Job Recruitment Website - Property management - Brief introduction of Jindi International City
Brief introduction of Jindi International City
I. Overview of the Project
1. 1 Name, nature and scale of the proposed project
(1) Project name: "Jindi International City" residential project;
(2) Nature of the project: newly-built commercial housing;
(3) Construction unit: Huainan Wanyang Real Estate Co., Ltd.;
(4) Construction site: south of Chaoyang East Road, Huainan City;
(5) Project investment: 500 million yuan (excluding land acquisition), all of which will be solved by the enterprise itself;
(6) Area: 292933.3m2;;
(7) Building area: 539788m2.
In Jindi International City Community, the floor area ratio approved by the government is 1.84.
1.2 construction content
The construction project is located at the edge of the urban core area of Tianjiaan District, Huainan City. The total land area is 292,933.3 square meters, and the project is divided into two plots. Plot A is adjacent to Chaoyang East Road in the north and Xiaochun Mingcheng residential area to be built in the south. Block B is 60m south of Fuhuai Railway Line and north of Jianjiapeng Lingcheng Residential District. Building 17 and 8+ 1 in Area A of this project (including 1 and sales center 10); 1/building kloc-0/is a high-rise building with 18 floors; Five apartment buildings with floors 19 and 28 will be built near Chaoyang East Road, with shops on floors 1 ~ 3 along the road; Five commercial storefronts with 2 ~ 3 floors will be built on one side of the special railway line of the power plant, with parking on the ground and underground. Area B of the project is mainly multi-storey, with 4 floors, 5 floors and 4+ 1 floor totaling 3 1 building. 6 houses with 8+ 1 floor; /kloc-8 high-rise residential buildings with 0/8 floors; Two residential buildings, 1 1 floor, including shops, clubs, kindergartens, activity places, etc. The total construction area of the project is about 539788m2;; The residential area is about 502 179 m2, the commercial area is 325 14 m2, the clubhouse area is l628 m2, and the underground garage area is about 55,000m2. The planned total number of households is 6262.
Project composition list
Remarks on the construction content of category single project name
The main project consists of 80 multi-storey, small high-rise and high-rise houses and apartments. The residential building area is 502 179 m2 A, in which 1 ~ 33 # is residential, 1 ~ 3 floors are some shops, and 34 ~ 39 # buildings are commercial storefronts. Except for some shops at No.38 and No.39 near Kangxing Road, the 42 buildings in Area B are all residential buildings.
The commercial building area is 32515m2. A commercial street with an area of 31338.45m2 will be built on the east side of Area A; : area b is1176.6m2.
The sales center of supporting projects has a construction area of 1224 m2, which is located at the secondary entrance on the west side of Area A.
The nursery covers an area of 2054.78 square meters and is located in the south of Area B of the project.
The construction area of the conference building is 1628.5 m2, which is located in the south of Area B of this project.
The pressurized pump house is located in the underground garage and sales center, and the water tank is located on the roof.
The switching station of power supply substation is located in area B, and the substation boxes are located in different positions on the ground.
The gas pressure regulating station is located in a safe position in Area A of the project, meeting the safety distance of gas.
The activity center is located in the south of area B.
The water supply for public works is introduced by the municipal water supply pipeline D500, and a circular water supply pipe network with a diameter of D300 is formed in the residential area.
High-rise buildings are equipped with pressurized pump houses and roof water tanks.
Drainage construction sewage pipe network and rainwater pipe network to implement rain and sewage diversion system.
There are gas pressure regulating stations in the gas supply community that use urban pipeline natural gas.
Build 1 substation for power supply, and the power distribution cabinet is divided into two areas. Datong substation leads two 10KV cable loops for power supply.
Environmental protection engineering wastewater treatment septic tank treatment, separation tank discharged into Huainan first sewage treatment plant.
The sewage pipe network is connected with the municipal sewage pipe network.
The kitchen lampblack waste gas is treated by household lampblack machine.
The underground garage adopts forced ventilation, and restaurants and restaurants are equipped with oil fume purification devices according to their size.
Noise control adopts vibration reduction and sound insulation barrier,
Strengthen greening and other measures. The south side of Area B is 26 meters away from the railway line, and a vibration damping and sound insulation wall with a length of 360 meters from east to west and a height of 9 meters will be built.
Solid waste treatment and domestic waste classification treatment, each unit has several movable bins.
Landscape greening and other landscape design greening area 108400m2.
Waterscape design: artificial rockeries A and B centers take waterscape as the main landscape, and vegetation and trees are planted on both sides of the road.
- Previous article:How many years is the property right of Jining Phoenix Home?
- Next article:How is Tiexi Poly Xinyu Property?
- Related articles
- Where is Kaifeng Zheshang Central Plaza?
- Disinfection of property community
- What are the nationally recognized fire training institutions?
- Common sense assistance in buying and selling factories
- Who is responsible for the leakage of the main pipeline?
- When is the recruitment examination time for Lankao institutions?
- What about Shanghai Xinjie Real Estate Agency Co., Ltd.?
- What's the experience of working in university property?
- What is the standard of pool area in elevator room?
- Water is often cut off at home. What can I complain about?