How to fill in the quality evaluation report of fire engineering supervision

assessment report

I. Overview of the Project:

Project name: 1-2-3-4-5-7-8 Floor: 6+1; 1 1+ 1 layer

Construction unit: xx County Urban Development Co., Ltd.

Construction units: the third and fourth companies of xx Construction Corporation and xx Daqin Company.

Design unit: Architectural Design and Research Institute of xx University of Architecture and Technology

Supervision unit: xxxx supervision company

Project Location: West Section of xx Avenue, xx County

Area of basement 1: square meters; Area of eleven floors above ground: square meters; Building height: m

Second, the main content and scope of the evaluation

1. Indoor fire hydrant system 2. Combined system of fire hydrant and fire pump

3. Automatic sprinkler system. Automatic fire alarm and linkage system

5. Smoke control system 6. Fire emergency lighting system and emergency broadcasting system

7. Front room fire door 8. fire elevator

9. Fire extinguisher 10. emergency power supply

1 1. Lightning protection and grounding

Three. Basis of evaluation

1. Contract related to construction project

2.GB50 100-200 1 (unified standard for construction quality acceptance of building engineering)

3. Fire protection design and construction drawing and change technical audit sheet.

4. ((Code for Acceptance of Construction Quality of Building Electrical Engineering)) GB50303-2002

5. ((Code for Acceptance of Construction Quality of Intelligent Building Engineering)) GB50339-2003

6 ((Code for Acceptance of Construction Quality of Building Air Conditioning and Ventilation Engineering)) GB50243-2002

7. ((Code for Acceptance of Construction Quality of Building Water Supply and Drainage Engineering)) GB503242-2002

8. ((Mandatory Provisions for Construction Projects)) Fire Protection Part

9.9. Relevant regulations on quality acceptance of fire fighting engineering in XX province

4. The quality behavior of the construction unit

The construction unit shall prepare the construction organization design before construction, including the construction site management system, project quality and safety assurance system and specific implementation. There are special plans and technical disclosure for main parts and special construction. Construction equipment shall be in place according to the requirements of construction organization design to meet the construction requirements. In the whole construction process, the construction unit can accept the supervision and management of relevant units and departments as needed. According to the requirements of construction specifications, all working procedures should be inspected and audited. After the acceptance, the next working procedure can be entered. Construction can be carried out according to the design requirements. The construction quality has reached the acceptance.

5. Quality control of materials, components and equipment:

All materials, components and equipment of this project shall be submitted for inspection in time as required, checked and accepted by professional supervision engineer, and put into use after being approved by design, specification and main departments. The production license, quality inspection report and certificate of fire protection products are complete. Follow-up inspection will be carried out during construction, and if quality problems are found, they will be removed in time. Indoor fire hydrants are not only issued by the fire product conformity assessment center of the Ministry of Public Security (national compulsory product certification certificate), but also issued by the fire product conformity assessment center of the Ministry of Public Security.

Various sensors and actuators installed in the field are in a stable state during the trial operation. The smoke exhaust valve, fire damper, air supply valve, release (used to forcibly cut off non-fire power supply), water flow indicator, temperature nozzle, smoke sensor, temperature sensor and manual alarm box button (direct pump start button in fire hydrant) have all passed strict quality inspection. The quality certification documents provided by the construction unit are complete and have been tested by professional testing institutions.

6. Safe production and civilized construction

Before the project starts, the construction unit has formulated special safety regulations for safe construction. In the process of construction, we can basically organize the construction according to the regulations, and keep regular safety inspection on the construction site: the construction site is equipped with full-time safety officers. The safety officer holds the certificate of safety officer issued by the Provincial Construction Department, can bear hardships and stand hard work, and accept the management and supervision of supervisors.

The safety management during the construction period of this project conforms to the provisions of the Regulations on the Administration of Work Safety in Construction Projects. Construction and installation of this project began on March 2, 20 1 1 year. 20 12 March, led by the project supervision department, the construction, property management company, design, construction unit and the fire department of the construction unit company formed an acceptance team. Project completion acceptance.

Seven. project comprehensive evaluation

The construction unit can organize the construction according to the construction drawing, current specifications and construction organization design, and some parts and processes that do not meet the construction acceptance specifications have been rectified under the supervision of the supervision engineer. According to GB50300-200 1 (unified standard for construction quality acceptance of building engineering) and relevant professional acceptance specifications, all sub-divisions have passed the engineering quality experience; Concealed works have been accepted by relevant units before concealment, and acceptance documents have been formed; Safety and main use functions meet the design requirements; The engineering visual quality meets the requirements. The qualifications of all personnel involved in the acceptance meet the requirements; The acceptance method of the supervision unit meets the specification requirements.

To sum up, the fire protection project of this project has been assessed as qualified by Xiamen Jinzhengyuan Supervision Company, and it is agreed to declare the comprehensive acceptance of fire safety quality.

Xxxx project management company

Director: xx