How to deal with the problems found in the inspection of new property

For the problems found in the inspection, the general handling procedure is:

(1) Problems in collection and arrangement

Collect all property inspection records. Classify and sort out the contents of the Property Inspection Record Form and register the problems found in the inspection. Submit the sorted engineering quality problems to the construction unit for confirmation, and go through the confirmation procedures.

(2) Treatment method

After the construction unit sorts out the engineering quality problems, it will put forward the treatment methods. In the actual work process, the property management company can put forward corresponding rectification opinions while raising quality problems, which is convenient for the construction unit to carry out targeted rectification.

From the reasons and handling responsibilities, engineering quality problems can be divided into two categories: the first category is the quality problems caused by the construction unit. If it is found or occurs during the warranty period, the construction unit will urge the construction unit to be responsible according to the Measures for Quality Assurance of Construction Projects promulgated by the Ministry of Construction. Secondly, due to poor planning and design, there are problems such as insufficient functions, inconvenient use and uneconomical operation and management. The construction unit shall be responsible for modifying the design, transforming or supplementing the corresponding facilities.

(3) Tracking and verification

In order to solve the quality problems of property projects in a timely and satisfactory manner, property enterprises should do a good job in tracking and inspection.

The property management company arranges professional and technical personnel to be responsible for the engineering quality problems of different majors, conducts on-site tracking during the implementation of rectification, and carries out acceptance inspection on the completed rectification project, and goes through the acceptance formalities. Continue to urge the construction unit to deal with unqualified projects.