Flow chart of ashes decoration
I. Pre-construction (about 30 days)
1, house inspection, house repossession (three copies and one certificate: house quality guarantee | residential instruction manual | building engineering quality certificate | comprehensive acceptance certificate for real estate development and construction project completion)
2, find the construction party (decoration company | construction team | find their own workers)
3. Correct decoration method (full package | half package | clear package)
4. Commencement disclosure (confirm which walls need to be demolished, and confirm the location of water, electricity and furniture)
Precautions:
(1) Fully communicate with designers according to their living habits;
(2) Make a decoration budget table, the more accurate the budget is, the less the budget will be overspent in the later period;
(3) Make a material schedule, and advocate materials should be purchased in advance in stages.
Second, the demolition stage (about 15 days)
What did the decoration company do:
1, shovel the wall skin 2, dismantle 3, build a wall 4, seal the balcony 5, clean up the garbage 6, and measure the cabinet about one foot.
Ready to buy materials:
1. Central air conditioning, floor heating, fresh air, water purifier (choose and pay the down payment before construction, and make an appointment for the construction door-to-door time).
2. Safety doors and windows
3. Customized cabinets and wardrobes for the whole house
What I want to do is:
1, contact the vehicle to clear the construction waste.
2, confirm the floor heating shop is stuck
3. Determine kitchen appliances (determine the model and size of embedded appliances in advance)
Precautions:
(1) Do a good job in floor drain protection to prevent construction waste from blocking the sewer;
(2) Install water purifier, water dispenser, garbage disposal, etc. Be together;
(3) The pre-demolition stage that requires the cooperation of intelligent equipment in the whole house;
④ Plan the layout of switch sockets.
III. Hydropower transformation (about 15 days)
What did the decoration company do:
1, water and electricity disclosure
Step 2 punch holes
3, water circuit laying
4, wall drainage water transformation
5, embedded faucet
Step 6 punch holes
7, toilet backfill
8, the kitchen and bathroom waterproof
9, central air conditioning, floor heating installation
Ready to buy materials:
1. Interior doors, kitchen sliding doors and bathroom door.
2. Shower room, shower room water bar 3
. Wall/floor tiles
4. Floor drain pipe
5. Threshold and sill stones
What I want to do is:
1, do a good job of acceptance after the completion of hydropower.
2. Contact the window dealer and the cabinet dealer to measure the size at home.
3. Take photos to record the location of water and electricity to prevent later maintenance.
Precautions:
(1) in the early stage of hydropower, it is cheaper to buy a floor drain online;
(2) The owner, designer and long-term worker are required to be present when confirming the hydropower station, which will be marked with chalk after completion.
Fourth, the bricklayer stage (about 30 days)
What did the decoration company do:
1, tile exists
2, bricklayer clarificaiton
3, grassroots processing
4. Tile laying
5. Install floor drain/lintel/sill stone
6. Beautiful sewing (one week after tile laying)
7, ceramic tile ground protection
8, the whole house custom scale
Ready to buy materials:
1. Sealant and dustproof protective film
2. Wood flooring
3. Plaster line
4. Aluminum gusset ceiling
5. Downlight, spotlight, linear light trough
6. Bathroom Yuba, kitchen cool bully, etc.
What I want to do is:
After the tiles are pasted, make an appointment with the whole house custom merchants, interior door merchants and shower room merchants to re-measure the size.
Precautions:
(1) closed water test (48 hours). The owner needs to greet the neighbors downstairs in advance and inform the property;
(2) ceramic tile acceptance, counting the number, open the check whether it is correct and flat; If bricks need to be butted, make it clear.
