Job Recruitment Website - Property management - There are 6 templates in the emergency plan for sudden power failure in the hospital.

There are 6 templates in the emergency plan for sudden power failure in the hospital.

The earth is our home, and disaster prevention and reduction depend on everyone. In order to minimize the possible losses caused by disasters, we often prepare emergency plans in advance. So, where should the emergency plan start? Please read the template of emergency work plan for sudden power failure in our hospital for you. Welcome to read, I hope you like it!

Template of emergency work plan for sudden power failure in hospital 1 1. Emergency plan for planned water stoppage.

1) The municipal pipe network plans to stop water supply.

1. After receiving the notice of water stoppage, immediately notify the owner and users of the water stoppage information in writing, including: the unit that implemented the water stoppage, the reason, time and scope of water stoppage, and the time to resume water supply, etc.

2. Please ask the owners and users to reserve water in advance;

3. If the water cut-off time is too long, contact the water supply company to deliver water.

2) community water supply interruption

1. After receiving the water cut-off information, immediately notify the * * * users and facilities and equipment maintenance personnel to the site, and contact the water supply company to confirm whether it is the cause of the municipal pipe network;

2. Immediately organize personnel to repair the water supply after finding out the reason;

3. If the maintenance takes a long time, a notice should be posted in a conspicuous place in the residential area immediately to inform the owners and users of the relevant areas, including: the reason, scope and estimated repair time of water stoppage;

4. If the water supply time is too long, contact the water supply company to deliver water;

5. After the event, find out the reason of water stoppage and notify the relevant person in charge in writing.

Second, the water emergency plan failed

1. Immediately notify * * * users and facilities and equipment maintenance personnel to the site after receiving the water cut-off information, and contact Zishui Company to confirm whether it is the cause of the municipal pipe network;

2. Immediately organize personnel to repair the water supply after finding out the reason;

3. If the maintenance takes a long time, a notice should be posted in a conspicuous place in the residential area immediately to inform the owners and users of the relevant areas, including: the reason, scope and estimated repair time of water stoppage;

4. If the water supply time is too long, contact the water supply company to deliver water;

5. After the event, find out the reason of water stoppage and notify the relevant person in charge in writing.

Third, the planned power outage emergency plan

1) planned power outage of municipal pipe network

1. After receiving the power outage notice from the power supply department, the notice shall be posted in a conspicuous position three days before the power outage to inform the owners and users in the power outage related areas, including the unit that implemented the power outage, the reason, time and scope of the power outage, and the time to restore power supply, etc. And require owners and users to turn off all electrical appliances during the power outage;

2.*** Use the maintenance personnel of components, facilities and equipment to prepare for sudden troubleshooting and cooperate with equipment maintenance, and turn off the power supply of related facilities before power failure;

3. Stop the elevator before the power failure, and ask the owners and users not to use the elevator for the time being;

4. After the power failure, quickly start the motor power supply;

5. During the power outage, strengthen the maintenance of public order in the community and prevent criminals from fishing in troubled waters;

6. After the power supply is restored, check whether the equipment of the building division is operating normally.

Fourth, the power outage emergency plan

1. After receiving the power outage information, immediately notify the maintenance personnel of the components, facilities and equipment used by * * to go to the site to check, and contact the power supply company to confirm whether it is the cause of the municipal pipe network;

2. The control center should check whether there are people trapped in the elevator in time and deal with them according to the emergency plan for people trapped in the elevator;

3. After finding out the reason, immediately organize personnel to repair the power failure;

4. Inform the order maintenance personnel to strengthen the patrol in the power outage area and control after each entry and exit, and check whether the elevator is trapped and whether there are other accidents;

5. Turn off the power switch of related equipment;

6. If the maintenance takes a long time, a notice should be posted in a conspicuous place in the community immediately to inform the owners and users in the relevant areas, including: the reason, scope and estimated repair time of the power outage;

7. Turn on relevant equipment immediately after power supply is restored, and check whether public appliances and equipment are back to normal operation;

8. Afterwards, find out the reason of water cut-off and notify the relevant person in charge in writing.

In order to do a good job in emergency rescue and disposal after sudden power failure of the hotel, ensure that the hotel effectively organizes relevant departments to carry out emergency rescue in case of sudden power failure, and minimize unnecessary losses and consequences, the emergency plan for sudden power failure of the hotel is formulated in accordance with the relevant regulations of the higher authorities and the actual situation of the hotel. After the sudden power failure, the work division of relevant departments is as follows.

