Job Recruitment Website - Property management company - Standard parameters of Grade A office building
Standard parameters of Grade A office building
Building: its office area should exceed 50,000 square meters, and the building area of each floor must be kept at1500-2,000 square meters.
Frame: the lobby of the office building should be spacious, with more than three floors; Plateau ≥15 cm; In addition to the platform, the floor clear height is more than 2.7 meters; The channel width is 2 meters or more.
Parking: according to the total construction area of the building, a parking space is set up every 1.50 square meters, and automatic charging system and anti-theft safety system are set up for special above-ground and underground parking lots.
Elevator: according to the total construction area of the building, the service area of each passenger elevator does not exceed 4000 square meters; The waiting time shall not exceed 30 seconds; Separation of passengers and goods, at least two freight elevators, equipped with advanced intelligent control system.
Security: "Property rights are only rented and not sold, and a single property right is implemented." The person in charge said that it needs 24-hour security service and maintenance service, as well as business support. The top-floor office building must also have a dedicated passage for goods and people with disabilities, and the occupancy rate shall not be less than 70% within 1 2 years after completion. Elevator waiting time shall not exceed 40 seconds.
Building: the office area exceeds 20,000 square meters, and the floor area of each floor is not less than 65,438+0,000 square meters. 1-2 years occupancy rate is not less than 65%.
Elevator: according to the standard, the elevator of Grade A office building should have high-grade decoration; According to the total construction area of the building, the service area of each passenger elevator does not exceed 5000 square meters; The waiting time shall not exceed 40 seconds; Separation of passengers and goods, with at least 1 freight elevator; There is a perfect and advanced intelligent control system.
Frame: The planning lobby of Grade A office building is spacious, with a height of more than three floors; Plateau ≥15 cm; The clear height of floors except the platform is about 2.7 meters.
Parking: according to the total construction area of the building, one parking space is allocated for every150-200m2; Equipped with dedicated above-ground and underground parking lots; Underground parking lot should be equipped with automatic billing system and anti-theft safety system. Provide maintenance service within 24 hours. "At present, the occupancy rate of high-end commercial office buildings in Chengdu has reached over 90%." The relevant person in charge of Chengdu Branch of Jones Lang LaSalle Surveyor (Shanghai) Co., Ltd., one of the "six major banks", said that the occupancy rate of Grade B commercial office buildings should not be less than 50%.
Building: its office area should exceed 10000 square meters, and the net area of single floor should not be less than 800 square meters.
Frame: The clear height of floors except the platform shall not be less than 2.5 meters, and a parking space shall be provided for every 300 square meters according to the total construction area.
Elevator: According to the total building area, the service area of each passenger elevator shall not exceed 6000m2, and the speed shall not be less than 3m/s. ..
Security: Property management should employ well-known domestic property management companies or local high-quality property management companies to provide repair service and maintenance service within 24 hours.
- Related articles
- What's the telephone number of Xi 'an Marketing Center in Li Shiyuan?
- How about Shaanxi Chengwei Industry (Group) Co., Ltd.
- What does Yahe Smart Home mean?
- Which public primary school should the children of Zhuhai Qianshan Gree Garden attend?
- What about Anyang Construction Engineering Co., Ltd.?
- Who is the developer of Baishan Lotus Garden?
- What is the situation of Vanke City Light Project?
- Is the developer responsible for force majeure?
- Property Xiangyidong
- How about Sichuan Guojia Property Service Co., Ltd.?