1, waterway design should first consider all water-related equipment, such as water purifier, water heater, kitchen treasure, toilet, washbasin, etc. Their locations, installation methods and whether hot water is needed; It is necessary to make good use of gas or electric water heaters in advance to avoid temporary replacement of water heaters, which will lead to repeated reconstruction of waterways; In addition to the washbasin, toilet, washing machine and other outlets, it is best to bring one out to facilitate the later water mop; 2. It is the first time for a cabinet manufacturer to come to the door. It is best to bring the construction master who changed the water together and communicate face to face.

Before construction, the upstairs should be waterproof to ensure that there is no water seepage downstairs before construction.

3. After waterway reconstruction, suppression experiments should be done. The fireman reminded me to press 6 to 8 atmospheres with a press to keep it from leaking for 30 minutes.

It is best to have a property on the scene to suppress the test, which can play a supervisory role; Because some decoration teams will cheat the owners in this link.

4. After the kitchen and bathroom floor tiles are laid, check whether the floor drain is unobstructed (the drainage speed after removing the floor drain cover shall prevail, because most deep-water sealed floor drains have the problem of slow drainage); If you want to close the redundant floor drain, you must block the gap between the drain pipe and the floor drain to prevent water from overflowing;