Now the public's legal awareness is increasing, and contracts are helping us more and more. The signing of the contract is the best specification of the rights and obligations of both parties. So the question is, how should we draft the contract? The following is a template of outsourcing contract for garden companies (generally 5 copies) that I have compiled. Welcome to read the collection.

Garden Company Outsourcing Contract 1 ContractNo.: _ _ _ _ _ _

Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Construction site: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Employer: _ _ _ _ _ (hereinafter referred to as Party A)

Employer: _ _ _ (hereinafter referred to as Party B)

Signing time: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Signing place: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

In accordance with the Contract Law of People's Republic of China (PRC), Regulations on Construction and Installation Engineering Contracts and relevant regulations, and in combination with the actual situation of this project, this contract is hereby signed for both parties to abide by.

Article 1 General situation of the project

(1) Project Name: _ _ _ _ _ _ Private Garden Project.

(2) Construction site: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

(3) Work content: about 65,438+000 square meters of environmental greening project. For details, please refer to the construction drawings signed and approved by Party A and the adjustment contents involved in the joint review of drawings.

The second construction section

The total duration of this project is _ _ _ _ _ days. The commencement time starts from the day after Party A approves the commencement report. ..

(a) in case of the following reasons:

1, failing to sign and examine the construction drawings and construction organization design in time;

2. Design changes;

3. Party A fails to submit the construction site on time;

4. Stop water and power for 4 consecutive hours in the rain;

5, not according to the time stipulated in the contract payment;

6. In case of irresistible factors.

(2) Completion acceptance:

1. Party A shall organize acceptance within 5 days after receiving Party B's completion report; Otherwise, it will be deemed as qualified by default, and the completion settlement will be carried out;

2. If it fails to pass the completion acceptance, both parties shall determine the rectification method and time, and the re-acceptance procedure is the same as above.

Article 3 Total Contract Price and Payment Method of the Project

(1) Settlement basis:

1, according to 1999 promulgated the "national unified building engineering foundation quota XX city base price table", civil engineering, water and electricity, decoration, gardening, installation and other related quotas. Should be implemented, the labor insurance fee is charged according to Class C, and the project category is implemented according to the quota description. Party B shall quote the missing items in the quota, and both parties shall calculate the price according to the actual situation after confirming the price; Sketch projects are priced at market price;

2. Confirmed prices of construction drawings, construction drawing budgets and unpriced materials signed and reviewed by Party A;

3. Work visas signed by Party A and Party B, and some change notices involving adjustment (change);

4. As-built drawings.

(2) Contract amount:

1, and the provisional cost of this contract is 60,000 yuan;

2, after the completion of the project acceptance according to the actual settlement.

(3) Time to pay the contract amount:

1. Within one week after Party B enters the site, Party A shall pay Party B 15% of the total contract price as a reserve fund.

2. After the project is completed and accepted, Party A shall pay 40% of the total contract amount to Party B;

3. Deal with the completion settlement within one month after the project completion acceptance. Within three months after the settlement is completed, Party A shall pay 95% of the settlement price, and the remaining 5% shall be used as quality deposit, and 3% shall be paid after the warranty period expires.

Article 4 About Design Adjustment (Change)

This project involves design adjustment (modification) project. After the adjustment materials are improved and signed by Party A, the quantities and expenses will be increased or decreased according to Article 3 of the Contract Principles.

Article 5 Warranty Period

(1) Warranty period: counting from the seventh day after the completion report is submitted. The warranty period shall be implemented according to Decree No.80 of the Ministry of Construction in 20xx. The warranty period of ordinary plants is half a year, the warranty period of precious plants (above 1000 yuan) is one year, and the warranty period of other parts of the project is one year.

(2) Survival rate: the survival rate reached _ _ _ _% when the plant management was handed over.