The work of the Ministry of Security:

1. Once the hotel suddenly loses power, the employees at the highest level in the store will immediately organize employees at all positions to take corresponding emergency measures, and call all the security guards on duty to divide the work, assign security guards to control the entrance and exit of the hotel, check out the articles and personnel going out, and strictly control them to prevent the outflow of property.

2, quickly send security guards to check the elevator along each floor, using propaganda, flapping to check whether there are trapped people in the elevator, if there are trapped people, immediately notify the engineering department and actively assist in taking rescue measures.

3. Send security guards to patrol all floors continuously, especially to strengthen the safety patrol inspection of key parts, places and areas, mainly to check the door locks of floors, emergency lighting of floors, personnel activities of floors, etc. To prevent people from using power outages to commit crimes and fish in troubled waters.

4, notify the relevant departments to do a good job in the protection of important facilities and equipment after power failure, to prevent damage.

5, do a good job of emergency and handling all kinds of emergencies after power failure.

6, actively supervise and assist the engineering department to find the cause of the power outage, and restore power supply as soon as possible.

Housekeeping work:

1. If the hotel suddenly loses power, the employees at the highest level in the store will immediately organize employees at all positions to take corresponding emergency measures. Floor staff should carefully check the rooms and writing rooms on each floor to prevent people from lighting candles or throwing cigarette butts to cause fire accidents, and at the same time do a good job of reminding guests and patiently explaining.

2. When the power outage lasts for a long time, the waiter should advise the guests not to panic and try to meet the needs of the guests. When guests ask to leave the store, they should be well guided. In case of emergency, evacuation should also be done to guide guests to evacuate from the escalator to the outside of the store.

3. The front desk should immediately save and back up the historical data of the guests, and inform the assistant manager of the lobby to stick to his post, handle relevant complaints and coordinate to solve related problems caused by power failure.

The bellman should take good care of the guests' valuables and try to control foreigners to enter the hotel after the power failure.

5, the service center should do a good job of customer information transmission and all kinds of consultation, and try our best to do a good job of customer service after power failure.

Food and beverage department work:

1. Once the hotel suddenly loses power, the employees at the highest level in the store will immediately organize employees at all positions to take corresponding emergency measures. The catering staff should carefully check all business premises and consumption rooms to prevent people from lighting candles or throwing cigarette butts, and do a good job of prompting and patiently explain to the guests.

2. When the power outage lasts for a long time, the waiter should advise the guests not to panic and try to meet the needs of the guests. When guests ask to leave the store, they should be well guided. In case of emergency, evacuation should also be done to guide guests to evacuate from the escalator to the outside of the store.

3. When there are many consumers, the waiter should pay more attention to the entourage, observe the trends of consumers and their surroundings, give tips and care to the guests' belongings, and properly keep the items stored by the guests.

4. The kitchen staff should carefully check the stoves, pipes, high-power electrical appliances and other important equipment, turn off the power supply, electrical appliances, oil valves and various switches, and take corresponding preventive measures.

Work of engineering department:

1. If the hotel suddenly loses power, the employees at the highest level of the department in the store will immediately organize employees at all positions to take corresponding emergency measures. First, find out the cause of the power outage at the first time.

2. When the power supply bureau system is out of power, immediately call all the personnel on duty and go to the lobby, power distribution room, exchange station, restaurant and floor to check the emergency lighting facilities in pairs, and turn the corresponding electrical equipment switch to the off position.

3. Elevator rescuers quickly open the door of the nearby elevator car hall and call loudly to confirm whether there are any guests trapped in the elevator and the location of the elevator. If it is not in the flat position, quickly rush to the elevator machine room of 14/F, immediately turn off the power switch after opening the door, remove the protective cover of the traction machine, gently press the mechanical brake with special tools, and when the elevator car slowly slides to the flat position, open the car hall with the special mechanical maintenance key for the elevator.

4, exchange station lithium bromide unit, plate exchanger and volumetric exchanger once power failure, immediately turn off the steam, so as not to damage the equipment.

5. When the power distribution room can't supply power normally due to water inflow, fire and other reasons, in case of emergency, the power supply of domestic pumps, fire pumps, spray pumps, elevators, monitoring rooms and so on can be ensured by switching to the state of fire standby power supply, so as to ensure the operation of important equipment.

