What materials and documents should be handed over between real estate and property? Please make a detailed list. Thank you.
1, planning, construction and completion acceptance data
Notes on serial number data names
1 Community Master Plan
2 construction project planning permit
3. Construction project planning acceptance certificate
4. The building naming approval form
5 Report on Boundary Pillar Setting Point
6 construction project commencement permit
7 engineering quality assurance
8 residential instruction manual
9XX project housing traffic control list
10 handover list of public facilities and public places
1 1xx project water supply contract
12XX project power supply contract
13 postal application form
14 gas engineering quality grade certificate
15 site certificate of motor vehicle parking lot (garage)
16 fire control acceptance certificate of public security fire station construction project
17 construction project completion acceptance certificate
18 engineering quality grade verification certificate
2, property rights and physical takeover acceptance data
Notes on serial number data names
1 land use right transfer contract
2XX project handover certificate
3. List of handover, acceptance and handover of public facilities and sites.
4 * * * Equipment handover acceptance list
5XX project key transfer acceptance list
3, engineering drawings to take over the acceptance data
The name of the serial number material is called precautions.
1 greening scheme
2 Intelligent system completion drawing
3 building completion drawing
4 structural completion drawing
5 Water supply and drainage completion drawing
6 electrical completion drawing
7 curtain wall completion drawing
8 fire electrical completion drawings and materials
9 underground parking plan
10 outdoor water supply and drainage pipeline completion data
1 1 gas project completion drawing
12 elevator completion drawing
13XX project general construction drawing
14 construction drawing
15 structural construction drawing
16 air conditioning construction drawing
17 fire electrical construction drawing
18 water supply and drainage construction drawing
19 electrical construction drawing
20 weak current construction drawing
4, equipment technical data to take over the acceptance
The number of the material is called a note.
1 completion data of intelligent system (including fire fighting)
2 elevator system
3 Power transformation and distribution system
4 water supply and drainage system
5 air conditioning system
6 swimming pool equipment
- Previous article:Is Anqiu Lufeng Supermarket a chain?
- Next article:The girl named Feng's name is immortal. I recommended a girl named Feng.
- Related articles
- Is Yijing Wanjia Property OK?
- How to calculate the transaction tax of new houses in Nanjing Wuzhouxing Century Trade City? Is it near the subway station?
- What about Dalian Jiantai Steel Structure Engineering Technology Co., Ltd.?
- When will Overseas Chinese E-Kelanting Phase II 15 be delivered?
- How many families are there in Sanjiang Zun Garden in Ordos?
- What is the real estate for? What are the management responsibilities?
- What is the telephone number of the sales office of the upper courtyard of Fenghengjiang in Qiandongnan?
- What is the telephone number of the sales department of Sanming Ruyi Building?
- Which company is the developer of Tianlu House in Jiaozuo Country Garden?
- How many years is the property right of Taian Guo Yue?