Inadvertently, a piece of work is over. Looking back on this period, the results are hard-won. Do a good job and write a work summary. So, have you mastered the format of work summary? The following is my summary of supervision engineer's work for reference only. Welcome to reading.

Summary of Supervision Engineer's Work1March 12, I applied for the job of Changzhou Cheng Zhen Construction Engineering Supervision Company and was assigned to three relatively close construction sites (far from my home) to supervise civil engineering. I have been working for three months now. With the help of company leaders and comrades, I have successfully completed the corresponding supervision tasks in the past three months, which has been recognized and praised by the owners and contractors. During my supervision work, I worked hard and conscientiously, and did not dare to be tired. I work hard and have a good professional ethics and a strong sense of responsibility. Now I will make the following report on my work and supervision experience in the past three months.

I. Work situation

Just arrived at the construction site, in a different place, but faced with objective unfavorable factors such as large supervision tasks, wide supervision area and few supervision personnel. So I did encounter some difficulties in the actual supervision work. I didn't flinch in the face of difficulties, and I made progress despite all the difficulties. In practical work, I actively communicate with the owners and contractors to coordinate various relationships, so as to carry out supervision work as soon as possible, and take the time to familiarize myself with the construction drawings and related design instructions. In the shortest possible time,

In the actual supervision work, I require the construction unit to implement total quality management, establish and improve the quality assurance system, and make reports on commencement, construction measures, technical disclosure, positioning review, material and equipment inspection, concealed works, quality inspection, special inspection and completion data.

In the aspect of engineering quality control, we should combine active control with passive control, actively carry out supervision work, and focus on prevention. Review the contractor's qualification, focusing on the enterprise registration certificate and technical level, submitting relevant documents (copies), understanding the general situation of technical force, main building installation experience, etc. , and check the supply of sand, stone, cement, steel and the mixture ratio of concrete and mortar.

According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, put forward improvement suggestions in view of its shortcomings, and check the original vouchers, test reports and other quality certification documents of the purchased materials.

Control in advance to ensure that engineering quality accidents do not occur or occur less. Such as winter construction, low temperature, concrete pouring, masonry, wall plastering and other quality problems. It is not easy to guarantee. Therefore, the construction unit is required to provide a winter construction plan to prevent in advance and avoid freezing injury.

For important engineering parts and subdivisional works prone to quality problems, quality pre-inspection measures shall be formulated. For example, in the concrete pouring project of civil engineering, the leveling of beam is a key part of the project, which involves many processes such as wall masonry, formwork, steel bar binding, concrete pouring and so on. Once negligence may cause engineering quality accidents, once quality problems occur, the consequences will be serious. Therefore, in this part of the construction, strengthen monitoring, take on-site supervision measures, and strictly supervise the construction of various parts, which will affect the construction quality.

Strengthen process control. During the construction supervision of Wujin Jian 'an Construction Team, it was found that there were quality problems in the building material fly ash bricks used by the team. Although the contractor has a laboratory quality inspection report, in the attitude of being responsible to the owner, the batch of bricks are sampled by parallel inspection in time, and the construction unit is allowed to use it only after all the strength indexes are determined to meet the design requirements. There are also quality problems in concrete pouring, masonry and wall plastering. In order to ensure the construction quality, I issued a supervision notice in time, requiring the construction unit to repair the defective parts to meet the quality standards required by the design and specifications.

In the supervision work, the construction unit is required to carry out the construction according to the design content, design requirements and construction acceptance specifications to ensure the construction quality. In the construction of each working procedure, the construction unit is required to strictly implement the national and local construction and installation quality inspection system, check and confirm the relevant construction quality statements submitted by the construction unit in time, and review and sign the completed project quantities declared by the contractor according to the design documents and the provisions on the calculation of quantities in the contract.

