Job Recruitment Website - Property management - Does signboard approval need to go through the property?

Does signboard approval need to go through the property?

1. The property needs to check whether the signboards on the pavement are damaged by stones, walls, insulation layers, etc. Positive. These parts belong to the public * * * part, and have a stake in the adjacent enterprises;

2. A copy of the signboard design drawing needs to be kept for the property management company for the record, which will affect the bearing capacity of the structure, wind resistance, light pollution, lighting of neighboring businesses, and blocking the line of sight.

3. It depends on whether the size of the signboard does not meet the relevant regulations of the local street office and the urban management and law enforcement bureau. Generally, streets will require uniform size, and scaffolding and enclosures need to be built during construction (this depends on the management of urban management and law enforcement bureau);

4. Does the fire department and signboard affect the fire escape on the second floor (the glass window on the second floor of the multi-storey street-facing shop is the fire escape of the shop and cannot be blocked).

5. Signboards should not cover natural gas pipelines.