Job Recruitment Website - Property management - Taiyuan heating time
Taiyuan heating time
By June 65438+1October 65438+February, all thermal power stations (including Pingcheng District and Tongmei Group) have been equipped with heating conditions and started in stages according to the operation outline. In order to ensure timely heating in winter, the heating company is scheduled to inject water into the heating systems in all districts from June 5438+1October 65438+May. Residents should stay at home during water injection. In case of water leakage, contact the property in time.
Extended data:
Precautions:
The water in the heating system cannot be discharged for use: users can drain water for use privately, which will cause serious water shortage in the heating pipeline, make the pressure of the heating pipe network system unbalanced, lead to unstable heating in part or all of the heating system, and affect the normal heating of other users.
Precautions for users who apply for stopping supply: heat users who apply for stopping supply should promptly notify the thermal power to close the valve, and do not hold back the pressure to test the water, otherwise the water stored in the heating pipes and radiators will easily freeze and crack the heating pipes and radiators, bringing unnecessary losses to users and others.
People's Network-Suggestions on Changing the Heating Period
- Related articles
- What about the property of Ruifu in Shenyang Guorui City?
- Is the jewelry of the capital of the century credible?
- What is the address of another beautiful place in Xianyang Xinyuan?
- What if the top floor leaks?
- How to get to Guangzhou Toyota Motor Co., Ltd. by bus from Huadu District, Guangzhou
- Where is the beauty of the new city?
- Cure books suitable for college students
- How about Hohhot Jinhua Property Service Co., Ltd.?
- Where is Dongcheng District in Beijing?
- Which bus should I take to Changchun IKEA 7080?