Supervision record is an indispensable part of engineering supervision. I have a complete and sufficient supervision diary, which records the relevant situation of the construction site every day in detail, providing a reliable basis for solving the dispute between the owner and the contractor fairly. During the supervision of the three construction sites, I actively coordinated the relationship between various units, making them cooperate with each other, support each other, and do a good job of cohesion to ensure the construction quality and progress. Through the above work, I completed the supervision of the workshop office building project of Tian Li Turbocharger Equipment Co., Ltd., the workshop office building project of Changzhou Yamazaki Motorcycle Equipment Co., Ltd. and the civil engineering project of Zhongdi Electric Co., Ltd., and gained a lot in three months' supervision, but there are still some shortcomings. For example, I am an environmental engineering major, and I don't know much about the professional knowledge of civil engineering, and some process requirements are not very familiar. However, the supervision industry requires supervision engineers to have rich knowledge in many disciplines and industries, so I need to continue to study hard in various disciplines and constantly improve my professional ability and level.

Second, some suggestions.

1. Strictly implement the supervision procedures.

At present, the on-site supervision work is not completely carried out in accordance with the supervision procedures, such as design disclosure, joint review of drawings, first site meeting, introduction of supervision engineers and supervision contents to owners and contractors, formulation of supervision plans and supervision details, etc. , leading to the supervision engineer to the scene after no one cares, do not know the scope of supervision and how to supervise and other practical problems. In order to avoid the recurrence of such problems in the future supervision work, it is necessary to strictly implement the project construction supervision procedures so that the supervision engineer can clearly supervise.

2. Improve the organization of the project supervision department.

Project supervision institutions are fully staffed, with clear responsibilities of chief supervision engineers, professional supervision engineers and supervisors, and complete communication and transportation facilities. Due to the long route and wide area of municipal engineering supervision, only convenient transportation can ensure the inspection and on-site supervision of each construction section, so that there will be no mistakes in the supervision work and the quality of the supervision work will satisfy the owner.

3. Train supervisors to improve the quality of all employees.

Strengthen the training of supervisors, organize employees to seriously study the Supervision Code and Changzhou Local Engineering Construction Supervision Regulations, unify supervision standards, participate in various classes organized by the Municipal Construction Committee and quality supervision stations, master new policies and standards, and lay a good foundation for supervision work. The above is a summary of my supervision work in the past three months. Because of my short working time in the company, some problems may be one-sided, and there are still many shortcomings in my work. Please ask the company leaders and colleagues to make more corrections in their future work.

Third, the internship experience

The intense three-month internship life is over, and I still have a lot of gains in these three months. It is necessary to sum up after the internship. First of all, through more than three months of internship and practice, I have learned a lot of practical knowledge. The so-called practice is the only criterion for testing truth. Through practice, I have closely observed the whole building construction process and learned a lot of applicable and specific construction knowledge, which I seldom contact and pay attention to at school, but it is also very important and basic knowledge. While studying and practicing many specific construction methods in and out of class, I also have a more real and in-depth understanding of many specific construction details and management processes. Construction project is the construction process and achievement of a building product by the production object of a building construction enterprise, which can be the construction of a building project, or the construction of a single project or a unit project. Its main features are: first, the construction task of building projects or single projects or unit projects; Second, the enterprise construction enterprise is the main body of management; Third, the scope of the task is determined by the project contract. Construction project management includes the following aspects:

A, the organization and management of construction projects

Second, the construction quality management

Third, the cost management of construction projects

Four, construction safety production and civilized construction management

To manage a project well, it is necessary to control the specific construction steps from all aspects. The management experience and practices mentioned above are all obtained by combining knowledge learning with construction site work in recent years. College life is tense and full of expectations. In my spare time, I always look forward to packing my bags, staying away from my relatives and friends and teachers, and going my own way. However, when we can finally leave the nest built by our elders and walk on the big stage of social work like a fledgling eagle, we find that the road of life is so bumpy that everyone's success has experienced some storms. During the short three-month internship, I learned a lot. I continued to work hard and study in the society, adjusted my mentality, changed from a passive state when I first started social work to an active state when I started to adapt to society, and continued to devote myself to intense work with a relaxed mood and abundant energy. This internship made me deeply realize that reading is a way to increase my knowledge and broaden my horizons, but it is also an excellent choice to improve my comprehensive quality through more practice, being in the middle of practical things, touching the pulse of society and setting a position for myself.

