Job Recruitment Website - Property management - How much is Shanghai Metro Line 6?

How much is Shanghai Metro Line 6?

The total investment of Shanghai Rail Transit Line 6 is 654.38+0.007 billion yuan.

Project Name: Shanghai Rail Transit Line 6 Project

Project Overview This project starts from Gangcheng Road, Puxing Road in the north and ends at Jiyang Road, Huaxia West Road in the south, with a total length of 3 1km. The north of Changdao Road Station adopts elevated type, and the south of Changdao Road Station (including this station) adopts underground type. There are 28 stations and 9 elevated stations on the whole line; Underground station 19.

The total investment of this project is 65.438+0.007 billion yuan, of which foreign exchange is about 72.55 million US dollars. The main sources of project income are as follows:

1. Project operating income, including ticketing income and advertising income; Two. Income from comprehensive property development along the line; Third, government subsidies.

The project will attract strategic investors to form a project company by attracting investment. As the main investor of this project, the project company undertakes the tasks of investment and financing, construction, operation management and comprehensive development and operation.

According to the tenth five-year plan of Shanghai rail transit, the construction period of this project is from 2002 to 2005, that is, it will be completed and put into production before the end of 2005, and the equipment will be commissioned and put into production in 2006. At present, the pre-feasibility study report of the project has been reviewed by the expert group organized by China International Engineering Consulting Company entrusted by the State Planning Commission, and the feasibility study report has been compiled, and the overall design unit of the project has been invited to bid.

Industrial road traffic

The total investment is 1000000 yuan.