Job Recruitment Website - Property management - When will Harbin Xuanxi Community be rebuilt?

When will Harbin Xuanxi Community be rebuilt?

On September 7th, 2022, China Government Procurement Network issued the Announcement of Competitive Consultation on Sewage Engineering Construction of Municipal Professional Pipeline Reconstruction Project of Fayuansi Xili Community in Xicheng District, and determined the sewage pipeline reconstruction project of Fayuansi Xili Community.

The sewage problem has a long history.

In April, 2022, People's Daily Online leadership message board updated a message:

The information is as follows:

I am a resident of Building 4, Fayuan Temple West. The sewer in the community is blocked and often overflows, so a valve is added. Sewage began to overflow on the third and fourth floors. I dare not use the sewer at ordinary times. Then find a property management company, dredging has no effect. The property said that the fund for the renovation of the old residential area was last year, and the pipeline is ready for renovation. But after a year, nothing happened. Please urge the leaders to solve the inconvenience of the masses as soon as possible, and also check the use of reconstruction funds.

The reply of niujie Street in Xicheng District is as follows:

Hello! Your message has been confirmed. With regard to the problem you have reflected, it has been verified by niujie Sub-district Office that the renovation of this residential area has entered the demolition procedure in the early stage of the renovation, and the street law enforcement team has conducted household communication and investigation on the households with illegal construction on the sixth floor of this residential area. After the demolition work is completed, the community will officially start the renovation project. The staff of niujie Sub-district Office contacted you on April, 2022 16 to explain. Thank you for your concern and support for our work.

The comprehensive improvement project started slowly.

A while ago, Xicheng District planned to renovate and update the outdoor rainwater, sewage, heating pipes, indoor heating risers, horizontal main pipes and valves of buildings 3#, 4# and 5# in Fayuansi Xili Community. The construction contents include rain and sewage engineering and thermal engineering. Estimated total investment: 7,796,500 yuan.

The specific contents of the renovation project include: water supply and drainage renovation of buildings 3, 4 and 5 in Fayuansi Xili Community, air conditioning adjustment, cleaning and painting in the building, removal of existing guardrails outside the windows of all floors in the building, installation of invisible guardrails on the first floor, outdoor engineering and other related supporting projects, as well as other work contents with clear lists.

The renovated building area is 40,400 ㎡, the estimated contract price is 20.6 million yuan, and the construction period is 720 calendar days.

The sewage problem is expected to be completed in March next year.

At the same time, it is displayed as 90 days according to the construction period, and the planned commencement date this year is 10, 0 1. In other words, if it goes well, problems such as sewage pipes in Fayuansi Xili Community will be solved soon.

Procurement requirements:

(1) The renovation scope of sewage pipeline is from the septic tank outlet to the sewage interface in front of the building. Including 689.87 meters of newly built De 160-De300 sewage pipes, 66 sewage inspection wells, 3 septic tanks and 600 meters of dismantled sewage reinforced concrete pipes. See the bill of quantities for details.

(2) Project Location: The project is located in Xili Community, Fayuan Temple, niujie Street, Xicheng District, with the back street of Courthouse Temple in the north, Jiaozi Hutong in the west, Qian Jie in Fayuan Temple in the south and Beijing Acrobatic Troupe in the east.

(3) Duration: 90 calendar days.

If the sewage pipeline renovation project is regarded as the first item of the overall comprehensive renovation of Fayuansi Community, then combined with the time limit requirements in the announcement, the renovation of the community is expected to be completed around the National Day of the following year.

In addition to the news of Fayuansi Xili Community,

Recently, the relevant plots of the Xuanxi Style Coordination Zone project were announced.

There has also been new progress-

Recently, the Beijing Public Resource Trading Service Platform released the prequalification announcement of six courtyards protection and repair projects, including No.8 and No.3 Courtyards of the North Block Project of Xuanxi Style Coordination Zone in Xicheng District:

construction site

Construction sites of this project: No.8, No.5, No.87, No.93, No.45 and No.47 of Xuanwai Street, No.3, No.5, No.5, No.5, No.4, No.5, No.5, No.5, No.5 and No.7 of Shangxie Street.

Fix content

Including but not limited to demolition, repair, decoration, electrical, water supply and drainage, heating, fire protection, weak current and other projects within the scope of construction drawings, construction, installation, inspection, maintenance, warranty and cleaning before completion.

Estimated tender amount: 3.8 million yuan.

The style coordination area involves many hutongs, and the transformation of quadrangles is also to improve this area, "for the sake of face and lining."

In the transformation and upgrading of hutongs, Xicheng has different ways and means in different places. Let's see how Ya 'er Hutong with past experience did it-

After crossing YinDing Qiao, walk a few tens of meters to the north, and there is an alley on the left hand side of the road. Compared with the bustling streets and lanes around, this hutong is quite deserted. This is Yaer Hutong.

On both sides of the hutong, "the breeze shakes the bamboo shadow", and on it, "Clear sky Wan Li wins the blue sky". In the past, the middle of the road was full of potholes, but now the bricks laid by the roadside are flat, and I am not worried that children will easily fall down when running and jumping.

In the process of renovation, street workers use the governance concept of "promoting sustainable renovation through renovation" to implement services in environmental renovation.

When cleaning up roadside garbage, help the masses clear the garbage piled up in the yard for many years; Illegal construction was demolished and waterproof was done; When repairing the hutong wall, residents' homes are broken, and they will also help to mend them.

Yaer Hu tong

The old appearance of Ya 'er Hutong has changed into a new look, which is a microcosm of the transformation and upgrading of back streets and alleys in our district. In the next step, Xicheng District will gradually pilot the "collectivization" management mode of streets and lanes with the street length as the axis, street property, alley stewards and sub-bureau teams as the mainstay, supplemented by the strength of community workers, community grid workers and other coordinators, and the self-government association as the carrier, so as to solidify the achievements of fine rectification and improvement of back streets and lanes.