The school arranged an internship to learn practical knowledge in the big school of society. This is also my first real contact and feeling with society. I am very happy to come to Changzhou Cheng Zhen Supervision Company, and I am honored to meet these masters to take me, give me knowledge and help in my work, let me fully combine theory and practice in practice, and make clear my future development direction. Although I encountered some language obstacles in the early stage of my internship, I made clear my own shortcomings, studied hard, worked hard and actively faced every new opportunity.

Summary of supervision engineer's work 2 20XX years passed quickly. During this year, with the care and help of company leaders, department leaders and colleagues, my work ability and professional skills have been further improved. At the end of this year, I will sum up my achievements and gains in my work, so as to find out the shortcomings, so as to better complete the salary task in the future. I sincerely hope that everyone will correct the improper summary, which will help me a lot.

In the past more than a year, I worked as a supervision engineer in yuqing county West New Town Project 1, which involved many specialties such as civil engineering and decoration. As a supervision engineer, I feel that there is a long way to go, especially the construction of many buildings, which has a large amount of work, high construction difficulty and high quality requirements. According to this feature, under the leadership of the director and general manager of the project supervision department, I made a targeted and feasible supervision plan. From the foundation to the main body, we will supervise all construction procedures in strict accordance with the supervision specifications, drawing design and the current national construction quality acceptance specifications, focusing on quality control of building materials and construction technology to ensure the safety of building structures, reviewing material quality assurance materials and re-inspection reports, witnessing sampling and inspection of raw materials needed for the project, and reviewing test results to ensure the quality of raw materials. Strictly check the quality of steel bar binding, the thickness of steel bar protective layer and the concrete pouring in the main construction process, notify the project department of the construction unit orally or in writing in time for the problems found in the patrol inspection in each construction process, report to the director and the construction unit in time, urge the construction unit to carry out rectification and re-inspection, and require the supervisors to do a good job in on-site supervision of key parts. We will do our best to control the quality of supervision in advance and in the process, fulfill our duties, adhere to the strict implementation of supervision in accordance with the drawings, specifications and contracts, and ensure the acceptance of all disciplines and divisions.

During the supervision of the main structure construction site, I deeply felt my own shortcomings in the main structure engineering. After consulting a large number of technical specifications and construction acceptance specifications, I have mastered the technology and experience related to the main structure through my own study and practice. From formwork erection of the main structure to steel bar installation and concrete pouring, I strictly checked the construction quality of each working procedure, including steel pipe members, steel bar types, steel bar anchorage, lap length, steel bar raw materials and concrete semi-finished products. Carefully review whether the relevant materials are complete, check whether the quality assurance materials are consistent with the batch number of materials, and witness the sampling of relevant materials for inspection, all of which meet the design and specification requirements. Especially for the quality of steel bars and concrete, the constructor is required to carry out witness sampling and inspection according to the specification requirements, so as to ensure the engineering quality of the main structure.

According to the characteristics of the project and the key parts that affect the quality of the project, review the construction organization design submitted by the contractor, put forward improvement suggestions in view of its shortcomings, and check the original vouchers, test reports and other quality certification documents of the purchased materials. And do a good job in advance control to ensure that engineering quality and safety accidents do not occur or less. Such as winter construction, low temperature, concrete pouring, masonry, wall plastering and other quality problems. It is not easy to guarantee. Therefore, the construction unit is required to provide a winter construction plan to prevent in advance and avoid freezing injury.

For important engineering parts and subdivisional works prone to quality problems, quality pre-inspection measures shall be formulated. For example, in the concrete pouring construction of civil engineering, beams and columns are the key parts of the project, involving formwork, steel binding, concrete pouring and other processes. Once negligence occurs, engineering quality accidents may occur, and once quality problems occur, the consequences will be serious. Therefore, in this part of the construction, strengthen monitoring, take on-site supervision measures, strictly supervise the construction of various parts, and pay attention to the factors affecting the construction quality in advance.

