Client (hereinafter referred to as Party A):

Trustee (hereinafter referred to as Party B):

Party A entrusts _ _ _ _ _ _ _ _ _ _ _ to design and construct the interior decoration of the existing house/club/office building. according to

People's Republic of China (PRC) contract law "and the Ministry of construction" family room decoration management pilot scheme ",combined with this work.

Regarding the details, both parties have reached the following agreement:

I. Overview of the Project

1. Project name: home decoration

2. Project location:

3. Project content: subject to the items listed in the quotation sheet.

4. Construction method: A. Single contractor B. Contractor and accessories C. Contractor and materials.

5. Construction period: The project started on, and was completed on.

6. Contract price (RMB in words).

Two. Party A's responsibilities

1. Before the project starts, confirm the decoration design and construction description of the project to Party B, and sign the drawings and quotation for approval;

Remove obstacles that affect the construction, and take protective measures for furniture and furnishings stranded in houses that can only be partially vacated; Xiangyi

Party A shall provide the water and electricity needed for the construction, and explain the matters needing attention; Go through all kinds of examination and approval procedures involved in the construction and pay for the materials.

Company expenses and decoration deposit.

2. Be responsible for examining and approving the changes, additions and alterations agreed by both parties, and paying the project funds for the changes, additions and alterations according to the schedule.

3 to determine the need to dismantle the original building structure or equipment pipeline, responsible for the corresponding examination and approval procedures with the relevant departments and pay the fees.

Related expenses; If Party A agrees or requires Party B to dismantle or change the original building structure or equipment pipeline without going through any formalities.

The losses or accidents here shall be borne by Party A. ..

4. Cooperate with Party B in site security, fire fighting and garbage disposal, and coordinate neighborhood relations.

5. Party A shall be responsible for the pipeline blockage, water leakage, power failure and damage of adjacent residential buildings caused by Party A..

Repair and compensation.

6. The quality of materials purchased by Party A shall be recognized by both parties, otherwise Party A shall be responsible for the economic losses caused thereby.

The arrival date of materials must meet the requirements of Party B's construction progress, and Party A shall be responsible for the losses caused by the delay.

For the goods purchased by Party A, Party A shall bear the warranty expenses.

7. Party A shall send representatives to the construction site to be responsible for the performance of the contract, and supervise and inspect the quality and progress of the project.

Check, handle acceptance, registration and other matters.

8. For the project directly contracted by Party A, Party B has the obligation to cooperate with other construction parties to ensure the quality and smooth progress of the project.

It's done.

Three. Party B's responsibilities

1. Assist Party A to determine the decoration design and construction instructions, draw up the construction progress plan and submit it to Party A for approval. Purchased decoration

The use of main materials shall be approved by Party A in advance; Assist Party A to handle the check-in formalities according to Decree No.90 of Shenzhen Municipal People's Government.

The order stipulates that the decoration deposit and the worker's pass fee should be paid to the property.

2. Appoint Party B's representative on the construction site to be responsible for the performance of the contract. Organize the construction with good quality and quantity as required,

Finish the construction task on time. Solve all matters that Party B is responsible for.

3. Strictly implement the construction specifications, safety operation procedures, fire safety regulations and environmental protection regulations. Construction in strict accordance with the drawings

Construction work instructions and engineering changes during construction shall be submitted to Party A for approval in advance before construction. Participate in completion inspection

Collect and prepare project settlement documents.

4. Abide by the regulations of relevant departments on the management of the construction site, and do a good job in the security and garbage disposal of the construction site. And coordinate at the same time.

Well, the problem of disturbing the people caused by construction.

5. In the process of construction, the original building structure and various equipment and pipelines shall not be dismantled at will without the consent of Party A or the approval of relevant departments.

Otherwise, bear all the consequences.

6. Party B shall be responsible for pipeline blockage, water leakage, power failure and damage to articles. Damage to adjacent residents' houses due to Party B's reasons.

Responsible for repair and compensation.

7. Before the completion of the project is handed over to Party A, be responsible for protecting all facilities and building products on site.

8. Party B inspects the house for Party A, and the qualified house inspection indicates that Party B recognizes the quality of the house that Party A appears during Party B's construction.

Quality problems such as water, electricity and hollowing should not be passed on to Party A, but should be solved by themselves or through consultation with the Property Management Office.

Absolutely.

9. All labor tools related to this contract shall be provided by Party B. ..

10. Party B shall introduce the progress of the project at least three days in advance, as well as the items that Party A needs to purchase and the cooperation services that Party A needs to provide, including

Including on-site assessment and supervision.

Four, project quality, time limit for a project, warranty and liability for breach of contract

1, this project is based on the construction drawings, quotation, project supplement and modification, and code for construction and acceptance of architectural decoration engineering (JGJ73-

9 1) or "Shenzhen family decoration engineering quality standard" and other national construction and acceptance standards are the quality evaluation acceptance standards.

