What departments are there for joint acceptance of Shanghai real estate?
Sixteenth the construction unit shall organize the design, construction and project supervision after receiving the completion report of the construction project.
Relevant units carry out completion acceptance.
The completion and acceptance of a construction project shall meet the following conditions:
(a) to complete the design of the construction project and the contents of the contract;
(two) a complete technical file and construction management information;
(three) the main building materials, building components and equipment used in the project;
(four) quality documents signed by the survey, design, construction, project supervision and other units;
(five) the project warranty signed by the construction unit.
The construction project can not be delivered until it has passed the acceptance.
II. Unified Standard for Acceptance of Construction Quality of Building Engineering (GB50300-20 13+03)
6.0.6 After the construction unit receives the project completion report, the project leader of the construction unit shall organize the supervision, construction, design and survey units to carry out the unit project acceptance.
Three, the specific completion acceptance (also known as comprehensive acceptance or joint acceptance), led by the local government departments or organizers, the general requirements:
(a) has organized five major units to carry out the unit project completion acceptance and qualified.
(two) housing construction projects or municipal supporting projects have been completed and accepted for the record.
(three) planning, fire protection, civil air defense, meteorology, environmental protection and other special inspections have passed.
(4) The measured results of commercial housing construction area have been completed.
(5) The property warranty fund, special property maintenance fund, one-time cleaning fee for decoration garbage and preparation fund for the first owners' meeting of the commercial house have been paid.
(six) with hydropower conditions, gas pipelines, cable TV, communication infrastructure has been laid according to the design requirements.
(seven) the municipal infrastructure has been incorporated into the urban municipal infrastructure network.
(8) Classify each unit of the trash can and put it in place.
(nine) building energy-saving and green building facilities and equipment have been implemented, and the relevant acceptance has been completed.
Shanghai elite answers for you.
- Previous article:What is the price of R&F in Urumqi?
- Next article:Is there a property fee in the basement of the villa? What should I pay attention to?
- Related articles
- How to get to zhu cun Station from Caihui Station of Guangzhou b6 Bus?
- How about Bishui Group Co., Ltd.?
- Recall the poetry of Jiangnan
- Which district does the four-leaf clover creative park belong to?
- How much is the office building of the window of Chengdu Greenland?
- What about Shanghai Yuxing Property Management Co., Ltd.?
- East Gate Address of Lihai Garden, Laoshan District, Qingdao
- # Tianjin Xinbohai Technology Co., Ltd. # How is your company?
- Is Hefei Wanzhen Xiaoyao Garden a relocated house?
- The story of Qin storm