What are the procedures for installing charging piles in Taiyuan?

Pacific Auto Network first needs the consent of the property management department, and at the same time, it needs to apply to the State Grid, and the charging piles can be installed only after the consent procedures of the property management department and the State Grid have been completed. It is not allowed to install charging piles without permission.

What is the process of installing charging piles?

When the pile factory submits the application materials to the power supply company, it needs to provide the user with a copy of the ID card, a confirmation of the charging conditions of the new energy minibus, a statement of property consent to installation and a statement of parking space. The specific process is as follows:

1. Submit application and review materials Generally, as long as the electric car is purchased, the pile factory will submit installation materials to the power supply bureau. At this time, users need to provide a copy of ID card, confirmation of vehicle charging conditions, installation instructions agreed by the village committee and parking instructions.

2. After the building materials are installed, you can start the installation, but the speed will be affected by the village conditions and the location of the garage. Any one is different, and the construction time will be different.

3. After the installation is completed, it must be reported to the Electric Power Bureau, and then the staff of the Electric Power Bureau will go to the site for acceptance. If it is qualified, it will be sealed. Then the electric power bureau makes appropriate electric cards, and the charging pile company collects them and gives them to the owner, or the owner collects them at the power supply bureau, that's all.

Is it convenient to charge the charging pile?

For new energy vehicles, it is very convenient to use charging piles. There is a big difference between charging with a charging pile and charging directly with a portable charger. Charging with a charging pile can quickly charge the vehicle. The use of portable charger is slow charging, and it can also maintain the battery to a certain extent, which is very convenient to use.

What if I can't install the charging pile?

Charging piles cannot be installed. You can only use the portable charger to charge the vehicle. You can directly charge the vehicle by connecting it to the 220v household power supply. There is no other way. The installation of charging piles requires a fixed parking space and the consent of the property management department and the electric power department.