our province, especially in the mountainous areas around the basin and earthquake-stricken areas, which are prone to secondary disasters. On the 24th, a sudden mountain collapse occurred in Xinmo Village, Diexi Town, Maoxian County, Aba Prefecture, which sounded the alarm for flood control and disaster reduction in various places. To this end, the party group of the office attaches great importance to it, and all localities should pay close attention to rain, water, disasters and people's feelings, and do a good job in disaster prevention and relief and disaster reporting in a timely manner. The relevant matters are hereby notified as follows:

First, fully implement the responsibility of flood control and disaster reduction.

Municipalities (States) agricultural departments should attach great importance to the redeployment and re-implementation of flood control and disaster reduction work, and implement responsibilities at all levels. It is necessary to check again the implementation of flood control and drought relief responsibilities, the formulation of emergency plans and the preparation of emergency measures to ensure that all disaster prevention measures are in place. It is necessary to further mobilize and strengthen emergency duty. Once a disaster occurs, it is necessary to carry out disaster relief work at the first time.

The second is to strengthen the guidance service in flood season.

It is necessary to guide flood-prone areas to adjust planting structure and implement technical measures for disaster prevention and mitigation; Intensify the investigation of facility agriculture, check and maintain livestock and poultry sheds again, ensure the smooth drainage lines of rain and sewage in farms, and guide large-scale farms to deal with feces in time to avoid pollution spread; Guide all localities to strengthen the reserves of disaster relief seeds, fertilizers, vaccines, forage and other materials.

Third, strengthen the dispatch and submission of disaster information.

Strengthen coordination and cooperation with meteorological departments, forward meteorological early warning information, and do a good job in prevention. Adhere to the combination of daily dispatch and emergency dispatch, actively do a good job in early warning and emergency response, and collect and submit disaster information according to the requirements of Natural Disaster Express and the prescribed time limit and content, so as to predict before the disaster, respond at the first time after the disaster and summarize after the disaster. Strengthen communication with local prevention, emergency response and disaster reduction departments, implement departmental linkage and regional cooperation mechanisms, adhere to unified leadership, and do a good job in joint consultation and information sharing.

Fourth, try our best to restore agricultural production.

Effectively strengthen the prevention and control of animal diseases, do a good job in immune disinfection and harmless treatment of dead livestock and poultry, deal with sudden outbreaks in time, strengthen quarantine supervision in circulation, and prevent dead livestock and poultry from entering the market. Actively coordinate with relevant departments to ensure the smooth transportation of agricultural materials and agricultural products. Actively coordinate the agricultural insurance department, verify the disaster situation as soon as possible, and implement insurance claims. Organize and mobilize the masses to do a good job of self-help in production, reduce disaster losses as much as possible, and help do a good job in recovery and reconstruction.

Please cities (states) in accordance with the requirements of the annex, summarize and report the flood disaster since June. The disaster report must include the disaster occurrence process, disaster losses, production self-help measures, difficult problems, etc., and be submitted to the contact person's mailbox before 12: 00 on Monday, June 26th (disaster report and form with 1-2 photos attached).

Notifier:

Date:

Village flood control 9 street office notice:

In recent years, extreme weather events have occurred frequently, making it more and more difficult to prevent local heavy rainfall. It is urgent to further strengthen the construction of flood control emergency capacity, and the flood control plan system at grass-roots and village levels is particularly important. According to the requirements of the Provincial Defense General's "Emergency Notice on Preparing and Perfecting Village-level Flood Control Emergency Plan as soon as possible", in order to effectively strengthen the construction of grassroots village-level flood control emergency plan system, the emergency notice on preparing village-level flood control emergency plan is as follows:

First, raise awareness and strengthen organizational leadership. Strengthening the preparation of village-level flood prevention emergency plans and establishing and improving the grass-roots emergency plan system are the basic work to improve the ability to deal with sudden extreme weather events, which is related to social stability and people's lives and property safety. All streets should earnestly raise awareness, strengthen leadership, quickly organize and comprehensively carry out the preparation of village-level flood control emergency plans. Village-level flood control plans shall be organized by the street flood control headquarters, and the preliminary examination opinions shall be submitted to the district flood control department for approval.

Second, elaborate organization to ensure the quality of the plan. The preparation of village-level flood control emergency plan should be strictly in accordance with the requirements of the Outline of Village-level Flood Control Emergency Plan, with the principle of "not dying, less loss" as the first principle, and enhance pertinence and effectiveness. On the basis of comprehensive investigation of disaster-prone points such as dilapidated houses and low-lying areas, we should adhere to the combination of prevention and early warning and emergency response, clarify specific measures and responsible persons in each link, especially formulate early warning measures according to weather forecast, implement personnel safety and risk avoidance plans, and refine specific responsibilities to households.