Article 6 Liability of both parties

(1) Party A's responsibilities:

1, to ensure that the construction site has the conditions for commencement and ensure the water and electricity needed for construction;

2. Examine and approve Party B's construction organization design and construction drawing within three days after signing the contract, and notify Party B in writing;

3, responsible for assisting in the formalities of construction approach;

4, responsible for coordinating the relationship between the site construction units;

5. If the construction changes, it shall notify Party B in writing;

6. Pay on time according to the time stipulated in the contract.

(II) Party B's responsibilities:

1. Organize the construction according to the construction drawing signed by Party A and the confirmed change notice, and in combination with relevant specifications;

2. Accept the supervision of the supervision company designated by Party A and the management of Party A's on-site representative;

3. Pay attention to the cooperation with the construction site of the external decoration unit;

4, civilized construction, safe production, to ensure the quality of the project, completed on schedule;

5, responsible for the protection of finished products in the construction.

Article 7 Site representatives and responsibilities of Party A and Party B.

(1) Construction Manager of Party A: _ _ _ _ _ _ _ _ _ _ _

On-site representative: _ _ _ _ _ _ _ _ _ _ _ _

(II) Person in charge of Party B's construction: _ _ _ _ _ _ _

Civil engineering: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Greening: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

On-site representative: _ _ _ _ _ _ _ _ _ _ _ _

(3) The representative of Party A is the on-site visa representative; The representative of Party B is the representative who accepts the written notice from Party A. ..

Article 8 Identification and Procurement of Materials

(1) Party B shall purchase materials by itself according to the design requirements, and materials related to decoration and lamps shall be approved by Party A before purchasing.

(2) Changes in design data shall be confirmed by the design unit and Party A * *, and Party B shall be informed in writing before Party B can purchase them.

Article 9 Liability for breach of contract

(1) Party A's liability for breach of contract:

1. If Party A fails to fulfill its obligations under the contract, it shall not only postpone the completion date, but also compensate Party B for the actual losses;

2. Party A shall take measures to remedy or reduce the work stoppage caused by suspension, extension or design change.

Less losses, and at the same time compensate Party B for the actual losses such as mechanical equipment shutdown, slowdown and rework;

3. If Party A fails to make payment as stipulated in the contract, Party A shall pay Party B a penalty of 0.3% of the total contract amount for each day overdue.

(II) Party B's liability for breach of contract:

If Party B fails to complete the project as stipulated in the contract, and the project progress is affected by unreasonable delay, Party B shall pay liquidated damages to Party A at the rate of 5‰ of the total contract amount for each day of delay.

Article 10 Dispute settlement methods

During the performance of the contract, disputes arising from the performance of the contract shall be settled through consultation. If negotiation fails, both parties agree to bring a lawsuit to the people's court where the construction is located.

Article 11 This contract shall come into effect after being signed and sealed by both parties.

Article 12 Matters not covered in this contract shall be settled by both parties through consultation.

Article 13 This contract is made in quadruplicate, with each party holding two copies, all of which have the same legal effect.

Party A (seal): _ _ _ Party B (seal): _ _ _

Legal representative: _ _ _ _ _ _ Legal representative: _ _ _ _ _ _

Authorized Agent: _ _ _ _ _ Authorized Agent: _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Contract 2 of Garden Company: _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party A)

Contractor: _ _ _ _ _ _ _ _ _ _ _ _ _ _ (hereinafter referred to as Party B)

In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant regulations, and in combination with the specific conditions of this project, this contract is hereby signed by both parties through consultation for their compliance.

Article 1 General situation of the project

1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Project location: located in _ _ _ _ _ _ _ _ _

3. Scope and content of project contracting: greening of open space in the community (see drawings and list for details). )

4. Contracting method: Party B shall plant trees and green trees according to the plan determined by both parties.

Article 3 Project contract cost:

The estimated contract cost of this project is RMB _ _ _ _ _ _ _ (in words: _ _ _ _ _ _).

Article 4 Payment and settlement of project price

1. After the greening planting is completed, Party A shall pay 70% of the total contract cost to Party B within one month;

2. After the maintenance period expires, pay the final payment of the contract.

Article 5

1. Seedling survival and maintenance period: one year.

2. Party B shall be responsible for all maintenance processes during the maintenance period to ensure the vigorous growth of seedlings.

3. Party B is responsible for planting and living, and all expenses incurred during maintenance shall be borne by Party B. ..

4. If the trees die during Party B's maintenance, Party B shall be responsible for replanting, and the expenses shall be borne by Party B. ..