In order to strengthen the control in the process, it is found that there are quality problems in the self-mixing pumped concrete used by the construction unit, which makes the local ground beam strength fail to meet the design requirements. Although the contractor has the quality inspection report of the laboratory, in the attitude of being responsible to the owner, the batch of concrete is sampled by parallel inspection in time, and the construction unit is allowed to use it only after its strength index meets the design requirements. There are also quality problems in masonry and wall plastering construction. In order to ensure the construction quality, I issued a supervision notice in time, requiring the construction unit to repair the defective parts to meet the quality standards required by the design and specifications.

In the supervision work, the construction unit is required to carry out the construction according to the design content, design requirements and construction acceptance specifications to ensure the construction quality and leave no potential safety hazards. In the construction of each working procedure, the construction unit is required to strictly implement the national and local engineering quality inspection system, check and sign the relevant engineering quality reports and hidden materials submitted by the construction unit in time, and review, sign and record the completed engineering quantities declared by the contractor according to the provisions on engineering quantity calculation in the design documents and contracts.

Supervision record is an indispensable part of engineering supervision. I have a complete and sufficient supervision diary, on-site record and safety supervision diary, which records the relevant situation of the construction site every day in detail, providing a reliable basis for solving the dispute between the owner and the contractor fairly. During the supervision of plot 1, I actively coordinated the relationship between various units to make them cooperate with each other, support each other, and do a good job of connection, thus ensuring the timely completion of construction quality and progress. Through the above work, I have completed the plot 1/building 1-2#, 1-3#, 1-4#, 1-5# and 1-9#. 1- 16#、 1- 17#、 1- 18#、 1- 19#、 1。 Architecture 1-27#, 1-28#, 1-29#, 1-30#, 1-33#, 1-36#, but there are also some. For example, I am a professional in construction engineering management, and I don't know much about hydropower expertise, and some process requirements are not very familiar. However, the supervision industry requires supervision engineers to have rich knowledge in many disciplines and industries. Therefore, I need to continue to study hard in various disciplines and constantly improve my business ability and professional level.

In a word, the experience I got from more than one year's work is that as a supervision engineer, I should not only have rich professional knowledge, but also have strong communication and coordination skills. Only by constantly improving their professional and technical level and business ability, improving their communication skills and adaptability to the environment, can they better serve the construction of the project and make themselves develop better. Different pressures at work are also rare challenges and tests for me. Although there were many difficulties and twists and turns in my work over the past year, looking back, I still learned a lot and learned a lot. At the same time, it also summarizes many experiences and lessons, laying a solid foundation for better work in the future.

The year of 20XX has arrived. In this new year, I will constantly improve my own shortcomings, sum up experience and lessons, constantly improve my professional and technical level and professional quality, and constantly enrich myself. I firmly believe that with the great help of company leaders and colleagues, I will be able to complete my tasks better and make my due contribution to the company.

Summary of supervision engineer's work 3. It has been 1 year since I worked as an intern in Beijing Project Department of xx Provincial Traffic Construction Engineering Supervision Corporation in May of 20XX. During my internship in 1 year, under the guidance of my leaders and my own efforts, my professional knowledge and practical ability have taken a big step forward. Meanwhile, as an intern, do my job well. The work is summarized as follows:

I. Work performance

As an intern, I have always asked myself to be a supervisor. In order to do a good job of supervision, I am strict with myself, pay attention to setting an example and be honest with others. I have been working hard, uniting my colleagues, working actively, studying hard, consulting the supervisor and supervision engineer in time when I encounter difficulties in my work, and constantly improving my professional and technical level. Carry forward the spirit of hard work. Not afraid of hardship, take the initiative to find a job, be diligent in eyes, mouth, hands and legs, actively adapt to various harsh environments, hone your will and increase your talents in heavy work. Strengthen study, be brave in practice, read widely, pay attention to collecting all kinds of information while learning from books, and absorb all kinds of "nutrition" extensively; At the same time, correct learning attitude, improve learning efficiency, and strive to cultivate their correct thinking and practical work style.

