Job Recruitment Website - Property management - A complete quotation, what is included in it?
A complete quotation, what is included in it?
Cost classification of decoration quotation
1, design fee
Fees charged by designers for housing design drawings. Most designers will measure houses and make floor plans. This scheme is generally free of charge, only the cost of rendering the renderings in the later stage. Of course, there will be exceptions to the plan.
2. Material cost
The material cost is determined according to the cleaning, semi-packaging and all-inclusive decoration methods selected by the owner. The quotation does not include the cost of cleaning materials, and the materials needed for construction are purchased by the owner himself. Semi-packaged materials refer to the cost of decoration auxiliary materials, such as plates, keel, putty, glue, paint, hardware, waterproof coating, cement sand, pipes, etc. In addition to accessories, the whole package also includes home main materials, from floor wallpaper to bathroom cabinets, as long as the owners need to use them.
3. Labor costs
Labor cost is the construction cost, including the cost of carpentry, tile, water and electricity, painting and other different projects. The labor cost of each project is generally calculated according to the construction area and engineering quantity.
4. Management fee
This refers to the management fees charged by the property management company during the renovation period, including personnel management fees, license fees, site tool use fees, etc. Although the management fee varies according to the construction area, the total cost is about 5% of the project quantity. The decoration company that has had the current residential construction will be very clear about this and can consult clearly.
5. Transportation costs
Refers to the import and export transportation fee of decoration materials and the cleaning fee of construction waste. Decoration companies usually invite manual handling, which requires extra expenses, and owners can also invite workers themselves.
6. Cleaning fee
Refers to the cost of cleaning the house after the renovation is completed, and the owner can also clean it himself.
Quotation composition of decoration quotation
1, project name
The name of the project should be as detailed as possible. The more detailed it is, the more you can see whether there are any additions or deletions in the construction, but carefully check whether there are any overlapping pricing items.
2. Quantity
Quantity includes construction area, material quantity, construction times, etc. , especially the building area. When the construction area included in some renovation packages is different from the area of their own house, both parties should negotiate well.
3. Unit
The charging method of each project may be different, so don't be confused by the area and quantity. Pay attention to the expression of units. If a word is short, it may be a fee, such as/linear meter/meter.
4. Material price
The main materials and auxiliary materials of decorative materials must be marked with unit price and total price. The unit price is compared with the grade of materials, and the total price specifies the amount of materials.
5. Labor price
Labor costs are also divided into construction unit price and total project price. The unit price reflects the construction level and the total price reflects the importance of the project.
6, material specifications
The grades of auxiliary materials and main materials are different, so it is easy for decoration companies to add tricks from them, shoddy them to earn the difference, and indicate the specifications and quality so that owners can clearly buy them.
7, construction technology
The construction quality of some projects depends on the construction cost. In the same situation, the pre-construction may not change, but it will affect the maintenance of the house after moving in, such as how many times the wall is brushed.
8. Special instructions
When the owner has ideas beyond the decoration company's plan for his house, indicate the project cost required for additional requirements, such as some materials can be provided by the owner himself.
- Related articles
- When will Fuzhou Poly Tian Yue deliver the house?
- When will Nanchang Jiangling Varyag Villa be delivered?
- When will Yinchuan Sanshayuan International Eco-cultural Tourism Resort deliver the house?
- Is there a Huawei store in Yantai Ginza?
- What is the specific major of Taiyuan Xinghua Vocational College?
- Linyi Yin Cheng Property Management Co., Ltd. is one of the few star companies.
- How many years is the property right of Xinyang Yingbin Garden?
- What is the telephone number of Nanjing Philips Platinum Bay Sales Office?
- What procedures does the grain and oil store need?
- Who will bear the expenses of the owner's preparatory group?