Job Recruitment Website - Property management - 202 1 model essay on project quality undertaking

202 1 model essay on project quality undertaking

In engineering projects, the control of engineering quality should be not only in place but also practical. Only under the guarantee of quality can we gain the trust of customers. The following is the "202 1 Project Quality Commitment Model" compiled by me for your reference only. Welcome to reading.

202 1 Letter of Commitment on Engineering Quality: Our company makes the following commitments to the exterior wall real stone paint project constructed by your company:

1, shelf life commitment:

Our company provides high-quality products and high-standard construction and services, which can ensure that the quality and color of the real stone paint in this project can be maintained for more than years. The construction period should be completed within the reasonable days specified by you (except for irresistible weather factors), and the workload should be completed together with the civil engineering. Ensure excellent quality and strive for "".

2, quality assurance:

Raw material control

All raw materials are supplied according to the supplier's designated point, and each batch of raw materials has undergone strict inspection.

production control

Adopt special production equipment for real stone paint, strictly control the production process for mass production, and ensure product quality and timely supply.

Color difference control

Because natural sand is used in the color matching of real stone paint, in order to ensure as little color difference as possible between batches, our company adopts the largest special production equipment for real stone paint in China, which can produce 5-6 tons each time to ensure the color consistency of each facade.

quality assurance

If there is a product quality problem with the exterior wall real stone paint produced by our company, it will be confirmed by both parties through negotiation (if necessary, we can refer to the retained seal sample and entrust a third-party legal certification body to confirm it), and our company will be responsible for the economic losses of users (provide the product certificate and factory inspection report with the materials).

3, construction quality assurance

According to the Code for Acceptance of Decoration Engineering in People's Republic of China (PRC) and other relevant national standards, total quality management is implemented.

Strictly control the process quality, master the spraying time interval, drying degree and spraying amount per unit area of primer, real stone paint and topcoat, and spray in strict accordance with the paint amount of real stone paint for external walls, so that the area at the end of the workshop can be monitored by calculating the paint amount.

Spraying quality requirements, the same coating has the same tone, and it is not allowed to be missed or undercoated, and the thickness and color are uniform and will not be polluted. There should be no obvious spray marks at the joint, the texture should be true and the color coating should be evenly distributed.

In the process of construction, strengthen the contact with the owner and the construction team, send technicians to supervise and guide the construction team, and timely feedback all aspects of construction requirements and information to ensure that the construction is completed on time and with good quality.

Party A and the supervision company shall assign special personnel to monitor the process of the following construction teams at irregular and uncertain locations.

Strictly organize and standardize management to ensure that the painting project meets the requirements of excellent projects.

4, engineering maintenance commitment

Due to the inherent characteristics of the company's products, the coating has strong adaptability after molding, and it is not easy to have problems under normal circumstances. However, in the process of use, both man-made and natural disasters will bring some damage to the coating. In this case, the company will send people to visit for free every two months on average within one year, and then send people to visit for free every six months, and the company will be responsible for free warranty within one year to ensure the perfect image of the company's products in the eyes of users.

Commitment: XXX

202 1 x month x day

202 1 Project Quality Commitment Letter Fan xxx Company, as the general contractor, solemnly promises to the construction unit that in order to ensure the construction quality of the second phase reconstruction and expansion project of XXX Sewage Plant, it will take full responsibility for the project quality within the construction scope according to the construction contract. Commitments are as follows:

1. Establish a project technical quality management system headed by the chief engineer and attended by relevant technical quality management personnel. Clarify their respective responsibilities and work contents to ensure that technical quality work is effectively and truly implemented. On the basis of respecting laws, regulations and relevant provisions, do a good job in quality work.

2. Establish a quality responsibility system and be responsible for the construction quality of the project. The project leader, technical personnel and quality management personnel are required to be familiar with the drawings carefully, and make a scientific and feasible construction plan to guide the construction. Make records of the construction site, with the responsibility to the people, and be responsible for each divisional and subdivisional work. In case of quality problems, the project leader shall bear joint and several liability and be punished according to the relevant system of our company.

3, resolutely in accordance with the engineering design drawings, construction technical standards and norms to organize the construction. Never modify the engineering design without authorization, never cut corners, and strictly follow the drawings. If errors are found in design documents and drawings during construction, comments and suggestions shall be put forward to the construction unit and supervision unit in time.

4, in accordance with the engineering design requirements, construction technical standards and contract, all building materials, components, equipment and commercial concrete inspection test. Never use it without inspection or unqualified inspection, and be willing to be punished if you can't do it.

5, establish and improve the construction quality inspection system (self-inspection), strict process management, completes the quality inspection and record of concealed works.

6. The test blocks, test pieces and related materials related to structural safety shall be sampled on site under the witness of the construction unit or the engineering supervision unit, and sent to the quality inspection unit with corresponding qualification grade for quality inspection.

7, training system, strengthen the education and training of employees' technical quality, without education and training or examination unqualified personnel are not allowed to work at their posts.

8. Strengthen the management of construction quality of subcontractors, and adhere to the principle that the general contractor is responsible for management and subcontracting is unfavorable to the general contractor. The quality management of subcontractors must be incorporated into the quality management system of the general contractor, and the management functions should be implemented. In case of quality problems of subcontractors, the general contractor shall take overall responsibility and bear corresponding joint and several liabilities.

9. Fulfill the quality warranty obligations of construction projects according to law (the quality warranty period is calculated from the date when the project is completed and accepted).

The above is our company's solemn commitment to the project quality. If our company fails to meet the promised excellent standards during the project acceptance, we are willing to accept 5% of the project cost as a penalty. Once there is a serious quality problem, which has a huge social impact, and is willing to accept the punishment of laws and regulations, it will automatically and unconditionally withdraw from the construction site.

Commitment: XXX

202 1 x month x day

202 1 Project Quality Commitment Letter Fan Wensan. Through careful reading and understanding of the bidding documents, combined with the actual situation of our unit, we made the following commitments on the engineering quality of supervision bidding, a supporting road project for the planning of the renovation area of Room 12:

A, commitment to the project quality standards. The supervision unit promises to supervise the project quality on behalf of the construction unit according to laws, regulations, relevant technical standards, construction project supervision specifications, design documents and construction project contracts.

Second, the supervision unit promises to equip the members of the supervision team to enter the construction site and the required testing equipment and tools according to the supervision contract.

Three, the project use or installation of building materials, building components and equipment must be signed by the supervision engineer, unit engineering, concealed engineering, project payment and completion acceptance must be signed by the supervision engineer.

4. The supervision engineer promises to carry out supervision by standing by, patrolling and parallel inspection according to the engineering supervision specifications.

Five, undertake the project supervision institutions must abide by the relevant national laws, regulations and technical standards; Fully perform the supervision contract, control the quality, cost and progress of the project, manage the relevant contracts of the construction project, and coordinate the relationship between the parties concerned in the project construction; Do a good job in the management of all kinds of supervision materials, and submit a complete supervision file to the supervision unit or relevant departments after the supervision work.

6. If the supervision unit fails to perform the supervision obligations as agreed in the entrusted supervision contract, or fails to inspect the projects that should be supervised or inspected in accordance with the regulations, thus causing losses to the construction unit, it shall bear the corresponding liability for compensation. If the project supervision unit colludes with the contractor to seek illegal interests for the contractor and cause losses to the construction unit, it shall be jointly and severally liable for compensation with the contractor.

7. Promise not to disclose confidential information related to this project and this contract business without the consent of all parties concerned during or after the contract is terminated.

Commitment: XXX

202 1 x month x day