Hydropower lofting standard

Water and electricity pay-off standard:

During the project disclosure, the customer, designer, project supervisor and substitute foreman determine the hydropower construction practices and have written records.

On the day of disclosure, according to the disclosure records, the corresponding positions of water and electricity pipelines will pop up on the wall surface, and the corresponding templates will be used. Spray a red self-drawn logo on the obvious position beside the corresponding line.

The corresponding horizontal elevation line pops up along the lower edge of the socket or switch box with the same wall and height.

Socket boxes, light boxes, switch boxes, TV boxes and telephone boxes shall be marked with box positions according to horizontal elevation lines.

Make hydropower construction drawings according to the on-site setting-out records.

After measuring the dimensions according to the on-site setting-out, fill in the "Confirmation Sheet for Waterway Reconstruction" and sign it by the customer, project supervisor and construction foreman. If there is any change, fill in the hydropower project confirmation form.

After pay-off, the ground should be painted with broad green environmental protection agent twice. Be careful not to draw on the wall, and the lines drawn by the original property on the ground should be redrawn.