Third, speed up the progress and play the role of the plan as soon as possible. The street flood control headquarters should take effective measures to speed up the preparation of the plan, and complete the preparation of the village-level flood control emergency plan before August 10 and submit it to the district for review. Regional defense refers to checking and reporting the progress of planning. At the same time, it is necessary to do a good job in the training and drills of village-level flood control plans to ensure that the plans play a role as soon as possible.

Notifier:

Date:

Village flood prevention notice 10 dear residents and friends,

According to the latest news released by Ningxia Meteorological Observatory and the latest meteorological data analysis, it is predicted that there will be a rainstorm in Ningxia from this evening to this evening. It is estimated that from the night of 23rd to the night of 24th, there will be heavy rain to rainstorm along Shizuishan, northern Wuzhong and Helan Mountain in Yinchuan, with the cumulative rainfall of 50-80mm, and some towns and villages can reach more than 80mm. There will be moderate rain (10-25mm) in other areas, and there will be heavy rain (25-38mm) in the southwest of Guyuan City, which may cause flash floods, urban waterlogging and geological disasters.

Please remain vigilant and pay attention to the following safety matters to prevent problems before they happen:

1. Please don't charge outdoors and in the garage today and tomorrow, so as not to cause electricity accidents.

Second, try not to park the vehicle in the underground garage to avoid damage.

Third, don't drive in the water, and don't restart the vehicle after it is turned off in the water.

Fourth, personnel should pay attention to safety and take good care of the elderly and children at home.

Five, to ensure that property is not damaged, and take preventive measures.

6. Residents who live in bungalows and have underground garages should take waterproof measures in front of the door, and it is best to bring their own sandbags to prevent rainwater from pouring into the house.

Reminder: In case of danger, residents and friends should not panic and take relevant first aid and self-help measures. At the same time, cooperate with the community and property companies to do emergency work.

Notifier:

Date:

Village flood prevention notice 1 1 Dear residents,

Hello!

After receiving the notice from the higher authorities, our city has recently entered the rainy season, and all communities have taken flood control measures. In order to ensure the safety of our community, we will comprehensively investigate the sewage system and place flood control materials at the entrance and exit of the garage; At the same time, I also remind you to pay special attention to:

1. Do not place hanging objects such as flower pots on the balcony, balcony railings or outside the window.

Please close the doors and windows when you go out to prevent the rainstorm from drifting indoors and causing unnecessary losses.

Third, please remind the decoration workers to close the doors and windows after work, especially the high-rise residents, to prevent the strong wind from blowing off decorative materials such as window sashes and causing safety accidents.

Fourth, please check the residents who install air conditioners, and remind the installers to lock the shutters of air conditioners after installing them, so as to prevent the shutters from being blown off by strong winds and causing safety accidents.

5. Please don't stack anything in the safe passage and make emergency preparations.

6. Please pay special attention to the owners of underground parking spaces and register information at the door before entering the garage. In case of heavy rain or rainstorm, please be prepared to move the vehicle out of the underground garage at any time to prevent accidents.

Notifier:

Date:

Village Flood Control Notice 12 Village (field), Sanxikou Reservoir Management Office and Town Dike Management Office:

In order to do a good job in flood control this year, all villages (fields) and relevant units must act immediately, establish a strong sense of responsibility, put this year's flood control work on the agenda, make unremitting efforts, study, prepare, deploy and implement flood control preparations as early as possible, make mental preparations for preventing major floods, and implement various preventive measures as soon as possible to ensure the safety of water conservancy projects and the safety of people's lives and property, and promote social stability.

First, in order to do a good job in flood control this year, all villages (fields) and relevant units should set up flood control and disaster relief headquarters, strengthen flood control and disaster relief leadership, and report the list of members of the headquarters to the town flood control and drought relief headquarters before March 30.

Second, unify thinking, raise awareness, earnestly strengthen leadership over flood control work, conscientiously implement the general policy of "safety first, prevention first, and prevention is more important than robbery", firmly establish the idea that everyone is responsible for flood control and disaster relief, do a good job in key project construction, pay close attention to repairing water-damaged projects and ending spring water projects, and implement risk removal and reinforcement measures one by one in view of weak links and unsafe factors that endanger water conservancy projects. Each village (field) should start to formulate the 20xx annual flood control and disaster relief plan, so as to have rules to follow, improve adaptability, and ensure the safety of water conservancy projects within the design flood control standards.

Third, seriously carry out the safety inspection of flood levees and reservoirs. Each village (field), reservoir and dike management unit shall, according to their respective flood control tasks, organize inspection teams to conduct a comprehensive inspection of the safety of water conservancy facilities such as reservoirs, flood dikes, sluices and culverts, especially the restoration of water-damaged projects caused by floods and typhoons last year. In addition to feedback to the town headquarters, they should also take effective measures to deal with the problems found in the inspection one by one. The relevant village (field) and dike management office should seize the time to implement the principle of "whoever sets up obstacles and clears them".

The dike cleaning work requires that the dike cleaning work be completely completed before March 30, so as to create favorable conditions for flood control work. The town flood control and drought relief headquarters will organize relevant dike and reservoir section leaders, technicians and project managers to conduct comprehensive inspection and acceptance.

