Job Recruitment Website - Property management - Template of Emergency Plan for Water and Power Shutdown in Factory (5 pieces)
Template of Emergency Plan for Water and Power Shutdown in Factory (5 pieces)
1 template of emergency plan for water supply and power failure of the plant I. purpose
In order to prevent people from being hurt by sudden power failure in shopping malls and ensure the safety of goods.
Second, the scope of application
Suitable for shopping mall properties in this area.
Three. accountability
1, high-voltage power distribution engineers are responsible for understanding the reasons for power failure, and timely notifying the monitoring center and important tenants to do a good job of sending standby power and restoring normal power supply.
2. The monitoring personnel are responsible for explaining the reasons for power failure, closely monitoring key parts, and cooperating with security personnel to prevent personal injury and loss of articles.
3. The security personnel are responsible for the security work of the entrances and exits and the public security patrol work in the power outage area, and cooperate with the floor management personnel to do a good job in the evacuation of customers and the safety of goods.
4. Managers should organize, coordinate and deal with the aftermath.
5. Floor managers and shop assistants should do a good job of guiding customers to evacuate to ensure the safety of goods in the merchant's cabinet.
Fourth, the processing flow
(1) Electric power emergency procedures:
Engineering measures
2. Safety measures
Be reasonable after doing good.
(2) Emergency treatment plan for power failure:
1. When there is a power failure accident in the shopping center, the engineering technical director must immediately go to the high-voltage distribution room, and the on-site (on duty) high-voltage distribution technicians should take the following measures in time:
1. 1 belongs to the power outage in the shopping center area.
1. 1. 1 Maintenance technicians will inform the monitoring center of the power outage area and situation while checking the equipment failure of the shopping center, so as to take relevant measures. (Important tenants in the power outage area should also inform them at the first time).
1. 1.2 Go to the power outage area and check the cause of the failure. Check the running status of the equipment, record the working parameters, and turn off the electromechanical equipment or the heavy-duty electricity-using unit to avoid the damage of the instantaneous current to the equipment when the power supply is restored.
1. 1.3 After finding out the fault, the engineering department will organize manpower to repair it.
1. 1.4 At the same time, the normal operation of the undamaged area should be restored.
1.2 power failure caused by external power supply (high voltage power loss)
1.2. 1 Start the standby power supply of the shopping center (under normal circumstances, the main and standby power supplies are automatically switched), and the power supply of the fire elevators, fire walkways, water pumps, evacuation lighting and other important parts must be guaranteed.
1.2.2 technicians call the power supply department to inquire about the cause of the failure and save the reply.
1.2.3 notify the monitoring center and important tenants.
1.2.4 organize personnel to inspect and maintain facilities and equipment before power supply is restored. (See Annex I for specific operations)
2, property personnel safety measures are as follows:
2. 1 monitoring and safety personnel
2. 1. 1 After receiving the power outage reason (or after finding and receiving the power outage report), notify the property management personnel and project supervision in time.
2. 1.2 Focus on monitoring power outage areas.
2. 1.3 notify the security supervisor (personnel) to rush to the power outage business area immediately and strengthen the care (especially the cashier). (The personnel transfer shall be the unified responsibility of the safety supervisor)
2. 1.4 when necessary (after the total value is confirmed), notify the personnel present through the fire broadcast. (The specific content should be confirmed by the total value).
2. 1.5 maintain order, strengthen patrol in power-off areas, control personnel to enter and exit, and close access channels when necessary (total value confirmed).
2. 1.6 after receiving the evacuation decision, assist the property management personnel and floor management personnel to guide the shoppers and VIPs present.
2.2 Property management personnel
2.2. 1 rushed to the scene at the first time after receiving the power outage report.
2.2.2 Organize and coordinate on-site work and decide whether to evacuate (total reported value to be determined).
2.2.3 In case of power failure, if the operators need special services, the management personnel should provide necessary services, such as transporting the wounded.