6. If the electrical components of the branch circuit in the distribution room fail, you can immediately disconnect the branch circuit and put up warning signs to ensure the normal power supply of other circuits, and then try to solve it.

7, during the power outage, it is forbidden to use open flame operation, isolation belt should be set around flammable items, and strengthen inspection.

8. During the power outage, the employees on duty in the engineering department should obey the unified command of the manager and report the latest developments in their respective regions in time.

The work of the finance department:

If the hotel suddenly loses power, the employees at the highest level of the department in the store will immediately organize employees at all positions to take corresponding emergency measures. The finance department office should store cash, checks and seals, and the front desk and cashier point should also manage cash immediately and save and back up customer historical data.

Work of Marketing Department, Human Resources Department, Purchasing Department and General Manager's Office:

In case of sudden power failure in the hotel, the highest-level personnel in the department in the store will immediately organize personnel in all positions to take corresponding emergency measures, and office personnel should stick to their posts and do a good job in the management and custody of various agreements, personnel files and other important materials.

Special emphasis is placed on:

After a sudden power outage, all departments should coordinate with each other, cooperate closely, complete their work according to the contents of the plan, and strive to control and reduce the losses caused by the power outage to a minimum.

Template of emergency plan for sudden power failure in hospital 3 I. Setting purpose

In order to ensure the safety of patients' lives, reduce property losses, ensure the smooth use of electricity in the hospital, promote the institutionalization and standardization of accident emergency work, and quickly and orderly organize the restoration of power supply, this plan is formulated in accordance with relevant national laws and regulations and the actual situation of our hospital.

Second, the emergency principle

The treatment of power failure accidents should be based on the principles of "prevention first, constant vigilance" and "unified leadership, perfect mechanism, clear responsibility, strengthened cooperation, quick response and decisive measures".

Third, organization

The hospital has set up a power outage emergency leading group and an emergency repair team.

(1) Power outage emergency leading group

Team leader: Xia Qin

Deputy leader: Chen Jiaquan

Members:, Mei, etc.

Responsibilities:

1, do a good job in daily safe power supply, implement the responsibility system for safe production, and prevent power failure accidents.

2. In case of power failure, do a good job of power failure emergency in time and restore power supply as soon as possible.

3, according to the severity of the power outage accident, decided to start and terminate the emergency plan.

4, timely report the accident to the superior and announced to the floor.

5. Request external support if necessary.

6, the leader of the leading group is the first responsible person to fulfill the provisions of this plan. Under the unified command of the leading group, all member units should carry out their duties and cooperate with each other to do a good job in social comprehensive emergency work in case of power failure.

(2) Emergency repair team

Team leader: Chen Jiaquan

Members:,, Mei

Responsibilities: Organize personnel to carry out rescue in case of accident; Report the accident to the command group, send help to the power supply department when necessary, and summarize the experience and lessons of emergency rescue work afterwards.

Fourth, emergency procedures.

(A) the logistics department electrician class emergency procedures

1, emergency procedures for planned power outage

(1) When an electrician receives a call from the power supply department informing him of the power outage or other forms of power outage notice, he must ask about the power outage time, how long it will stop and the reasons for the power outage, and make records. If he is not in this shift, he should be handed over clearly when changing shifts.

(2) Notify the leader of the emergency leading group (notify the chief attendant at night), explain the power outage reason, specific power outage time, and how long to stop, and make preparations for the standby secondary power supply.

(3) During normal working hours, if time permits, the hospital office shall send a written notice to the whole hospital.

(4) If the time is urgent, after receiving the notice from the power supply department, immediately notify the leader of the emergency leading group (notify the chief attendant at night), explain the situation, and send a notice to all departments. Important departments should inform the director of the department and the head nurse of the time to stop sending electricity, and make a plan to stop sending electricity.

(5) Go to the transformer room 30 minutes before the power failure, and make a preliminary inspection of switching the standby secondary power supply. In case of power failure, the standby second power supply should be started within 10 minutes and supply power normally.

(6) When the external power supply fails, start the generator to supply power to ensure the full coverage of the whole hospital.

(7) Make records of standby power generation operation and the records after the recovery of commercial power.

2, temporary power outage emergency procedures

(1) When there is a temporary power outage, you should immediately call the power supply department to find out the reason and duration of the power outage.

(2) Inform the emergency team leader or shift supervisor to explain the situation.

