Job Recruitment Website - Property management company - Weak current consumption standard
Weak current consumption standard
For important subsystems in intelligent system, such as computer network system, security closed-circuit television monitoring system, UPS uninterrupted power supply is generally considered. If UPS is centralized power supply, UPS and battery room should be considered. If UPS is distributed power supply mode, the occupied area of UPS and battery pack should be reserved when considering the area of weak electricity room.
Provide the setting requirements of weak current shaft for building specialty. In general engineering, the weak current shaft and the strong current shaft are set separately, and the position of the weak current shaft should ensure that the cable length to any computer information point on the plane does not exceed 90m. For buildings with large volume, long span or settlement joints, it is best to have multiple weak current shafts, each with an area of about 6 m2. If there are many cabinets, the area is 10 m2. Architects should understand that the current weak current shaft is not only a cable bridge, but also a floor setting room. The weak current shaft door opens outward, facing the public passage, and adopts fire doors.
Provide electrical equipment for electrical specialty, such as computer information point, TV terminal, TV front-end amplifier, distribution box, etc., and require electrical specialty to set up corresponding single-phase power socket. Generally, each computer information point is considered as 300W, and the distance between the power socket and the outer edge of the computer information socket is 200 mm.. And inform the calculation load of each plane computer information point (considering the simultaneous coefficient), and the power supply is provided by the electrical specialty. In general engineering, computer terminals are not powered by UPS in the computer room. In case of high requirements in important places, single-phase 500VAUPS power supply shall be provided. It is best to have a separate distribution box for the computer power supply in the office building, which is not used for general lighting.
Provide electrical professionals with electricity demand and calculation load for conference sound reinforcement, projection, video conference system, multimedia teaching system, electronic reading room, microcomputer classroom, parking lot management system management room, etc. The large screen display provides the area, and its load is about 700W/m2. Multi-function hall, great hall, theater, gymnasium, audio equipment and distribution box of lighting control system are set separately, and it is best that two boxes of power supply come from different transformers.
- Previous article:What's the telephone number of Zhengzhou Zhengdi Meijing Cheng Zihua Marketing Center?
- Next article:How about Green Bay Xingyuan?
- Related articles
- What is the telephone number of Guangxi Nanning Dinglong Property Service Co., Ltd.?
- How to deal with disputes between owners?
- How much is the price of Huanggang Dongcheng Happy Home?
- What is the basis for the property to estimate that the maintenance fee of equipment and facilities is 5% of the cost?
- What is the telephone number of the sales department of Houwan Garden at Suzhou Wharf?
- Where is the address of Seattle (store) in Xiamen?
- What fees do you need to pay for optical cables and base stations of mobile companies? Enter the property?
- Which developer is Huangshi Hongwei Tiandi?
- The main responsibilities of the capital airport street
- When will Qingdao Qingte Binhu International deliver the house?