First, love their jobs and be dedicated. The law of supervision industry is "nonstandard". Therefore, I correctly understand my work and value, correctly handle the relationship between bitterness and pleasure, gain and loss, personal interests and collective interests, and adhere to professionalism, integrity and professionalism.

The second is to temper business and improve. After a year's study and exercise, I have made some progress in the data arrangement and site management of highway industry. I use the project department to learn the highway engineering supervision standard and the owner's organization to learn the data management method, earnestly learn the strengths of others, get rid of my own shortcomings, and humbly ask leaders and colleagues to improve my data arrangement level through continuous learning and exploration.

(2) Be strict with yourself and constantly strengthen the construction of work style. Over the past year, I have been strict with myself, always taking plain, willing to pay and obscurity as my own criteria, and always focusing on rigorous, meticulous, down-to-earth and hard work in style construction. In the work, regulate all your words and deeds with systems and disciplines, strictly abide by the company's rules and regulations, respect leaders, unite with comrades, be modest and prudent, take the initiative to accept opinions from all sides, and constantly improve your work; Insist on doing things that are not conducive to the company's image, and actively maintain the company's good image.

Second, the shortcomings in the work and the direction of future efforts

Although the work has made some progress in the past year, there are still some shortcomings, mainly the lack of ideological emancipation, laziness in study and work, and a certain gap compared with the supervisor. In my future work, I will conscientiously sum up my experience, overcome my shortcomings and strive to do better. We should also set high standards and be strict with ourselves, strengthen the study and study of political theory and professional technology, integrate theory with practice, constantly improve ourselves, improve our overall quality, and make greater contributions to the highway cause with practical actions.

How time flies! My three-month probation period ended in a blink of an eye. This is a precious experience in my life, which left a deep memory for me. During this period, the leader gave me enough tolerance, support and help, which made me fully feel the mind of "all rivers run into the sea", the heroism of being a man "how can I see a rainbow without experiencing wind and rain", and the difficulty and firmness of an engineer as a pioneer. While I am in awe of them, I am also surprised that I have the opportunity to become a member of the engineering community.

When I first came to the company, although I graduated from civil engineering, I didn't actually come into contact with the engineering industry, so I didn't know much about construction, because there was a big difference between theory and practice, so it became my top priority to really understand the meaning of engineering, know the specific steps of construction and pay attention to various matters during the probation period.

When I first arrived at the construction site, I felt at a loss and didn't know how to start and where to start. Under the guidance of project manager and construction supervisor, I gradually know what I should do and what I can do. Here, I would like to express my sincere thanks to all the leaders and colleagues who have helped me. My personal work is summarized as follows:

1. When I got here, I got to know all the leaders and the staff of various construction teams. I contacted them voluntarily. Through them, I learned the general situation of the project and the situation of each project, and I knew the specific construction steps of these projects.

Through my efforts to go to the construction site every day, I know the matters that should be paid attention to in construction (such as steel bar and concrete pouring), how to ensure the smooth progress of construction, how to save materials and so on.

3. Because I usually help to do some information, I am familiar with the general work flow and work content, and cultivate the librarian's careful and serious work attitude. At the same time, I have been exposed to the knowledge of budget settlement, and I will try my best to deal with these problems independently.

On the construction site, I not only learned the knowledge of civil engineering, but also learned some knowledge of indoor decoration and water and electricity installation through on-site observation and operation.

5. Because I have done measurement before, I can operate instruments such as level and total station smoothly here, and I can independently calculate the engineering quantity for the construction team, and so on.

6. In other aspects, I came to Jiuzhai construction site and met many friends and colleagues. In my spare time, I will ask them for some work-related knowledge. Although sometimes I can't get satisfactory answers, I feel very happy to get along with them. I will try my best to help them if they need it.