2.2.4 In case of personal injury and damage to facilities and equipment, apply to the insurance company for compensation in time.
3. Floor managers, shop assistants and cashiers have the following safety measures.
3. 1 In case of power failure, keep calm, avoid leaving the business site, and ensure the safety of articles and property.
3.2 When necessary, notify the customer to suspend business.
3.3 After receiving the evacuation notice, guide the customers to take the safe passage to leave the mall.
3.4 After the power supply is restored, assist the management personnel to do the inventory work.
(3) Matters needing attention in emergency treatment of power failure:
1. In case of power failure, it is necessary to verify whether there are passengers trapped in the elevator, and if necessary, carry out rescue according to the emergency plan for people trapped in the elevator.
2. The electrician should check the telephone, weak current monitoring, fire control and other systems to make them in normal working condition.
3. The power provided by the standby power supply in the shopping center cannot meet the normal operation needs, and the lighting in the secondary places may be insufficient. Property personnel should pay close attention to the traffic conditions on sidewalks and lanes, and place lighting objects and warning signs when necessary to facilitate pedestrians.
4. In the absence of emergency lights, staff in secondary positions such as cleaning should escort guests in and out with flashlights under the unified coordination of the property manager.
5. The management department should adjust the personnel access route in time.
Template of Emergency Plan for Water and Power Shutdown in Factory Part II 1. Objective: In order to better cope with sudden water and power failure and avoid unnecessary losses.
Scope of application: all staff of radiology department.
Third, the standard:
(1) Power failure
1. In case of unexpected power failure, immediately notify the currently examined patients, and use emergency facilities such as flashlights and emergency lights to ensure the safety and evacuation of the currently examined patients, and do a good job in patient comfort and explanation.
2, immediately turn off the power of all kinds of electrical equipment, at the same time, call the hydropower group personnel on duty to understand the reason and duration of the power outage.
3, according to the possible power outage time, properly arrange patients waiting for examination.
4, timely report to the department head, and do a good job of related succession.
5. Confirm that the power supply is back to normal. After the voltage is stable, restore the power supply of all equipment that should operate normally according to the operating procedures.
6, found that equipment failure caused by sudden power failure, timely notify the equipment department and the medical engineering department, and report to the department head.
(2) Emergency procedures for temporary power failure
(1) When there is a temporary power outage, you should immediately call the hydropower unit to find out the reason and duration of the power outage.
(2) Inform the emergency team leader or shift supervisor to explain the situation.
(3) If the power outage is short (within 5 minutes), the patient should be informed and wait patiently for the power supply before turning on the equipment.
(4) If the power outage lasts for a long time (more than 5 minutes), after starting the standby generator, ensure the power supply of the whole hospital; All large equipment in the department can be turned on and run normally only after normal power supply.
(5) Make operation records of standby second power supply and self-provided power generation.
(6) When there is a power outage due to internal reasons in the hospital, it is necessary to find out the cause of the power outage, whether it is a high-voltage circuit or a low-voltage circuit. If the high-voltage circuit fails, contact the emergency repair team of the power supply department in time to recover as soon as possible to ensure power consumption; If the hospital low-voltage circuit fails, the reason should be found out quickly and the circuit should be restored according to the operating procedures.
(3) Stop water supply
1, do a good job of emergency water supply in time when water is cut off, and turn off the power of all water heaters in the department in time to avoid burning out the water heaters due to water cut off.
2. Immediately call the personnel on duty of the hydropower group to find out the reason for the water cut.
3. Store proper amount of water for washing hands.
4, return to normal water, to check the department faucet, prevent water overflow and waste.
Template of emergency plan for water supply and power failure in factory. 3 I. Purpose
In order to ensure that the rescue work can be carried out quickly and effectively in the process of tower crane hoisting, and to minimize the risk of mechanical injury, the project department has specially formulated an emergency treatment and rescue plan.
Second, organization.
The project department set up an emergency rescue command team to be responsible for command and coordination.