Article 6 Project Quality and Inspection and Acceptance

1 Article 2 Project Duration: _ _ _ _ _ _ _ _ _ _ _ Project Duration: _ _ _ _ _ _ _ Project Duration: _ _ _ _ _ _ _ Project Duration

1. Engineering quality requirements 100% survival.

2. Party B must carry out the construction in strict accordance with the construction drawings and accept the on-site supervision and inspection by Party A. ..

3. After the maintenance period expires, Party A shall organize the completion acceptance in time, and hand over the project to Party A for management after passing the acceptance.

Article 7 Matters for both parties.

1. Party A

(1) Provide the construction site as required, and provide Party B with construction water free of charge.

(2) Organize the project completion acceptance, and cooperate with Party B for completion settlement according to the date stipulated in the contract.

2. Party B

(1) The construction site is leveled.

(2) Ensure the quality of the project, and complete the delivery as scheduled according to the time stipulated in the contract.

(3) Responsible for site management and cleaning before the project is completed.

Article 8 In case of any dispute during the performance of this contract, both parties shall settle it through negotiation in time. If negotiation fails, it shall be arbitrated by an arbitration institution determined by both parties through consultation.

Article 9 Supplementary Provisions

Matters not covered in this contract shall be implemented in accordance with the Contract Law of People's Republic of China (PRC) and relevant regulations.

This contract shall come into effect after being signed and sealed by both parties. After the completion of the contract project, conduct inspection and settle the balance of the project. After the maintenance period, it will naturally fail.

This contract is made in duplicate, one for each party.

Employer (seal) _ _ _ _ _ _ _ Contractor (seal) _ _ _ _ _ _ _

Legal representative: _ _ _ _ _ _ _ _ Legal representative: _ _ _ _ _ _ _

Date of signing this contract: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ \

Garden Company Outsourcing Contract 3 Party A:

Party B:

Through negotiation, Party A and Party B reach the following agreement on Party A entrusting Party B with greening project construction:

I. Contents of the Project

Including the greening project designed by Party A (see the drawings and quotation sheet for details). The above projects shall be constructed in accordance with the items, specifications, remarks, quantities and requirements listed in the drawings reviewed by both parties.

Second, the construction period

1. Commencement date: The construction period of this project starts from _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

2, during the construction period, if due to water, power, heavy rain, rainstorm and other reasons or Party A's written confirmation of the time limit for a project can be.

3. If Party A fails to hand over the construction site in time, the construction period will be postponed.

Third, the project contract price

Through negotiation, the total contract price of this contract is RMB.

Fourth, the project payment method

1, and allocate funds according to the project progress. Pay 60% to Party B within one week after planting.

2. After the project is completed, Party A and Party B shall pay 80% of the contract price within one week.

3. Party A shall pay the balance before the end of the maintenance period.

Five, the engineering quality requirements

1. Party B must carry out the construction in strict accordance with the contents and requirements of the design and construction drawings approved by Party A and the relevant landscaping construction specifications. In the process of construction, Party B must obey the supervision and management of Party A. If Party B is found not to meet the requirements of the construction drawings and violate the operation specifications, and the saplings do not meet the specifications, Party A has the right to propose and require rework and modification, and all economic losses caused by its shutdown and rework shall be borne by Party B. ..

Six, the project completion acceptance settlement

Party B shall submit completion data and acceptance report to Party A within five days after completion, and Party A shall organize relevant departments to conduct acceptance within five days after receiving the completion acceptance report. If the project cannot be accepted on time due to Party A's reasons, it will be deemed as qualified by default and settled as completed.

Seven. defects liability period

The greening maintenance period is 12 months from the date of planting completion. After the maintenance period expires, Party B shall notify Party A for acceptance.

Eight, some provisions of the two sides in the construction.

1. During the construction period, if Party A has any modification or adjustment, it shall notify Party B 10 days in advance, and send the modification or drawings to Party B.. If Party B finds any problems, it shall report to Party A two days in advance, and the construction can only be started after being handled by Party A and the design department.

2. During the construction period, Party B must do a good job in safety production prevention, implement various safety measures, ensure construction safety, undertake all construction safety accidents, and educate construction personnel to abide by the law.

3. Party A is responsible for providing Party B with the construction site (which should meet the requirements of "three links and one leveling"), the location of water and electricity within the construction scope, the location of survey baseline and leveling points, and the underground pipe network map within the construction site. If Party A fails to provide the construction site in time, Party B has the right to postpone the construction period.

