Example of monthly supervision report
65438+February 18 —— 1 1 year 1 month 17 days.
The water plant expansion and water intake renovation project lasted from February 18 to this month 17. With the cooperation of the owner, design, supervision, construction and other parties, the completion of the project is as follows, which is now reported to the owner:
A, this month's project image progress completion:
1. The standard buried steel pipe is 24.4m, totaling 565.4m. ..
The second and third bids did not produce quantity.
The comprehensive water tank in the fourth bid section is completed with A 1, A2 wallboard and 6.70 structural concrete, B 1 wallboard reinforcement and formwork, B2 floor concrete, C 1 and C2 wallboard and 6.70 structural concrete, D 1 6.70 structural reinforcement and formwork, D2 floor concrete, E66. 338 piles were driven into the filter, totaling 1, 5 1.4 piles. Floor reinforcement and formwork in Area A have been completed. The wallboard and roof of the distribution well are poured with concrete. Water intake equipment foundation, bank protection construction and off-site steel pipe installation.
Second, this month's engineering data:
This month 1 monthly supervision report, 4 supervision weekly work reports and 1 regular meeting minutes were submitted to the owner in June 5438+February, which is convenient for communication with the owner and beneficial to our supervision work. Issued a notice 1 copy. In order to better carry out the engineering construction work, standardize and unify all the work, the engineering data will be sorted out as required during the construction process.
Third, this month's situation:
1. Progress this month:
Compared with the schedule, II and IV are behind the schedule.
2, the project quality:
In the process of engineering construction, raw materials can be witnessed and sampled in each bid section according to the specification requirements, and it is practical only after passing the inspection. The concrete adopts commercial concrete, the gradation meets the requirements, and the axis and elevation can be strictly controlled. But at the same time, there are also some shortcomings in the construction: the fabrication and installation of some steel bars in the fourth bid section are not standardized, the interval construction of root piles is not in place, the concrete is not compacted, the steel bars are displaced during pouring, and the concrete honeycomb is exposed after formwork removal. Our site supervisor found this problem in time and asked the construction unit to rectify it in time.
3, engineering measurement and project payment:
Our on-site supervision team should make original records of engineering measurement in time, count the completed quantities, and pay the progress payment monthly.
4, factors affecting the progress of the project:
At present, the main reason affecting the progress of the second bid section is the slow land acquisition, and the main reason for the fourth bid section is the lack of on-site construction materials.
Four. Summary of supervision work this month:
1, we will witness the sampling and acceptance of raw materials in time, review the engineering data, and ensure the smooth construction of the project.
2. Track and inspect the construction site, and conduct inspection and supervision by means of on-site inspection and patrol. Problems found should be solved in time, and concealed works should be accepted.
3, strictly check the construction quality of each working procedure, on-site supervision of key parts.
4, establish all kinds of technical data, establish a standardized internal management system.
5. Hold regular supervision meetings, implement construction measures, contact all parties in time when encountering problems, and coordinate to solve problems.
6, urge the construction unit to do a good job of on-site safety rectification.
7. Supervise the construction unit to arrange manpower and material resources reasonably to ensure that the construction progress meets the requirements.
Verb (abbreviation for verb) Work plan for next month:
1, do a good job of acceptance and witness sampling of raw materials.
2. Control the quality of pipeline excavation and installation.
3. Control the quality of reinforcement, formwork, concrete construction, foundation earthwork backfilling and revetment construction.
4, do a good job in site safety and civilized construction, and urge the construction unit to do a good job of rectification of potential safety hazards.
5, urge the engineering data to submit for approval.
6, to do a good job of construction, the owner's coordination.
7, urge the construction unit to arrange manpower and material resources reasonably to catch up with the backward time limit for a project.
Engineering construction supervisory co., ltd
Supervision Team of Water Plant Expansion and Water Intake Reconstruction Project
20 1 1 1 17.
- Related articles
- Chang 'an Dong Jun Property
- Where is Wenlanyuan in Nanchang?
- How about Shuangyashan Xindongrong Property Management Co., Ltd.?
- How to take a bus from Hongjia to Huangyan West Street Community?
- When will the third phase house of Huashan New Town be delivered?
- How about the Nantong office of Shanghai Economic and Trade International Freight Industry Company?
- How about Beijing CIC Henderson Property Management Co., Ltd.?
- How many years is Kunshan's international property right?
- What is the telephone number of the sales office of Luoyang Jinsha Square?
- Some colleges and universities of the National Flag Guard.