Team leader:
Members:,,,,
Three. accountability
1. Be responsible for on-site command, understand the lifting height and boom position of tower crane, and organize on-site rescue work.
2. Responsible for on-site protection, set up a cordon, maintain order and evacuate personnel.
3. Be responsible for notifying the equipment unit to organize rescue, calling rescue personnel, and eliminating the danger safely in time.
Fourth, emergency rescue procedures
When the tower crane suddenly encounters power failure (for a long time) during normal operation, the hanging objects are suspended in the air. And the time is long, the following emergency measures should be taken:
1. Turn all controllers to "0" position and disconnect the main power supply.
2. The professional maintenance personnel intermittently open the brake of the hoisting winch or open the switch handle by hand, so that the hoisted object can descend a short distance at a time, and the descending speed shall not exceed the rated speed, and finally the hoisted object will fall to the ground.
3. If there are obstacles and houses under the suspension, the following measures should be taken:
(1) According to Article 2, first lower the suspended object to a safe distance above the object or house, and then take measures to brake the slewing device or pull the wind rope to prevent it from rotating under the action of wind;
A. Turn the boom of the tower crane to an open place, or to a safe part of the building, or temporarily put it on a steel platform that can bear the tonnage of the hanging object and monitor it, brake the rotation, set up a warning line, and then operate according to Article 2;
(2) Set a warning zone below the hanging object, and assign special personnel to monitor it, so as not to let people walk or work under the hanging object;
(3) If the office area is under the hanger, the office personnel under the hanger must leave temporarily and take measures according to the method in (2);
(4) If there is a residential building below the hanging object, the project department will persuade the residents in the house below the hanging object and take temporary evacuation measures;
(5) After connecting the power supply, conduct a comprehensive inspection, and then transfer the object to the designated place to descend.
4. Immediately organize safety self-examination and self-correction, eliminate hidden dangers and ensure construction safety; By analogy, immediately organize all construction personnel to carry out safety re-education, improve safety awareness, obey the rules and discipline, and prevent similar accidents.
5. In the process of emergency rescue, in case of falling accident, the Emergency Treatment and Rescue Plan for Falling Accident shall be implemented immediately.
Verb (abbreviation of verb) related mailing address
1. Company Tel:
2. The engineering management department telephone:
3. Phone number of the equipment unit:
4. Project Manager: Mobile phone or telephone:
Deputy Project Manager:
Project Engineer:
Builders:
Security officer:
Materials and equipment members:
Attach the address of a nearby hospital:
Please refer to the catalogue of characteristic hospitals for industrial accidents (please choose according to the actual situation of the project)
Template of emergency plan for water supply and power failure in factory. 4. Purpose of formulation
In order to deal with the sudden large-scale power outage accident in the hospital, quickly and orderly organize the restoration of power supply, ensure the safety of patients, reduce property losses, ensure the smooth use of electricity in the hospital, and promote the institutionalization and standardization of accident emergency work, this plan is formulated in accordance with relevant national laws and regulations and the actual situation of our hospital.
area of application
The term "sudden large-scale power outage accident" as mentioned in this plan (hereinafter referred to as "large-scale power outage accident") refers to an accident in which important facilities are damaged or destroyed due to serious natural disasters, the security line of large-scale power system in the whole hospital suddenly fails, and the power grid collapses or collapses in a large area.
Three urgent principles
The principle of "prevention first and constant vigilance" and the principle of "unified leadership, perfect mechanism, clear responsibility, strengthened cooperation, quick response and decisive measures" are implemented in dealing with large-scale power outage accidents.
Four organizations
The hospital has set up an emergency leading group for large-scale power failure accidents and an emergency repair team.
1 Emergency Leading Group for Large-scale Blackout Accidents in Hospitals
Team leader: general manager
Deputy Head: Dean
Member: Manager of Personnel Administration Department
Logistics Supervisor
Electrical maintenance worker
Responsibilities:
(1) Do a good job in the daily safety of electric power maintenance technicians, implement the responsibility system for production safety, and prevent large-scale power failure accidents.