4. Party A is responsible for coordinating the relationship between construction sites and ensuring the construction progress of Party B. ..

5. Party B shall assign special personnel to keep in touch with Party A and coordinate the site construction. The civil works undertaken by Party B shall closely cooperate with the relevant installation procedures and require written contact.

6. After the project is completed, Party B is responsible for cleaning up the garbage within the construction scope so as to clean up the site after work.

Nine. Entry into force and termination of contract

This contract shall come into effect after being signed and stamped by the legal representatives of both parties. Upon the expiration of the project warranty period, this contract shall be terminated after Party A settles the payment.

X this contract is made in duplicate, one for each party, with the same legal effect. Matters not covered in the performance of the contract shall be settled through negotiation as far as possible. Relevant agreements can be countersigned, and the countersigned agreement has the same legal effect as this contract.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Garden Company Outsourcing Contract 4 Employer (Party A):

Contractor (Party B):

After investigation and price comparison, Party A decided to give Party B the _ _ _ _ greening project. In order to ensure the timely and quality completion of this project, both parties, based on the principle of mutual support and close cooperation, and in combination with the specific conditions of this project, clearly define their respective responsibilities, hereby sign this contract with the following terms:

I. Project name:

Second, the project site selection:

Three. Total project cost: RMB yuan

Four. Duration: the duration is _ _ _ _ calendar days, counting from the date when Party A notifies the commencement.

Verb (abbreviation of verb) preparation for construction: Party A shall make the construction site have the pre-construction conditions and continue to solve the problems left over from the project after construction; Party A shall prepare construction drawings and technical disclosure before construction; Party B shall make a material plan as soon as possible after receiving the drawings.

6. During the construction, if Party A adjusts the seedlings according to the actual needs, Party B shall plant them according to Party A's requirements, and the increased or adjusted part shall be settled according to the actual planting quantity.

7. Payment of project funds: Party A shall pay 90% of the project funds to Party B after the seedlings are planted and accepted. The balance 10% shall be paid after the warranty period of 12 months expires.

Eight, the project quality:

1, the quality of planted seedlings must meet the engineering requirements, and plant varieties, specifications and quantities in strict accordance with the construction drawing and seedling list (see attached table).

2. In the process of construction, Party B must obey the supervision and management of Party A. In case of shutdown due to quality problems, all expenses shall be borne by Party B..

3. Party B shall ensure that the construction site is clean and clean up the garbage in time.

Nine, maintenance management and requirements:

1. After planting, water and water in time, intertillage and weed, fertilize and prune in time to ensure the normal growth of seedlings.

2. After the planting is completed, Party B shall maintain 12 months, and the expenses incurred during this period shall be borne by Party B. ..

X. entry into force and termination of the contract:

This contract shall come into effect after being signed and sealed by both parties, and shall be terminated when Party A completes the completion settlement and payment and Party B delivers the project to Party A.. ..

XI。 This contract is made in quadruplicate, all of which are equally authentic. Party A and Party B each hold two copies. Matters not covered shall be settled by both parties through consultation.

Party A (official seal): _ _ _ _ Party B (official seal): _ _ _ _ _

Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Garden Company Outsourcing Contract 5 __ _ County Forestry Management Station (or County Forestry Bureau), hereinafter referred to as Party A;

Villagers in _ _ _ county _ _ township _ _ village, hereinafter referred to as Party B. ..

In order to promote afforestation, speed up greening and meet the needs of provenance, Party A and Party B, through full consultation, hereby conclude this contract for mutual compliance.

Article 1 Contract Contents, Nursery Area and Location

Party A will contract _ _ seedlings, _ _ seedlings and _ _ seedlings to Party B, and Party B will set aside _ _ mu of land as _ _ nursery according to the contracted task, and the location is _ _.

Article 2 Term of Contract

The term of this contract is _ _ _ _ years, from _ _ _ _ _ _ _ _ to _ _ _ _ _ _ _ _ _.