(3) If the power failure time is short (within 5 minutes), wait for the mains supply before sending the high and low voltage piezoelectric devices.

(4) If the power outage lasts for a long time (more than 5 minutes), the standby generator should be started as soon as possible to ensure the power supply of the whole hospital.

(5) Record the operation of self-provided power generation.

(6) When there is a power outage due to internal reasons in the hospital, it is necessary to find out the cause of the power outage, whether it is a high-voltage circuit or a low-voltage circuit. If the high-voltage circuit fails, contact the emergency repair team of the power supply department in time to recover as soon as possible to ensure power consumption; If the hospital low-voltage circuit fails, the reason should be found out quickly and the circuit should be restored according to the operating procedures.

Verb (abbreviation for verb) protection

(a) the electrician should do a good job in the daily maintenance of the generator to ensure that the generator is put into use at any time.

(2) Electricians should master power supply knowledge and operation specifications at ordinary times, and pay attention to operation safety.

(3) Clinical departments are routinely equipped with emergency lights, flashlights and other lighting equipment, which are regularly checked and kept in good condition.

(4) The logistics department should organize emergency power failure drills, twice a year 1-2 times. Through drills, be familiar with the emergency handling procedures of sudden power failure to ensure the safety of patients.

Hospital emergency plan template 4 I. Emergency treatment of sudden water cut-off

1 After receiving the notice of water stoppage from the business households or merchants, the personnel on duty for the project must immediately rush to the water stoppage site to learn more about the water stoppage scope and relevant water stoppage conditions.

2. The engineering personnel on duty should immediately check the valve of the main gate in the water stop area. If the valve is closed, know the reason of valve closure in time, and then open the valve to restore water supply after confirming that it can be opened.

3 If the main valve of this section is not closed, contact the water supply company in time to find out the specific reason for the water stoppage.

4 when the water supply of domestic water pump equipment causes water cut, the following treatment should be carried out:

(1) If water supply is cut off due to valve closure, you should immediately know the reason for valve closure and take effective measures to restore water supply in time.

(2) If the water supply is cut off due to pump stop, immediately find out the reason for pump stop, and take effective measures for maintenance or replacement of parts to restore water supply in time.

(3) In case of water stoppage in the municipal pipe network, immediately check whether the water inlet gate valve of the municipal pipe network is out of order or contact the water supply company to understand the reason for water stoppage and restore the water supply time. Cooperate with the service center in time to explain the relevant work to the operators.

Second, the emergency treatment of sudden power failure

1, high pressure ring network cabinet suddenly lost power.

(1) The engineering personnel on duty shall contact the power supply department of high-voltage lines in time, and shall not conduct any operation before finding out the cause of the fault.

(2) If the fault point is not within the jurisdiction, and it is estimated that the fault will be eliminated for a long time, the high-voltage operation personnel of the power supply department can transfer to another high-voltage power supply line (if any) and put a "No Closing" sign on the switch that is prohibited from sharing.

(3) After troubleshooting, the operators of the power supply department will restore the original power supply line.

2, transformer room circuit breaker tripping power failure

(1) After receiving the power outage notice, the engineering personnel on duty immediately rushed to the power outage site, turned off the load switches of each branch under the circuit breaker, and hung the "Line maintenance, no closing" sign on the tripped circuit breaker.

(2) Use a shaking table to detect the branch line.

3) After finding out the faulty line, close other lines and restore power supply.

4) Hang a sign "Line maintenance, no closing" at the faulty branch switch for further maintenance, troubleshooting and restoring line power supply.

3, the operator room trip

1) After receiving the power outage notice, the engineering personnel on duty immediately rushed to the power outage site. Before inspection and maintenance, they should know whether other appliances were used before the household electric meter tripped, so as to find the fault point quickly.

2) If the fault is the indoor master switch, immediately turn off the master switch and other shunt air switches, and then turn on the master switch.

3) If the main switch does not jump, send the sub-switch; If a sub-switch does not send power, detect the line in sections until the fault is eliminated and the power supply is restored.

Template of emergency plan for sudden power failure in hospital 5 I. Purpose and significance of the drill

1。 Through drills, we can improve the ability of hospital logistics support and handling public emergencies, safeguard patients' lives and hospital property safety, maintain hospital safety and medical order stability, and promote the comprehensive, coordinated and sustainable development of medical work in our hospital.