(2) In case of large-scale power failure, do a good job in emergency treatment of power failure and restore power supply as soon as possible.
(3) According to the severity of the large-scale power failure accident, decide to start and terminate the emergency plan.
(4) Report the accident to the superior in time and make it public.
(5) Request external support when necessary.
(6) The leader of the leading group is the first person responsible for fulfilling the provisions of this plan. Under the unified command of the leading group, member units should carry out their duties and cooperate with each other to do a good job in social comprehensive emergency work in case of large-scale power failure.
2 emergency maintenance teams
Captain: logistics supervisor
Member: Electrical Maintenance Worker
Responsibilities: Organize personnel to carry out rescue in case of accident; Report the accident to the command group, send help to the power supply department if necessary, and then summarize whether it should be a circuit or a low-voltage circuit. If the high-voltage circuit fails, the hospital electric power maintenance technician will immediately introduce the standby power supply, and should contact the emergency repair class of the power supply department in time to restore as soon as possible to ensure power consumption; If the hospital mortgage circuit fails, it is necessary to quickly find out the reason and restore the circuit according to the operating procedures.
(2) Emergency procedures of hospital departments
1 after receiving the power outage notice, all departments should cut off all power supplies and put them into use after the circuit returns to normal.
After receiving the power outage notice, immediately prepare for the power outage. If there is a rescue patient, use the backup power supply.
Immediately after the sudden power failure, find the power method to rescue the patient and its operation, maintain the rescue work, and turn on the emergency light. And shall immediately notify the electric maintenance technician or the first mate.
4 critically ill patients who use a ventilator during surgery should usually place a simple ventilator next to the machine. Once the power is suddenly cut off, the medical staff will immediately disconnect the ventilator and use a simple respirator to maintain breathing. For patients who use electric nitrogen absorption, use a 50ml syringe to connect the nitrogen absorption tube to absorb nitrogen.
5. If the two lines suddenly lose power, the medical staff must first ensure the patient's rescue, and then the hospital's generator supplies power; Nurses should be calm. Those who go to the ventilator should hold the ball in their hands, those who go to the monitor should measure their blood pressure and pulse manually, and those who suck nitrogen electrically should take a 50 ml syringe and suck it with a nitrogen suction tube. Observe carefully and ask for change. The remaining employees should immediately call the power maintenance technician and the personnel administration department, and use emergency lights for lighting.
6 Strengthen ward patrol, appease patients and pay attention to fire prevention and theft prevention.
After the elevator encounters a sudden power failure, the logistics personnel should do a good job of passengers' ideological work, call outside and let all passengers out manually.
safeguard measure
1 the electric power maintenance technician should do a good job in the daily maintenance of the generator to ensure that the generator is put into use at any time.
2 Electric power maintenance technicians should master power supply knowledge and operation specifications at ordinary times, and pay attention to operation safety.
3. Clinical departments are routinely equipped with emergency lights, flashlights and other lighting equipment, which are regularly checked and kept in good condition.
The logistics department should organize emergency power failure drills, twice a year 1-2 times. Through drills, be familiar with the emergency treatment process of sudden power failure to ensure the safety of patients.
Circuit or low voltage circuit. If the high-voltage circuit fails, the hospital electric power maintenance technician will immediately introduce the standby power supply, and should contact the emergency repair class of the power supply department in time to restore as soon as possible to ensure power consumption; If the hospital mortgage circuit fails, it is necessary to quickly find out the reason and restore the circuit according to the operating procedures.
Encyclopedia of templates for emergency plans for water and power cuts in factories 5 < 1 > Leading organizations
Commander-in-Chief: day shift; Night shift: cadres on duty
First, the deputy director refers to the composition and responsibilities of emergency rescue.
