What information do you need for completion acceptance?

The following materials need to be prepared for completion acceptance:

1, the completion acceptance report needs to be prepared, and the report needs to be stamped by the government department.

2. Need to prepare the project commencement permit.

3. Construction design drawings, construction reports and construction inspection proposal documents need to be prepared.

4. The completion report of the construction department needs to be compiled and signed by the head of the construction department.

5. It is necessary to have an evaluation report from the regulatory authorities or prepare a test report from the regulatory authorities.

6 planning documents that need the approval of the local planning unit.

7. Acceptance reports of local fire departments and environmental protection departments are required.

What is the process of house completion acceptance?

1. After the construction, submit the acceptance application and fill in the application form.

2. Internal preliminary acceptance. Engineers check the project, quality and safety engineers and technical engineers conduct internal preliminary acceptance and fill in the information.

3. Pre-acceptance. Professional engineers, internal and external supervision engineers, cost engineers, property management personnel, etc.

4. Formal acceptance. Engineers and external supervision engineers and owners for acceptance.

5. Review and appraisal. Quality inspection results and data shall be submitted to the government quality supervision departments and competent departments.

6. Sign and report the acceptance data. After the inspection, the quality inspection team will submit a report.

7, acceptance for the record. After passing the examination, the acceptance materials will be put on record.

What should be paid attention to in house installation and acceptance?

1, doors and windows shall be installed firmly, horizontally and vertically, with consistent height, flexible opening, and no jamming and rebound. Complete hardware accessories. The installation position of the door lock is accurate and the switch is flexible and effective. After the doors and windows are installed, the surfaces should be clean and large without any collision. The large surface of paint film should be smooth and free of pores. Curtain box, heating cover, skirting board, decorative line, etc. Exquisite wood products are firmly nailed to the base and will not loosen. Liner and panel are firmly bonded without delamination and bulging. The paint should be smooth and of the same color.

2. Hot and cold water switches, faucets and showers are installed accurately and flexibly. They can be opened and closed many times during acceptance, and the water flow changes with the size of the throttle valve. The drainage pipe should be unblocked, without slope and leakage, and the floor drain grate should be lower than the ground. At the time of acceptance, it should be filled with water and drained smoothly. Wall and floor tile paving should be smooth and firm, and local hollowing shall not exceed 5% of the total.