Job Recruitment Website - Property management - Park 1903 III. Need to reduce and standardize the construction project fees.

Park 1903 III. Need to reduce and standardize the construction project fees.

"Notice" requirements to reduce and standardize the construction project fees mainly include:

First, reduce the high cost of construction drawing design review in various places and implement upper limit control.

Around the engineering survey and design fees as the benchmark, the charging standard shall not be higher than 6.5% of the engineering survey and design fees; If the project is charged according to the estimated (pre-) investment proportion, the charging standard shall not be higher than 2 ‰ of the estimated (pre-) investment; According to the construction area, the charging standard shall not be higher than 2 yuan/square meter.

If the current charging standards in various places are lower than the upper limit, the standards shall not be raised.

The second is to reduce the charging standards for environmental impact assessment of construction projects in some industries.

The environmental impact assessment fees for agriculture, forestry, fishery, water conservancy, building materials, municipal administration (excluding garbage and hazardous waste centralized disposal), real estate, warehousing (excluding toxic and hazardous goods), tobacco, post and telecommunications, radio and television, electronic components, social undertakings and services with an estimated investment of less than 654.38+000 billion yuan will be lowered by 20% on the basis of the current fees.

The third is to reduce the bidding agency service fee of more than 500 million yuan, and set the upper limit of the fee.

Service fee for goods, services and projects bidding agency: 0.035% of the bid-winning amount of RMB 500-654.38+0 billion; 1-0.008% of RMB 500 million; 50-10 billion yuan is 0.006%; More than 654.38+000 billion yuan is 0.004%.

The highest agency service fees for goods, services and projects are 3.5 million yuan, 3 million yuan and 4.5 million yuan respectively.

The circular also requires all localities to further intensify efforts to clean up and standardize construction projects and various housing-related fees, and it is strictly forbidden for administrative organs to collect relevant examination fees and service fees without authorization or in disguised form in the process of performing administrative duties to ensure that fee reduction measures are implemented.