2。 Through the drill, the staff's sense of urgency and emergency, social responsibility and self-help and mutual rescue ability were enhanced, and the hospital's rapid response ability to power supply emergencies was improved.

3。 Through the drill, the rationality and effectiveness of the emergency mechanism of power supply in our hospital are tested, and the improvement measures and methods are put forward to further revise and improve various emergency plans.

4。 Through drills, the emergency management of logistics support and the emergency rescue team of electrician group are trained, and the essentials of accident emergency treatment are constantly improved, so as to accumulate experience for quick and effective treatment and minimizing accident losses in case of large-scale power failure.

5。 Test the operability of the emergency plan for large-scale power outage in xx People's Hospital.

Second, the basic requirements and principles of the exercise

1。 We must follow the principle of safety first, organize closely and take effective measures to ensure the safety of the drill;

2。 It is necessary to proceed from actual combat, be targeted and representative, focus on key departments, and ensure the effect of the exercise;

3。 Take the method of unified leadership, unified arrangement and graded responsibility to ensure the success of the drill.

4。 The specific drills are organized and implemented by the General Affairs Section, coordinated by the hospital office, coordinated by various functional departments of the hospital, and actively participated by teams of relevant departments.

Third, exercise time:

7: 00 a.m. to 10 a.m. on 10, xx.

Fourth, the organization and responsibilities of the exercise.

1。 Responsibilities of the leader of the emergency leading group: according to the requirements of this exercise plan, unified leadership and command of the hospital's large-scale power outage emergency response exercise; Organize the establishment of corresponding emergency drill organizations; Be responsible for the examination and approval of the overall exercise plan; Coordinate the relationship between the exercise command institutions of relevant departments; Announce the initiation and termination of emergency plans; Issue emergency drill instructions. Review and summarize the exercises.

2。 Responsibilities of the drill office: responsible for organizing the formulation of the drill plan and overall plan; Responsible for coordinating, organizing and directing the coordination of various subjects; Implement the specific work of each subject exercise.

3。 Responsibilities of the emergency repair team: organize personnel to carry out rescue in case of accident; Report the accident to the command group, send help to the power supply department when necessary, and summarize the experience and lessons of emergency rescue work afterwards.

4。 Responsibilities of each department team:

1) is responsible for power supply preparation of the department.

2) Be responsible for the first aid of severe patients with power failure, ensure the ventilation, ECG monitoring and treatment of patients, and ensure the safety of patients.

Verb (abbreviation for verb) practice content

(1) Emergency Start and Accident Report

1. Due to 1 10kV Yingcheng substation equipment accident, the whole station lost pressure, resulting in a large-scale power outage in northern Wencheng.

2. Wencheng Power Supply Office of xx Company of China Southern Power Grid reported the accident to the hospital electrician group. The electrician team leader reports to the leader of the large-scale power outage emergency leading group and suggests taking measures.

3. According to the incident, the hospital emergency leading group decided to start the emergency plan for large-scale power outage of xx People's Hospital.

4. The drill office will notify all departments and teams of the power outage, and start the emergency plan for large-scale power outage of xx People's Hospital.

(2) Emergency treatment

1, repair team

(1) Start the first generator standby power supply immediately to ensure medical power supply.

(2) If the first set of generator standby power supply fails, start the second set of generator standby power supply to ensure the power supply of key departments such as operating room and emergency department.

(3) Check the elevator. If there are any locked passengers, immediately release all the passengers by manual method, and do a good job in passengers' ideological work. Restore the normal operation of the elevator.

2. Clinical departments, especially emergency ICU, operating room and neonatal ward.

(1) immediately find a dynamic way to rescue patients, maintain rescue work, and turn on emergency lights, etc.

(2) critically ill patients, patients who use a ventilator during surgery, should be equipped with a simple ventilator beside the machine. Once the power is suddenly cut off, the medical staff will immediately disconnect the ventilator and use a simple respirator to maintain breathing. For patients who use electric sputum aspiration, a 50 ml syringe is connected to the sputum aspiration tube to aspirate sputum.

(3) Before the generator power supply in the hospital, the medical staff should first ensure the patient's rescue; Nurses should be calm, hold the ball when they are on the ventilator, measure blood pressure and pulse manually when they are on the monitor, use a 50 ml syringe connected with a sputum suction tube for electric sputum suction, closely observe the changes of the condition, and use emergency lights to illuminate.

