What problems should be paid attention to when the decoration is completed and accepted?

As an important part of new house decoration, acceptance can help to find the problems left over after decoration, and ask the decoration company to rectify them in time to avoid finding problems that are difficult to maintain in the future. So, what should we pay attention to in decoration acceptance? First, the acceptance of water and electricity is the key point: (1) The acceptance of circuit installation is mainly to see whether the lighting and power-on are normal through the trial lighting of lamps and switches. The owner can also use the electrician electroprobe to check whether each socket is electrified and turn on the switch to see if there is any problem. (2) Waterway installation and acceptance is mainly to check whether the pipeline is firm, and you can turn on the faucet to check whether it will shake; In addition, it depends on whether the water supply of the water pipe is smooth and whether there is water leakage, mainly depending on whether there is water drop or water leakage at the position of the joint and elbow. You can wipe the joints and elbows with paper towels for testing. In addition, it is necessary to check whether there is "flooding" and "down slope" in the room with floor drain. You can turn on the faucet or shower, and after a while, see if the ground water is unobstructed and there is no local water accumulation. In addition, it is necessary to test whether the floor drain, toilet and basin are successfully launched. Second, paint acceptance: paint acceptance should be done by visual inspection and feel under natural light after the paint is dry. During acceptance, attention should be paid to check that the variety, color and film of the coating should be consistent with the sample. Paint surface should be smooth and flat; The varnish has clear wood grain, large surface without edges, flowing lines and wrinkled skin, basically the same color, and no brush lines; The wall latex paint has no peeling, brush leakage and coating leakage, no sagging and wrinkles on the surface, consistent surface color and no obvious brush lines. Three. Acceptance of wall and floor tiles: to accept wall and floor tiles, we must first look at whether the tile surface is straight, whether the gaps in the tile surface are regular and consistent, and whether the tile surface is damaged or collapsed. In addition, pay attention to whether the tiles and waistline are in the correct position, and whether there are deviations and height errors. In addition to external considerations, the internal hollowing rate of wall tiles and floor tiles should also be specially tested. Owners can tap the corners and middle of walls and floor tiles with a small metal hammer to see if there is a hollow sound. The local hollowing rate of walls and floor tiles should not exceed 5% of the total tile laying area, otherwise the problem of falling off will occur. 4. Woodworking acceptance: For the wooden door made on site, check whether the opening direction of the door is reasonable, whether it is flexible when opening, and whether it is stuck or bounced. In addition, check whether the door crack is reasonable. The crack of the door above and around the wooden door should not exceed 3mm, and the lower seam is generally 5-8 mm. In addition, check whether the seam of the door cover is tight. For the cupboard door, it depends on whether the switch is normal. When the cupboard door is opened, it should be easy to operate without abnormal sound. In addition, check whether all kinds of locks of door handles and cabinets are installed correctly and opened normally. 5. Pay attention to air quality in winter: As some materials will have the problem of "expansion with heat and contraction with cold", the standards for "cracks" in winter decoration can be relaxed during acceptance. For example, the gap between the wooden door and the door kit is too small, so it is difficult to close the wooden door after summer. Therefore, it is best to leave at least a gap of 1 to 2mm between the wooden door and the door kit, especially the gap between the wooden door and the ground can be 2 to 3mm, and the wooden floor should be properly left with a gap in winter, as long as it is a natural gap. In addition, due to the cold weather in winter, the ventilation time in the decoration process is relatively short, and the harmful gases contained in the decoration materials are difficult to volatilize, so air quality is a problem that must be paid attention to. It is best for the owner to check whether there are any clauses about indoor air quality testing in the contract signed with the decoration company. After the completion acceptance, if the indoor smell is strong, you can consult relevant institutions and personnel. 6. Pay attention to acceptance in sequence: it is best to accept in sequence. For the completion acceptance, the key point is to accept the increase or decrease of "lining" in "surface" engineering and decoration. After the completion acceptance, the decoration company will settle the balance of the project. In order to avoid miscalculation of additions and deletions, the owner should also measure and verify the additions and deletions in the decoration process during the acceptance process, so as to achieve this last pass. After acceptance, the owner will sign a warranty agreement with the decoration company to safeguard their rights and interests.