Five, woodworking stage (about 25 days)
What did the decoration company do:
1, woodworking base
2. The ceiling of the whole house (curtain groove is reserved)
3. Special type
4, lamps and lanterns embedded
5, pipeline embedded
6. Position and size of lamp hole
7, measuring door
8. Install range hoods, stoves and sinks.
9, woodworking acceptance
Ready to buy materials:
1. wallpaper (on demand)
2. Wall paint (one bottom and two sides)
3. Grounding protective film
Precautions:
(1) Check the material for cracking; ② Brush moisture-proof paint; ③ Try not to do it in wet weather; ④ Buy range hoods, cookers, vegetable pots, dishwashers, etc. In the kitchen, and measure the size of various kitchen appliances in order to maintain a good position in the later cabinets; ⑤ Measurement orders for cabinets, interior doors and customized products.
Six, petroleum engineering stage (about 15 days) decoration company:
1, wall treatment
2, determine the wall material
3, grinding acceptance
4. Color painting
What I want to do: make an appointment in advance to install the customized cabinets, interior doors, floors and skirting lines in the whole house.
Ready to buy materials:
1. Switches and sockets
2. Whole house lights
3. Sanitary ware: toilet, shower, bathroom cabinet, sink and faucet.
4. clothes rack
5. Angle valve
6. Glass glue
Precautions:
(1) determine the type of wall paint (decide whether to use latex paint or art paint), determine the color of wall paint, or paste wallpaper; (2) putty can be inspected for flatness under the lamp; ③ Computerized color matching of latex paint as far as possible; (4) After the latex paint is completed, close the window and dry it in the shade, and put a basin of water in the room to keep it moist.
Seven. Installation stage (about 15 days)
What did the decoration company do:
1, land reclamation and cleaning 2, switch socket installation
3, the whole house lamps/bathroom/sanitary ware installation
4. Installation of cabinets in the whole house 5. Installation of indoor doors
What I want to do is:
1, contact the floor merchant for home installation.
2. Return the surplus materials
Precautions:
(1) Repair the bump on the wall with reserved latex paint; (2) Try to go in person for acceptance, and communicate in time if there is any problem; (3) Furniture should be added as needed, and attention should be paid to the collocation with decoration style; (4) After the decoration is completed, ask the decoration company for a quality guarantee.
Buy home appliances according to this list.
Bai Mo intelligent toilet K40003688 yuan
Hegu constant temperature shower H2000 138 1 yuan
Haotaitai clothes rack D-3 125 Meng 1 19 1 Yuan
Little Swan washing machine TG 100 V to 96 167 1 Yuan.
Siemens refrigerator 502L34 1 1 yuan
Hisense TV 65E3G2 13 1 yuan
Supor instant water dispenser JRO 20 1269 yuan
360 doorbell D8 1926 1 yuan
T 1S269 yuan for cow-holding trash can
Boss range hood 2 1A5 1406 yuan
Midea Dishwasher W3802H2423 Yuan
German sapphire wall-breaking machine BP-PB02449 yuan
Midea air fryer MF-KZ50M4479 yuan
Jiuyang rice cooker F4OFY-F 504209 yuan
Baker Bass garbage processor E6893 yuan
Wan Jiale water heater TS 1299 yuan
Tmall Magic Screen Projector M2 1090 Yuan
Kangfu hair dryer KF3 13959 yuan
Midea air conditioner KFR-35GW 1799 yuan
- Previous article:Property patrol car tweeter is illegal. What law?
- Next article:What are the top ten real estate development companies in China?
- Related articles
- Measures of Shenyang Municipality on the Administration of Housing Maintenance Fund
- What is the telephone number of Chongqing Three Gorges International 5 1LOFT Marketing Center?
- The simplest greeting, in a word.
- How about Cuizhou Property?
- The first country is beautiful. Tang Dynasty?
- Where is the address of Fuyang Tianying Joy House?
- How about Gaoyou Branch of Yangzhou Jinwei Machinery Co., Ltd.?
- Banner slogan of domineering house delivery in new community
- Is the planning of Lin Yu's shop in Shenzhen West Lake reasonable and how is the public security?
- What is the telephone number of Chaoyang Ronghe Home Marketing Center?