Job Recruitment Website - Property management company - How to simply decorate a blank house?

How to simply decorate a blank house?

Simple decoration steps of blank house:

1. Pre-design: In the pre-design, you should make a detailed measurement of your room. Don't be lazy. You'd better measure it yourself. The measurement mainly includes: defining the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area and floor area; Determine the main wall size. Especially it is necessary to design the wall size of furniture in the future.

2. Demolition and renovation of the main body: In the construction stage, the demolition and renovation of the main body is the first project, which mainly includes wall demolition, wall building, wall covering, heating removal, and replacement of plastic steel windows. To put it bluntly, the main body demolition is to put up the framework of the construction site first.

3. Hydropower transformation: Before the transformation of the water circuit, the demolition and transformation of the main structure should be basically completed. Between hydropower transformation and main demolition, the first test of the cabinet should also be carried out. The so-called initial measurement of cabinets has no actual content, because the walls and floors have not been treated, and it is impossible for cabinet designers to give specific design dimensions, but only put forward some relevant suggestions on the positions of water inlets and lampblack machine sockets reserved by developers.

4. Woodworking: Woodworking, bricklayer and oiler are the "three brothers" in the construction process, and the basic order of appearance is: tile-wood-oil. The basic entry principle is-whoever is dirty goes first. "Who gets dirty first" is also one of the basic principles to determine the order of home improvement.

In fact, carpentry, such as vertical pipe, decorative ceiling and plaster line, can also be considered as the fine link of main demolition and reconstruction in a sense, which does not conflict with the water circuit reconstruction itself, and sometimes needs some cooperation.

5. Bricklayer: If the workers are busy, the foreman will generally let the "carpenter's second child" enter the field before the "bricklayer's boss" is over. This is normal, because the two do not conflict.

In the process of bricklayer's operation, it also involves the installation of the following three links: 1, the installation of threshold and marble windowsill. The installation of the threshold can be completed together with the floor tile laying, or after the floor tile laying. Generally, after the window cover is completed, the marble installation union prepares glass glue and seals the marble and window cover with glass glue. 2. Install the floor drain. Floor drain is the first hardware in home decoration, because it should be installed with floor tiles. You should buy a floor drain as soon as possible. 3. Installation of range hood. The range hood is the first appearance of household appliances. After the kitchen walls and tiles are paved, you can consider installing a range hood. When the bricklayer left, it was time to measure the cupboard for the second time. Accurately speaking, after the kitchen wall tiles are pasted and the range hood is installed, it is time to measure the cabinet for the second time.

6. Paint the wall: Oil workers enter the site, mainly to finish the basic treatment of the wall, paint the wall and paint the furniture made by carpenters. To prepare wallpaper, just let the oiler do the basic treatment on the wall where you intend to paste the wallpaper. As for whether to leave a coat for the last time, personally, I don't think it is necessary to be too serious. According to my experience in decoration, it is of little significance to leave the top coat, because the operation behind is not dirtier than painting.

It is generally understood that decoration is only the "construction link" of decoration, but in fact the "installation link" of decoration is also the focus of decoration. If the "design link" is to "conceive" what our future home will look like, then the "construction link" is to "package" our home, and the real "equipment" is almost in the "installation link".

7. Kitchen and bathroom ceiling: As an installation link, the cabinet ceiling is still continuing the "packaging" of the home. At the same time as the ceiling of the kitchen and bathroom, the moisture-proof ceiling lamp and exhaust fan (Yuba) of the kitchen and bathroom should have been bought. It is best to install the kitchen ceiling lamp and exhaust fan (Yuba) at the same time, or leave thread ends and holes.

I believe that the professional construction, the installation level of manufacturers and the products of assembly line operation are mostly slightly better than the manual work of the decoration team workers. Decoration is like a game, betting on workers' skills.

In fact, every link of decoration is very independent, and it is the key to accurately grasp the material selection, master some simple construction processes and handle the relationship with workers.

Decoration, quality always ranks first, which is the main contradiction and the big principle.

8. Kitchen cabinet installation: After the ceiling is completed, you can install cabinets at home. If it goes well, it can be finished in one day. At the same time, there are sinks (excluding water fittings) and gas stoves. It is best to coordinate the property to turn on the gas before the cabinet is installed, because the gas stove needs to be tested after installation.

9. Wooden door installation: The second day after the cabinet was installed, after the wooden door measurement was completed more than a month ago, it can probably be installed now. If it goes well, it will be a day. At the same time, hinges, door locks and floor drains should be installed. Related hardware should be prepared in advance.

10. Floor installation: The floor can be installed the next day after the wooden door is installed. If all goes well, it will take a day. Pay attention to the following problems when installing the floor: 1. Before installing the floor, it is best for the manufacturer to visit the house to investigate whether the floor needs leveling or partial leveling. Some decoration companies or decoration teams will suggest leveling or partial leveling, which will be subject to the actual survey of floor manufacturers; 2. Before the floor is installed, the floor paved at home should be cleaned to ensure the floor is dry, so do not use water during the cleaning process. 3. When installing the floor, if possible, the floor must be cut in the corridor.

1 1. Paving wallpaper: The second day after the floor is installed, clean it up and paste the wallpaper. If it goes well, it will take a day. If possible, the floor should be protected on the day of wallpaper pasting; It doesn't matter if there are no conditions, and it's no problem to leave the wallpaper glue left on the floor to Pioneer for cleaning. Before pasting the wallpaper, try to make the wall "nothing".

12, radiator installation: On the second day after the wallpaper is pasted, the person who changed or removed the radiator can hang the radiator on the wall in a down-to-earth manner. It's also a day. Wooden door-floor-wallpaper-radiator, which is recognized as the correct installation sequence. Install the wooden door first to ensure that the skirting line of the floor can be closely connected with the door cover of the wooden door; After the wallpaper was installed, it was mainly because the floor was dirty and dusty, which seriously polluted the wallpaper. Finally, install the radiator, because the radiator can only be installed after the wallpaper is laid on the wall.

13, switch socket installation: We should know or record the number and location of switch sockets in various natural rooms at home in detail, especially for wallpaper pasting workers. Sometimes wallpaper workers are irresponsible, and they don't need wallpaper knife to mark the location of your switch sockets. Therefore, you need to know yourself.

14, lamps and lanterns installation

15, hardware and sanitary ware installation

Before buying pipe fittings, bathroom fittings, toilets, clothes hangers, etc. , are all installed. After the "big things" in front are installed, the home is still very "cold". When the lamps and hardware sanitary ware are installed, the home will be "alive".