7. I also have many shortcomings in my work, such as not being active enough sometimes. Because I am a novice in this project, some details are not handled perfectly, so I believe I will try my best to do better in the future.

The above are my achievements and shortcomings in the past three months, but I know that this is still far from the requirements of the company and leaders. In the future work, I will work harder to satisfy the company and leaders. In my spare time, I will review my theoretical and cultural knowledge, and strive to obtain relevant qualification certificates as soon as possible. I believe that theory combined with practice will definitely lead me to success. I will give full play to my personal advantages and contribute to the company. Thank you!

Summary of supervision engineer's work in 4 XX years, I was transferred to the laboratory of the first resident office in the west section of the west transit highway as testing engineer. With the support of the leaders and the active cooperation of my colleagues, I successfully completed this year's supervision examination on the principle of "strict supervision, enthusiastic service, fairness and meticulousness". The supervision work in XX years is now reported as follows:

1. The resident office has actively purchased testing equipment and instruments, installed, debugged and calibrated them, and applied for temporary qualification on site. At the same time, the implementation rules and supervision rules and regulations of the test have been continuously improved, and various charts have been put on the wall and passed the acceptance of the provincial quality inspection station at one time, which has the test conditions for the construction preparation stage. While building the resident laboratory, supervise and check whether the contractor's entry test personnel and equipment meet the requirements of construction and contract and the development of all work, and require the contractor to establish and improve the quality self-inspection system, so as to lay the foundation for the smooth start of construction.

2. Before construction, firstly, according to the requirements of design drawings and specifications, the standard compaction degree of various raw materials, concrete mixture ratio, soil and lime soil proposed by the contractor shall be tested and verified, so that all indexes can meet the requirements of construction specifications and design drawings and provide reliable and accurate test basis for comprehensive construction.

3, material quality control, is the focus of our test supervision quality control, the premise of qualified products is to have qualified raw materials, which is my most personal experience in highway engineering construction, material factory certificate and the model, specification, factory date, etc. Inspection, contractor's self-inspection and supervision sampling control, investigation and re-inspection of suspicious materials are the main contents of our daily material quality control, and unqualified materials are refused to enter the construction site.

4, the construction process control, each subdivisional work or single project before start working, supervision and testing personnel to check the concrete mixture ratio, before start working, observe the workability of concrete at any time during the construction process, always keep within the scope of the design requirements, to ensure the internal quality of concrete, at the same time, the contractor and supervision to make representative concrete specimens, as one of the quality control indicators of the project.

Xxx years passed quickly. Looking back on the supervision work in the past six months, the deepest experience is that to do a good job in supervision, we must be strict and serious and have a strong sense of responsibility. No matter how complicated the project is, as long as the supervisors can perform their duties in strict accordance with the construction norms and regulations, they can fully grasp the whole project dynamics and control the whole project quality. At the same time, supervisors have high professional quality, and can prompt each working procedure and every link in advance. It is of great help to our supervision work to nip the possible quality problems in the bud and prevent the links that may cause quality hidden dangers in advance, and it will certainly promote our work.

Although we have been working hard to do every job in a down-to-earth manner, there are still some shortcomings, such as poor on-site control and supervision, and confusion in filling in internal data. In view of the existing problems, it is reminded to continue to study construction specifications and test procedures seriously, be familiar with design drawings, improve professional level and self-quality, strengthen supervision, increase sampling frequency, keep abreast of construction trends and control construction quality.

With the strong support of the West Transit Highway Project Office and the Director's Office and the active cooperation of the contractor, we will continue to do a good job in the supervision test for XX years. The task of XX years is arduous, the workload is heavy, and the requirements for our testing work are more stringent. This requires each of our testers to control in advance, put an end to post-processing, have a serious and responsible working attitude, have a strong sense of responsibility, be fully familiar with and master business knowledge and skills, and make up for the shortcomings in the past. Strictly control the entry quality of engineering materials and the quality inspection of the construction site, be the patron saint of engineering quality, and establish a good corporate image for Hualujie Highway Engineering Technology Consulting Co., Ltd. in the construction of the western region.