Job Recruitment Website - Property management - High score livelihood report
High score livelihood report
Investigation report on the implementation of ten projects to improve people's livelihood
According to the spirit of the letter from the municipal party Committee, a research report is now formed on the construction of urban affordable housing, the transformation of back streets and alleys, and the construction of urban and rural environmental infrastructure.
I. Construction achievements
(A) the construction of affordable housing, the implementation of low-rent housing system: in order to properly solve the contradictions and difficulties in the demolition area, so that people in need can afford housing and ensure that "everyone has a house."
Since 2005, affordable housing in Sunshine Community (65,438+4,000 square meters), green home housing (2,600 square meters), Wangjiatang housing, Anjufang housing (3 1 000 square meters) and the first-phase affordable housing in Castle have been started one after another. This year, the construction of resettlement houses for farmers in the new area (6.5438+10,000 square meters), demolition and resettlement houses in Wangjiatang (nearly 30,000 square meters), the second phase of affordable housing in Castle (nearly 38,000 square meters) and the affordable housing community in the new area (planned construction is 6.5438+030 square meters, and the first phase project is 60,000 square meters) has been started. At the same time, in order to speed up the improvement of the urban social security housing supply system and establish the urban low-rent housing system, the municipal government issued the "Measures for the Administration of Low-rent Housing for the Lowest Income Families in Urban Communities in xinghua city" (for Trial Implementation) in April this year, which provided a realistic legal basis for the next implementation of the low-rent housing system in our city.
(2) Reconstruction of back streets and alleys: Since the beginning of March this year, our bureau has organized 20 construction teams, divided into four major districts, which are in full swing in 24 districts in the urban area. At present, 398 of the 762 back streets and alleys have been rebuilt and maintained, and 250 have been completed. At the same time, 965438 septic tanks in old residential buildings were cleaned, rebuilt and newly built.
(3) Construction of urban and rural infrastructure, supporting projects and environmental projects: By the end of 2007, the planned urban area reached 64 square kilometers, the urban population was170,000, the built-up area reached1650,000 square kilometers, the population density was 2,444 people/square kilometer, and the per capita road area increased to 15.98 square meters. The sewage treatment rate reached 5 1.74, the domestic garbage treatment rate reached 100, the per capita public green space area increased to 6.07 square meters, the green coverage rate reached 33.52, and the green space rate was 28.9 1. In 2007, the investment in urban and rural construction was 4.7 billion yuan, an increase of nearly 15. Among them, urban construction investment is 654.38+0.5 billion yuan, and small town construction investment is 3.2 billion yuan. Road and bridge construction, focusing on the implementation of "Nine Roads and Four Bridges" in the old city and "Ten Roads and Three Bridges" in the new city, with an additional road length of 16 km and an additional road area of 260,000 square meters. Municipal engineering construction, combined with the construction of new areas and development zones and the transformation of old cities, continued to expand the scale of urban water supply, installed 9 kilometers of main pipelines with a diameter of 100 mm, installed 2,638 users, and implemented the system of "one meter for one household" to transform more than 2 100 households; The scale of urban pipeline gas has been further expanded, with 30 kilometers of gas supply pipelines laid and 2,000 new users added; The construction of the sewage treatment plant is progressing smoothly, and civil works and part of the collection pipe network have been completed. In terms of ecological greening project construction, around the goal of creating a provincial garden city, we will complete the greening transformation and replanting in spring, open the People's Park and Gongjitai Park free of charge, focus on autumn greening, and fully complete 17 autumn greening projects, with the newly added greening area in the city reaching 879 1 10,000 square meters. The transformation of the old city is progressing steadily, focusing on the second phase demolition of Zhonglu Road, taking into account six demolition projects, including Wangjiatang flood control wall plot, Beiyaochang plot, Radio and Television Bureau plot, Yuejinqiao West Water Conservancy Project plot, Zhaoyanglou relocation plot and flood gate construction plot. The area of houses demolished in the whole year was nearly 6.5438+0.5 million square meters, and more than 654.38+0.600 households were relocated. Real estate development continued to maintain a high-speed development trend, with 2/kloc-0 new real estate projects, with a newly started area of 458,200 square meters and a completed area of 3,645,438+0,000 square meters.
Second, the main practices
(a) to speed up the implementation of urban smooth project. Around the construction of urban road and bridge projects, we will integrate the new area with the old one, speed up the implementation of the urban smooth project, build the urban road network in the inner ring and outer ring, improve the urban traffic capacity and make it more convenient for citizens to travel. In terms of project construction, the three leading groups of municipal engineering, landscaping and old city reconstruction will implement the project construction in pieces and speed up the project construction. Further improve the regular meeting and meeting system, combine the director's office meeting with the project regular meeting, hold the project regular meeting, keep abreast of the project progress, and earnestly urge the construction unit to promote the project construction according to the construction progress. Carry out the overall linkage mechanism of project construction, grasp the progress of projects under construction on the one hand and the start of projects to be built on the other, and realize interlocking and overall linkage from project construction design, bidding, entry and construction, so as to effectively improve the efficiency of project construction. Taking the monthly construction plan as the node, we should pay equal attention to progress and quality, assessment and supervision, and go all out to do a good job in project construction.