Article 3 Rights and Obligations of Party A and Party B

1. During the contract period, Party B * * * cultivated _ _ seedlings, _ _ seedlings and _ _ seedlings for Party A. Among them, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2. Party A provides Party B with _ _ _ Jin of tree species and _ _ Jin of tree species, and the emergence rate of tree species reaches above%; _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ During the contract period of _ _ _ _ _ _ _ _ _, Party A shall provide Party B with _ _ yuan for seedling raising, including _ _ yuan in the first year and _ _ yuan in the second year, and Party A shall provide Party B with _ _ Jin of chemical fertilizer every year. The time for Party A to allocate funds and provide fertilizers to Party B is before _ _ _ _ _ _ _ every year.

3. Party A shall teach Party B the cultivation techniques of various saplings free of charge, provide reference materials for seedling raising, and send technicians to guide them at least _ _ times every quarter.

4. When the seedlings leave the nursery, Party B shall ensure that the height of the seedlings is not less than _ _ m and the surface diameter is not less than _ _ cm; _ _ The height of the sapling is not less than _ _ meters, and the surface diameter is not less than _ _ centimeters. All kinds of saplings are not allowed to have rotten roots and black roots, and there are no serious pests and diseases.

5. Party B is responsible for planting seedlings according to varieties, quantity and quality on time, and Party A is responsible for underwriting before _ _ _ every year. The price of each sapling is RMB, RMB and RMB, and the price shall be settled by Party A and the buyer. Party B shall send the sapling to the buyer according to the bill of lading issued by Party A, and Party B shall be responsible for bundling the sapling after it leaves the nursery.

6. When the buyer purchases a large number of saplings, Party A, Party B and the buyer shall conduct sampling inspection on saplings coming out of the nursery, and Party B shall make up the unqualified parts in proportion.

7. After the saplings are sold, both parties shall complete the settlement procedures within _ _ days, and the saplings shall be divided into _ _: _ _, with Party A getting _ _% and Party B getting _ _%. If the sales price of saplings rises or falls due to the price adjustment of relevant departments, both parties shall increase or decrease in proportion.

Article 4 Liability for breach of contract

1. If Party A fails to provide qualified seedlings to Party B as stipulated in the contract, Party A shall pay liquidated damages to Party B at% of the value of unqualified seedlings and reduce the number of seedlings cultivated by Party B accordingly. If losses are caused to Party B, Party B shall also be compensated for the losses.

2. If Party A fails to provide Party B with seedling raising funds and chemical fertilizers in time as stipulated in the contract, it shall pay liquidated damages to Party B according to the bank's regulations on deferred payment, and correspondingly reduce or exempt Party B's seedling raising obligations. If Party A fails to sell saplings on time and in quantity, Party A shall pay Party B the remuneration according to the selling price of saplings stipulated in the contract and the commission rate due to Party B..

3. If Party B fails to produce qualified seedlings as stipulated in the contract, it shall pay a penalty of RMB yuan to Party A for each tree seedling produced less; If Party B fails to deliver the seedlings to the buyer within the time stipulated in the contract, Party B shall pay Party A a penalty of RMB per 100 seedlings for each day of delay. If Party B sells saplings and a plant privately, it shall pay liquidated damages to Party A..

Article 5 Force Majeure

If losses are caused to Party B's contracted seedling cultivation due to force majeure natural disasters, after investigation and confirmation, Party A shall actually reduce or exempt Party B's obligations.

Article 6 Other matters agreed by both parties _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

This contract shall come into force from the date of signing and terminate at the expiration of the contract. If both parties are willing to continue cooperation after the expiration of the contract, they must sign a new contract. During the execution of the contract, neither party shall change or terminate the contract at will. This contract shall not be changed due to the change of representatives of both parties. If there are any matters not covered in the execution of this contract, both parties shall supplement them through consultation. Supplementary terms have the same effect as this contract.

The original of this contract is in duplicate, one for each party; This contract is made in _ _ _ copies, and sent to the township government, village committee (if notarization or certification is needed, it shall be sent to the notarization or certification authority) and other units, one for each.

Party A: _ _ county _ _ township forestry management station (or county forestry bureau) _ (official seal)

Representative: _ _ _ (seal)

Party B's _ _ county _ _ township _ _ village _ _ (official seal)

Representative: _ _ _ (seal)

Completed in _ _ _ _ _ _ _ _ _