(4) strengthen the patrol ward, appease patients, and pay attention to fire prevention and theft prevention.

⑤ Stop using high energy-consuming equipment such as boiling water and heating.

3. Medical Department

① Check the operation of uninterruptible power supply.

(2) Equipment equipped with uninterruptible power supply should stop and stand by after completing the ongoing inspection before the standby power supply of the generator in the hospital resumes power supply.

(3) The standby power supply of the generator in the hospital is restored, and the normal project inspection is started. But we must pay attention to the operation of the equipment. If the standby power supply voltage of the motor in the hospital is unstable, the equipment must be stopped for standby.

Six, the end of the emergency (emergency lifting and aftermath)

1。 After the exercise was scheduled for 4 hours, the relevant accident handling work came to an end.

2。 When the municipal power grid resumed power transmission, the electrician group reported the power grid restoration to the drill office and requested to lift the large-scale power outage.

3。 The emergency repair team should be ready to switch the mains supply, and notify all departments to check the expensive equipment (such as radiology department, B-ultrasound room, laboratory, etc.). ) Be ready to switch.

4。 The leader of the emergency leading group decided to lift the large-scale power outage.

5。 The drill office issued a notice to all departments and teams, announcing the lifting of the emergency warning of large-scale power outage.

6。 The emergency leading group for large-scale power outage announced the end of the drill.

7。 Teams of all departments should report the exercise to the exercise office.

Seven. Summary of exercise evaluation

1。 In order to achieve the expected purpose of the exercise and ensure the smooth progress of the exercise, the exercise plan is reviewed.

2。 Summarize after the drill, evaluate the drill process, sum up experience and shortcomings, and form a drill evaluation report to provide reference and guidance for future work.

Eight, drilling rig safety measures and matters needing attention

1。 Propaganda should be carried out in advance to eliminate the doubts of employees and patients about the exercise.

2。 Before the drill begins, all departments and teams should take relevant safety measures, strengthen organization and leadership, and ensure the safe and smooth progress of the drill.

3。 In accordance with the emergency procedures, unified command, obey the scheduling, and strictly follow the plan.

4。 During the drill, if hidden dangers or accidents are found, the drill should be stopped in time and reported to the emergency leading group office.

5。 In case of emergency during the exercise, the exercise will be temporarily terminated.

Hospital emergency work plan template 6 emergency measures taken after power failure:

1 When the personnel on duty in the transformer room find power failure, they shall promptly notify the engineering supervisor of the management office.

2, engineering supervisor immediately to the scene, organize the electrician on duty to check the status of the power system, and timely report to the director of the management office;

3. When the main power supply is cut off due to an external fault;

1. The electrician on duty should check whether the sign of the vacuum switch is turned off, and then check the voltage and indicator light. When it is clear that there is voltage loss and power failure, according to the requirements of power industry regulations, take back the vacuum switch of the main power supply incoming cabinet and hang the sign of "No closing when someone is working";

2. The duty room electrician reports to the dispatching room of the power supply bureau to understand the external power outage;

3. The project supervisor shall report the situation to the management office manager in a timely manner, and suggest to enable the standby power supply. After the approval of the director of the management office, explain the reason for the power outage to the owner by telephone, and remind the owner to prepare for the call;

4. The engineering supervisor requires the electrician on duty to prepare for the operation. Connect the standby power supply according to the Electric Industry Ordinance;

5, check whether the equipment operation is normal, whether the power outage area has returned to normal;

6, after returning to normal power supply, timely report to the director of the management office;

7. Record the whole process of the accident in detail (power outage time, report time, name of receiver, report data, departure time, cause of the accident, etc.). );

8. When the main power supply is cut off due to an internal fault;

9, engineering supervisor organization mechanical and electrical inspection power system fault causes and timely repair;

10, strengthen the security patrol in the electric area;

1 1. The engineering supervisor shall report the situation to the director of the management office in time, and explain the reason to the user by phone after being approved by the director of the management office to remind the user to prepare for the call;

12, the engineering supervisor asked the electrician on duty to prepare for operation and conduct power transmission operation according to the regulations of the power industry;

13, check whether the equipment runs normally and whether the power outage area returns to normal;

14, report to the director of management office in time after normal power supply is restored;

15. Record the whole process of the accident in detail (power outage time, report time, name of receiver, report data, departure time, cause of the accident, etc. ).