Deputy commander:
Team members:
< 2 > responsibility
1, chief commander: responsible for organizing and directing the emergency rescue of the whole plant;
2. Deputy Commander-in-Chief: responsible for assisting the commander-in-chief in the specific command of emergency rescue;
3. Team members: working under the unified command of the headquarters, the responsibilities of each section chief in accident emergency rescue are:
1. Steelmaking foreman: responsible for the on-site command of the steelmaking section;
3. Continuous casting foreman: responsible for the on-site command of continuous casting section;
4. Mechanic foreman: assist the general commander in charge of the on-site command of emergency repair work;
5. Electrical maintenance foreman: assist the general commander in charge of the on-site command of emergency repair work;
6. Peripheral foreman: assist the general commander in charge of the on-site command of emergency repair work;
7. Engineer: responsible for the technical guidance of the emergency repair site;
Second, the emergency communication:
When dealing with accidents, all personnel involved in emergency rescue and emergency repair should keep communication open. If the signal is unstable or interrupted, they should immediately use the fixed telephone or mobile phone in the factory to get in touch with the chief commander in time and clearly state their position.
Third, the accident treatment plan:
1. When there is a power failure accident, the water pump owner controller should not panic, but should be calm. The south security water tower can supply water for about 15 minutes. In the meantime, the main controller can completely restart the water pump after sending electricity.
2. Under normal circumstances, the diesel engine can start automatically after the power failure in the North District. The owner controller of the water pump only needs to press the button combining the clutch on the operation panel of the control box, and then press and hold the speed-up button until the speed displayed on the speedometer no longer rises;
3. If the diesel engine can't start automatically, press the reset button first. If it still doesn't work, turn the transfer switch to the manual position. At this point, the diesel engine can be started as long as the finger presses the start button.
4. After the diesel pump is successfully started, the main control room of the water pump room shall immediately report the situation to the shift supervisor and notify the converter main control room and the continuous casting main control room.
5. After receiving the alarm call from the water pump room, the converter master control room should immediately stop smelting with guns, and immediately notify the shift supervisor of the situation, who will report to the superior.
6. After receiving the alarm call from the water pump room, the continuous casting master control room should pay close attention to the quantity of secondary cooling water and try to finish the molten steel in the ladle as much as possible.
7. After the diesel engine is started, the chief engineer of the water pump room can appropriately adjust the manual valve at the entrance to increase or decrease the water pressure, so as to achieve the safe water use required by the equipment.
Four. Preventive measures and assessment
1, the chief engineer of the water pump room should closely monitor the water level of the safety water tower in his usual work, and report to the shift supervisor immediately if there is any abnormality, so as to timely handle and eliminate hidden dangers;
2, safety water tower outlet pipe manual valve should be observed at any time, in case someone misoperation;
3, each shift personnel to patrol the diesel engine operation box panel switch, indicator light. For example, the selector switch should be in the automatic position; Turn on the power key switch; Whether the float indicator light is on, whether the alarm light is on, and reset it in time.
Company's Emergency Plan II for Sudden Water and Power Cut-off
1. After receiving the notice of power outage and water stoppage, the security department and the engineering department should inform all departments in advance of the power outage and water stoppage line, area, time, elevator use and safety precautions, and issue the notice of power outage and water stoppage at the main entrances and exits; At the same time, engineers should do emergency work before power failure and water supply.
2. Without receiving any notice, the engineer should immediately confirm whether it is an internal fault power outage or an external power outage. If it is an internal fault of power failure and water cut-off, immediately send someone to find out the reason and take measures to prevent the fault from expanding; In case of external power failure and water cut-off, on the one hand, it is necessary to prevent accidents caused by sudden call and water cut-off; on the other hand, it is necessary to call the electric power bureau or water supply company to inquire about the situation of power failure and water cut-off, know when to resume power supply and water cut-off, and inform DM of the information to prepare for DM consultation.
3. The inspectors shall immediately go to each floor with the engineers to check the elevator operation, and immediately rescue the elevator personnel according to the emergency plan of the trapped elevator.
