Water and electricity decoration can be said to be a major event in family decoration, and the problems in water and electricity decoration will have a more important impact on the whole family decoration and future life, so I'm here to introduce the matters needing attention in water and electricity installation in bathroom decoration, hoping to help you understand the matters needing attention in water and electricity installation in family decoration.

Matters needing attention in water and electricity installation of toilet renovation

1. After the location of the washing machine is determined, the drainage pipe of the washing machine can be considered in the wall, which is beautiful and convenient;

2, if you want to close the redundant floor drain, be sure to hold the gap between the drain pipe and the floor drain to prevent water from overflowing;

3. Make good use of gas or electric water heaters in advance to avoid temporarily changing the type of water heaters, resulting in repeated renovation of waterways;

4. In waterway design, we should first think about all water-related equipment, such as water purifier, water heater, kitchen treasure, toilet and washbasin, their positions, installation methods and whether hot water is needed;

5. It is best to have the owner present for the suppression test, which can play a supervisory role; Because some decoration teams will cheat the owners in this link.

The method is: when pressing, open the "return valve" of the pressing pump to form a loop. Although the press pump seems to be working, the pressure in the pipeline is not great, especially the electric press pump, which students should pay more attention to. If you don't understand, ask a professional to take a look at it for you. 6. Except the water outlet of washbasin, toilet, washing machine, etc. It is best to pick them up one by one, so that it is convenient to mop the floor after receiving water; It depends on the owner's preference.

7. There should be a suppression test after the waterway renovation, but now many decoration teams have not suppressed the test. They will lie to you in many ways, saying that there is no need to suppress, the water pipe is under pressure, and so on;

8. After the kitchen and bathroom floor tiles are laid, check whether the floor drain is unobstructed (the drainage speed after removing the floor drain cover shall prevail, because most deep-water sealed floor drains have the problem of slow drainage);

9. Another point is particularly important. It is best not to use deep water seal for the floor drain of washing machine. The washing machine drains water quickly and has a large displacement. The launching speed of deep-water sealed floor drain can not be reached at all, which will directly lead to water overflow.

10, when using the deep-water sealed floor drain, it should be cleaned frequently according to the use situation, otherwise the rubber pad under the floor drain will not be sealed after hanging dirty things;

1 1. Pay attention to check whether the drains in the kitchen and bathroom are unobstructed when you close the house. If the drainage is slow, the property should be dredged in time; Protect the drain when decorating, especially when laying kitchen and bathroom tiles, which is most likely to cause cement to fall into the drain and cause blockage;

12. In the process of waterway reconstruction, four points should be paid attention to for the cold and hot water supply pipes reserved for installing electric water heaters and faucets in the future:

(1), the hot and cold water nozzles have the same height;

(2), cold and hot water nozzle should be two centimeters higher than the wall, when laying wall tiles, bricklayer should also be required to ensure that the wall tiles and water pipe nozzle are on the same level. If the size is not suitable, install electric water heaters, faucets, etc. Additional couplings, internal wires and other connectors may need to be purchased in the future to complete the installation;

(3), cold and hot water nozzle vertical metope, stick a wall brick should also pay attention to don't let the bricklayer get crooked (not vertical,

It will be difficult to install in the future); (4) Ensure the spacing of 15cm (at present, the spacing between hot and cold water of most electric water heaters and faucets is 15cm, and some are10cm);

Matters needing attention in hydropower transformation 13. Don't forget to waterproof the bathroom floor, especially the slotted floor. If the shower area is not a closed shower room, the wall waterproof should be 180 cm high to prevent "wall sweating" in the future. Be sure to do a 24-hour closed water test before plastering cement. Bricklaying can only be done without problems.

Let me sum up: I believe that after reading the above contents, you should know something about the precautions of water and electricity installation in bathroom decoration, hoping to help you do a good job in water and electricity installation in bathroom decoration.