2. If the construction period is affected due to Party A's failure to fulfill the obligations stipulated in the contract, or the quality of materials and equipment provided by Party A is unqualified, Party A shall take the following measures.

If the project quality is affected and the construction period is delayed due to Party A's temporary change of drawings, the cost of rework shall be borne by Party A, and the construction period shall be postponed.

Subject to "List of Project Additions and Changes".

3. In case of quality accidents caused by Party B, the cost of rework shall be borne by Party B, and the construction period shall not be postponed.

4, power failure, water cut and force majeure factors not caused by Party B, resulting in shutdown for more than 8 hours (accumulated within one week

Calculation), the construction period shall be postponed accordingly.

5. In case of shutdown due to Party A's reasons, Party A shall compensate Party B for the losses caused by shutdown or slowdown. Every time you shut down or build a nest

Party A shall pay Party B RMB for one day's work. If Party A fails to allocate the project payment according to the contract, it shall pay the project payment for each day overdue.

Pay a late fee of 10%.

6. If the completion is delayed due to Party B's reasons, Party B shall pay Party A a penalty of RMB 65,438+000 for each day of delay. If Party A requires it during the contract period,

Party A shall pay Party B RMB 65,438+000 as a reward for completing the project ahead of schedule, in addition to overtime pay.

7. If Party A uses it in advance or uses it without going through the acceptance formalities, the losses caused shall be borne by Party A..

8. If the contract cannot be continued due to unilateral reasons, it shall notify the other party to handle the contract termination agreement, and the responsible party shall compensate the other party.

The resulting economic losses.

9. Party B shall guarantee the project quality within two years from the date of acceptance. That is, materials purchased or built by Party B within two years.

If the materials cause quality problems, Party B shall be responsible for free maintenance; In case of problems caused by improper use or procurement of materials by Party A within two years, then

Party A is responsible for the purchase cost of maintenance materials, and Party B does not bear the labor cost of maintenance.

Verb (abbreviation of verb) supplementary clause

1. This contract is made in duplicate, each party holds one copy, which has the same legal effect.

2. This contract shall come into effect as of the date of signing, and the three-year warranty period shall be terminated from the date of project completion/delivery, and the contract shall be terminated automatically.

Stop.

3. The following attachments are an integral part of this contract (effective at the same time as this contract).

①. Construction drawing

(2). The project quotation

(3). Engineering addition and modification list

(4) written approval by both parties.

Special agreement on intransitive verbs

Party A and Party B agree that:

1. Check the water and electricity before entering the site. After entering the site, water and electricity cannot be cut off. Party B shall be responsible for the damage.

2. Please don't cook in the room. If there is any accident, Party B will be responsible.

3. There can be no joint in the electric tube, and there can be no joint between tubes. Find the connector of the last junction box.

4. After Party B completes the construction, Party B shall deliver 1 copy of Party A's hydropower construction drawing or hydropower transformation picture.

5. After the waterproofing is accepted by Party A, porcelain can be pasted.

6. Right live wire and left zero wire of socket.

7. The fire line is red, the zero line is black, and the ground line is green and yellow.

8. The settlement price of the project shall be calculated according to the actual completed quantities, and the overpayment shall be made and the underpayment shall be made.

9. The hydropower project is guaranteed for three years.

10. For the materials purchased by Party A, Party B shall submit a list to Party A in writing three days before use.

1 1. After the contract is signed, Party B shall not unilaterally add or subtract items.

12. After the contract is signed, Party B shall not raise the project price without changing the project for any reason.

Seven. comment

1. The parts not covered or detailed in this contract shall be subject to the regulations of the government or relevant industry authorities.

2. All disputes arising from or related to this contract shall be settled by both parties through friendly negotiation. If negotiation fails, it can be submitted to Shenzhen Arbitration Commission.

The arbitration will be conducted in accordance with the current effective arbitration rules of the commission, and the award is final and binding on both parties.

3. Matters not covered in this contract shall be negotiated separately by both parties. Other written documents formed through negotiation are supplementary parts of this contract, which are the same as this contract.

Both have the same effect.

VIII. Terms of Payment Agreement

The project payment paid by Party A to Party B shall be completed in the following five times:

After signing the contract, Party A will pay 10% of the total project cost in advance as the decoration deposit (which will be included in the project cost);

Construction started, and 40% of the total project amount will be paid as the first batch of materials after the completion of hydropower transformation;

After the completion of carpentry, the painter pays 30% of the total project cost as the second batch of materials;

Pay15% of the total project cost after the completion of construction and acceptance;

Within one month after acceptance, Party A shall pay the balance of 5% in one lump sum.

Party A: Party B:

ID number: ID number:

Tel: Tel:

Email: Email:

Address: Address:

Year, month, year, month, year