(2) Deepen the popular support project: adhere to the people-oriented principle, effectively accelerate the construction of infrastructure and supporting projects closely related to the people, and solve the practical problems of the people. The maintenance and reconstruction project of the back lane was promoted. Last June 165438+ 10, the municipal government held a special work meeting on the maintenance and reconstruction of back streets and alleys, and determined that the responsible department for the maintenance and reconstruction of back streets and alleys was the Municipal Construction Bureau. To this end, our bureau quickly worked out the work plan and carried out the investigation of back streets and alleys in 24 communities in advance. Combined with the long-term management system of provincial civilized cities established by our bureau, the investigation of back streets and alleys in 24 communities is linked with a deputy director and a specific responsible department, which effectively guarantees the meticulous and comprehensive investigation work. After the investigation, our bureau collected and sorted out the basic information of back streets and alleys in urban areas and other relevant materials for scientific decision-making and deployment of back streets and alleys in our city. On this basis, in June 5438+10, our bureau summarized the survey data, and scientifically formulated the maintenance and reconstruction plan according to the survey results of backstreet alleys. More than 600 back streets and alleys in 24 communities are divided into four areas, southeast and northwest, and 20 blocks are divided for reconstruction and construction. In order to ensure the effectiveness of the maintenance and reconstruction of back streets and alleys, our bureau further optimized the construction plan, classified and reconstructed back streets and alleys, and divided more than 600 back streets and alleys into three types of areas for reconstruction. The first type of area is the area where demolition is not carried out, represented by Chang 'an Community and Wenfeng Community, with transformation as the main focus.
Re-laying sewers, pavement reconstruction combined with the characteristics of water towns, all cement floor tiles were replaced, and cement floor tiles were laid in Zhuxiang, Fuzhi Lane and Longzhu Lane. The second type of area is a lot that will not be demolished in 3-5 years, such as most residential areas in the southern suburbs. This kind of area is generally based on maintenance, but the severely damaged pavement has been comprehensively reformed and cement floor tiles have been laid. The east street of the archway community has also completed the task of laying cement floor tiles, and the sewer cannot be unblocked. Three types of areas are recently demolished areas, such as Canglang Community and Confucian Community. These areas will not be repaired for the time being, and the masses strongly expressed the urgent need for road maintenance for simple maintenance. On February 16, the bidding work was completed, and 20 construction units were determined. In order to ensure the smooth implementation of backstreet and backstreet, our bureau dispatched four deputy directors as film directors in four districts in the southeast, northwest and each district is equipped with professional project managers and project supervisors. According to the maintenance and reconstruction plan of "key breakthrough and step-by-step implementation", from March this year 1, all 20 construction units entered the site for construction, and the reconstruction of back streets and alleys was in full swing. In order to make the practical project of backstreet maintenance and reconstruction successful and actively respond to Jia's urban construction concept of "people build the city and the city is for the people", our bureau has put the people-oriented concept of "urban construction should not only do practical things for the people, but also do practical things for the people and do things that the people are satisfied with" throughout the whole process of backstreet reconstruction. On the one hand, do a good job in organization and scheduling, shorten the construction period as much as possible, and reduce the interference to people's production and life. On the other hand, in the process of construction, our bureau fully considered the wishes of the masses, and listened to their opinions from the formulation of the construction plan, the implementation of the construction organization and the construction operation time. In view of the problems raised by the masses in the renovation and maintenance of septic tanks, our bureau has repeatedly docked with the Urban Management Bureau and included septic tanks in the scope of renovation. This measure of benefiting the people has been welcomed by the masses. At the same time, our bureau further improved the urban housing security system, increased the construction of affordable housing, housing for the needy and farmers' resettlement houses, actively promoted the low-rent housing system and expanded the benefits of the urban housing security system; Effectively strengthen the property management of residential quarters, fully implement the "three guarantees" work, gradually realize the closed management of residential quarters, and effectively increase the environmental improvement of residential quarters; Take people's livelihood as the first demand, adhere to the principle of "all-weather service, seamless management and full coverage of responsibilities", and take the "123 19" urban construction service center as the platform to fully promote seamless coverage of urban municipal management. "123 19" urban construction service center is a convenient and efficient service window set up by our bureau in response to the call of the municipal party Committee and the municipal government to solve the hot and difficult problems in the lives of the general public. The hotline was officially opened on March 19. Since its opening, it has handled more than 300 incoming calls, letters and visits. In the next step, we will start with the hardware facilities of the service platform, gradually improve the construction of software facilities, actively enlarge the service platform for the people, and turn the "123 19" urban construction service hotline into a "people's voice channel", which will really play a positive role in listening to people's feelings, helping people's needs, solving people's worries and warming people's hearts.