Four, conscientiously implement the flood emergency leadership responsibility system with the responsibility system of party and government leaders at all levels as the core. Villages (fields) and water management units should continue to improve the three-in-one responsibility system of leading cadres, technicians and project managers. The leaders of warehouses and dikes should go to the covered reservoirs and dikes as soon as possible to check their familiarity with the situation and help solve practical problems in flood control work.

Five, in order to ensure the needs of flood control and disaster relief, we should prepare flood control and emergency materials, establish and improve the mass emergency patrol organization, and achieve safe flood control. The relevant villages (fields) and units should pay close attention to the implementation of the number of emergency materials that should be prepared in the town's flood prevention and rescue work plan, and make full preparations. The materials in stock should be fully counted and dried, and the insufficient parts should be supplemented in time, so as to be prepared and nip in the bud. Rescue teams and patrols should identify personnel, determine the person in charge and the tools they carry with them, so that they can come at the call and resist when they come. Villages (fields) should list the rescue teams and inspectors, and report to the town flood control and drought relief headquarters before March 30.

Please implement the above notice carefully.

Notifier:

Date:

Village flood prevention notice 13 each village committee and relevant units:

According to the policy of "the responsibility system is implemented for flood control, and the main leaders of the local party and government are responsible for the problems", the responsibility system and plan for the leaders of towns and villages of our town's 20xx annual key water conservancy projects are hereby printed and distributed to you. I hope that you will earnestly take responsibility and earnestly implement it. Other water conservancy projects, key areas and parts prone to geological disasters (landslides and mudslides) within the jurisdiction of villages, low-lying areas along the river, houses and dangerous houses along the river, etc. It is necessary to implement the responsibility system, put the responsibility on people, formulate plans for flood control and geological disaster prevention, and truly achieve "no dam collapse, no dam collapse, no death, and safe flood season". Ensure the smooth development of people's lives and property and the national economy. The relevant matters concerning the current flood control and flood fighting are hereby notified as follows:

First, the establishment of flood control and disaster relief headquarters. The village committees, enterprises and institutions should set up a command organization headed by the main leaders of the party and government, which is responsible for the unified command of flood control and disaster relief work in the local area and the unit. The members of the flood control and disaster relief command group of each village unit should submit it to the Party and Government Office before this month.

Second, carefully organize pre-flood safety inspection. Village committees and relevant units should, according to their own flood control characteristics and tasks, be led by the main leaders to conduct safety inspections on water conservancy facilities such as reservoirs, dams, drainage stations, culverts, sluices, bank revetments, and construction sites prone to landslides and mudslides and with large excavation. And take effective measures to solve the problems found in the inspection, especially the dangerous sections and water-damaged projects caused by floods, typhoons and rainstorms.

Third, do a good job in clearing obstacles. Villages should carefully remove all kinds of illegal buildings, planting, piling up debris, garbage and all kinds of operations that endanger the safety of dams, rivers, reservoirs and other water conservancy projects in combination with flood control safety inspection.

Fourth, make preparations and prepare flood control materials. Villages and Jingxi supply and marketing cooperatives should prepare according to the material indicators issued by the county and town governments and store them in designated places. The stones and sand in the flood control storage pool should be inspected one by one, the damaged flood control materials should be replaced and supplemented in time, and the flood control materials in the village should be counted according to the storage points, and reported to the DangZhengBan before the end of this month. All relevant units should prepare sufficient flood control materials according to their own flood control requirements.

Five, the implementation of the flood control team. Villages must be fully equipped according to the requirements of the number of patrol rescuers issued by counties and towns. Villages and relevant units that are not included in the tasks assigned by counties and towns should be equipped with patrols and rescue teams according to the actual needs of the village, and it is required to do a good job in naming, cataloging, posting and grouping (team). Make sure that every team member is familiar with the situation, with clear tasks and appropriate tools. Villages should report the list of emergency team patrols to the town party and government office before the end of this month.

Six, do a good job in the military and civilian forces, cooperate with each other, and form a joint force. Flood control and disaster relief work has the characteristics of wide coverage, heavy workload and strong suddenness. Villages should actively contact with the local garrison, obtain the support of the local garrison, and formulate the military-civilian joint defense plan. Enterprises and institutions such as telecommunications, electric power, traffic health, public security, supply and marketing cooperatives, factories and mines must cooperate closely and fully support and assist flood control and disaster relief work.

Seven, the reservoir should be strictly in accordance with the 20XX limited water level in flood season, clearly marked water level, it is strictly prohibited to overstock. For accidents caused by over-storage, the relevant leaders and parties will be held accountable.

Eight, drainage station should pay close attention to equipment maintenance, safety inspection, spare parts preparation, machine pit, forebay dredging. And hurry up the trial before the flood season.

Please implement the above notice carefully!

Notifier:

Date:

;