4. The Engineering Department immediately notified all departments of power failure and water cut, and issued a notice of power failure and water cut at the main entrances and exits. When necessary, the emergency broadcast system will be activated to inform residents and ask them to remain calm and take preventive measures.
5. In case of sudden power failure, when the mall is open at night, patrol personnel should assist the mall to maintain good order, guide merchants to use emergency lighting and other standby lighting to evacuate customers, and pay attention to fire prevention to prevent fire.
6. Arrange employees to the main entrance and exit of the community and the elevator hall to maintain order, and patrol personnel to strengthen security measures to prevent people from creating chaos, fish in troubled waters, and close the door when necessary.
7. Send people to guard the office and duty room, patiently receive inquiries from residents and merchants, do a good job of explanation and guidance, and prevent conflicts with residents and merchants.
8. Record the time, causes, countermeasures and losses caused by power failure and water cut-off accidents in detail.
9. Preventive measures for sudden power failure:
1) Engineers should always check the emergency lighting and emergency broadcasting system to ensure normal operation.
2) The management and operation department should remind office residents and merchants to prepare some emergency lights or candles to prevent power failure.
3) In addition to flashlights, the security department and the engineering department should also be equipped with portable emergency lighting for patrol and maintenance, and they should be charged and maintained at any time to keep them in good condition.
10. Emergency measures for sudden water stop:
1) Engineers should always check the water supply pipes and valves, and repair them in time if any abnormality is found.
2) When water is suddenly stopped, on-site protection measures should be taken to avoid accidents.
3) After the water is suddenly stopped, you should contact the water supply company to do a good job in daily water supply. In case of small-scale water cut-off, the property service center shall promptly ensure that the owner can solve the problem of normal domestic water use.
Company's Emergency Plan for Sudden Water and Power Cut-off 3
I. Power failure
(a) the logistics management office received a notice from the relevant departments about power failure and water cut, asking about the time of power failure and water cut;
(two) the logistics management office shall promptly notify the person in charge of each canteen and booth;
(3) The Logistics Management Office shall report to the leaders in a timely manner.
Second, power generation.
The logistics electrician immediately uses the generator to generate electricity to ensure the normal use of electricity in the canteen.
Third, post a warm reminder to inform teachers and students to stop water and electricity, and remind teachers and students to bring change to eat.
Fourth, canteen food processing.
If there is a plan to cut off power and water:
(a) electricity and water for breakfast:
(1) The night before yesterday, water was prepared in a container to make steamed buns, and the next morning, it was steamed with a diesel stove. (2) Provide fried powder, fried rice, cooked noodles and porridge as much as possible; (3) Provide eggs and milk.
(2) Power failure during lunch and dinner:
(1) Rice: Cook the rice in advance; (2) Dishes: arrange cooking according to the power generation time of the generator; Stir-fry with a coal-fired stove or a briquette stove.
In case of sudden power failure:
(a) breakfast power failure:
(1) Hand-wrapped buns and cooked in a diesel stove; (2) Provide fried powder, fried rice, cooked noodles and porridge as much as possible; (3) Provide eggs and milk.
(2) Power failure during lunch and dinner:
(1) rice: arrange steamed rice in time after the generator generates electricity; (2) Dishes: After the generator generates electricity, arrange cooking in time or use coal steam furnace or briquette furnace for cooking.
5. Food sales. Teachers and students can buy meals in cash.
- Related articles
- Where is the second phase resettlement house of Wolong Lake in Zigong?
- Anyang normal College students want to rent a house.
- How about Tianjin Tianshan Real Estate Development Co., Ltd. Xiaozhan Milifang Branch?
- Why does Nan 'an Tea Garden New District have great development potential?
- What is the telephone number of Xiamen Zhonghai International Trade Shangcheng Sales Office?
- Other information of Beijing urban construction electric power
- How about Guangzhou Jia Wei Property Management Co., Ltd.?
- Jiangshan Duojiao Property Management Fee
- Is Zhanjiang Jinxiu Home Worth Buying?
- Brief report on comprehensive improvement of environmental sanitation