(3) Vigorously implement environmental protection projects. Taking the creation of a provincial garden city as the starting point, we will vigorously carry out urban greening, beautification and lighting construction, and strive to create a new look of the city with layered greening, beautification, taste and lighting characteristics. Urban greening construction has been promoted. Combined with the transformation of the old city, the construction of the new district and the development of Wujindang scenic spot, urban green space has been increased in a large area, and three indicators of urban greening have been improved. Accelerate the implementation of road greening construction, increase the intensity of road greening and replanting transformation, help and guide the general public to do a good job in courtyard greening, balcony greening, roof greening, wall greening and indoor greening, vigorously develop vertical greening and three-dimensional greening, and constantly open up green space. By inviting landscape experts, the design concept of urban roads, scenic spots and street greening in our city, the research layout of tree species and the reasonable collocation of trees, shrubs and flowers are investigated, and efforts are made to improve the grade of urban greening construction, so that urban greening construction can adapt to highlighting urban personality, inheriting urban cultural context and enhancing urban image. We will implement the greening of communities and units, actively carry out the creation activities of "provincial garden-style communities and units", and strive to build a number of large-scale and high-grade garden-style communities and units. This year, we will focus on promoting the construction of "two belts, three parks and four rivers". The "two belts" are the green belt of the south traffic line and the green belt of the northwest traffic line; The "Three Gardens" are bamboo and stone gardens, forest parks and water parks; "Four Rivers" are zhigang River, Zhongxin River, Chelu River and Canglang River. Vigorously carry out urban beautification construction, fully tap the historical and cultural resources and ecological natural resources of our city, vigorously promote the construction of Wujindang Scenic Area, and accelerate the construction of scenic real estate and forest parks; Pay attention to the construction of human landscape, speed up the repair of Zhaoyang Building, the construction of Ren Reading Building and the maintenance of ancient city walls; Effectively accelerate the pace of urban lighting project construction, and improve the construction of street lamp facilities on both sides of urban main roads in accordance with the principle of "building a room, lighting a little, building a road, lighting a line, building a district and lighting a piece", so as to enhance the lighting effect of urban night scenes and improve the degree of urban lighting.
(4) Adhere to the coordinated development of urban and rural areas. Considering the balance of urban and rural development, rural construction and urban construction should be placed in the same important position, and as a whole, unified planning and overall consideration should be made to achieve coordinated urban and rural development. We will comprehensively carry out a new round of adjustment and revision of the overall urban planning, intensify the detailed planning of small towns, and ensure the completion of the planning of 100 village construction. Earnestly intensify the construction of small towns, promote infrastructure construction and real estate development, vigorously implement the construction of public green space, and strive to improve the urban green coverage rate and per capita public green space area. Taking the establishment of a well-off demonstration village as the starting point, we will comprehensively carry out village environmental construction and rectification activities in order to achieve practical results in the rectification work. Strengthen the management of town planning and construction. Under the leadership of the township government, organize law enforcement team members to conduct regular inspections, strengthen inspections of various constructions within villages and towns, and ensure that all constructions within villages and towns are implemented in strict accordance with the plan.
Third, there are problems.
(A) urban infrastructure construction debt, lagging behind economic development, affecting the overall function of the city. Although the urban infrastructure in our city has developed in recent years, there is still a big gap compared with the index of "five cities creating together". Urban water supply capacity, urban per capita road area, per capita green space level, harmless treatment of urban garbage, feces and sewage, urban signs, sketches, squares, green spaces and other cultural atmosphere and civilization consciousness all need further efforts.
(2) The construction of urban supporting projects is not strong enough. In recent years, there is still a phenomenon of emphasizing development and neglecting supporting facilities in urban construction in our city. The development of new areas and the transformation of old cities emphasize economic benefits and ignore social benefits; There is still a disconnect between development and support.
(3) The coverage of affordable housing construction is not wide. At present, the construction of affordable housing in our city is mainly used to resettle relocated households, and it is a fixed-sale house, which is not really for the needy people.
/zwgk/ztbd/weiminqinmin/content _ 3980 1 . html
/s? lm = 0 & ampsi = & amprn= 10。 ie = GB 23 12 & amp; ct = 0 & ampwd = % C3 % f 1% C9 % FA % B9 % A4 % B3 % CC % B5 % F7 % d 1% D0 % b 1% A8 % B8 % E6 & amp; pn = 10 & amp; ver = 0 & ampcl = 3 & ampf= 1
- Previous article:What is the significance of Asian fashion apartments?
- Next article:Hefei Poly Lafite Mansion Ximen New School belongs to which community?
- Related articles
- How much is the deed tax of Anqing real estate?
- Residential Quality in Lanxi, Lu 'an, You Ran
- Top 50 Real Estate Development Enterprises in Henan Province with Comprehensive Strength
- Which community does Dongguan Chengnanheng Dayujing belong to?
- What should I do if I don't admit that there is water leakage upstairs and don't open the door to cooperate with the inspection?
- Where are the scenic spots in Yanjiao Chang 'an?
- How to deal with the dripping problem of air conditioning upstairs
- Why is the sixth phase of Hi-Tech Green Water Dongcheng cheap?
- How many years is the property right of Zhengzhou Baicheng Upper House?
- How many years is the property right of Guangyuan Jinlin Yiyuan Garden?